25.03.2017 Views

170324 For BOSSE at LAVA

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PORTFOLIO<br />

TEAM ARCHITECTS<br />

PALMERSTON NORTH


This Page has been<br />

intentionally left<br />

blank<br />

02


CONTENTS<br />

01<br />

02<br />

03<br />

04<br />

05<br />

06<br />

07<br />

08<br />

09<br />

10<br />

PARK DE HAUS<br />

NZDF V.C ELLIOT CLUB<br />

LIFE IS A PLAYGROUND<br />

DECONSTRUCTED BOX<br />

EXPRESSION<br />

ZAHAHA<br />

LIFE FULL OF STARS<br />

VULCAN STEEL HEAD OFFICE<br />

AIR MOVEMENTS TERMINAL<br />

GOLDEN GATE<br />

04<br />

06<br />

08<br />

10<br />

12<br />

14<br />

15<br />

18<br />

20<br />

22<br />

03


PARK DE HAUS / PARK ROAD, PALMERSTON NORTH<br />

RESIDENTIAL<br />

Combining Belgium influences and the essence of<br />

quintessenal kiwi lifestyle was one of the most<br />

significant design driver for this bi-cultural home. The<br />

fe<strong>at</strong>ure brick walls on either side of the <strong>at</strong>rium is laid in<br />

Flemish bond, the origin of which has its roots in Flanders,<br />

Belgium. Digital design str<strong>at</strong>egies were adopted to design<br />

and schedule the 3D brick artwork. The juxtaposion of<br />

warm and cold m<strong>at</strong>erials is also reflected in the interiors.<br />

Site configuraon lead to an axial arrangement and<br />

visual expression of the axis. Various building elements in<br />

different planes are aligned to cre<strong>at</strong>e visual imagery of<br />

an axis. Every space, including the art gallery, is carefully<br />

customised to suit the client’s need. The interior &<br />

exterior colour palee was inspired by the client’s art<br />

collecon. The house was designed with sustainable<br />

design principles to achieve higher energy performance.<br />

COMPLETION DATE<br />

2014<br />

DISCIPLINES<br />

Architecture<br />

Interior Deisgn<br />

Green Star Principles<br />

Cultural Fusion<br />

04


3D ARTWORK<br />

05


NZDF V.C ELLIOT CLUB / LINTON, PALMERSTON NORTH<br />

GOVERNMENT & INSTITUTIONAL<br />

This was the winning entry for an invited design<br />

compleon. The project incorporang sports bar,<br />

mulfuncon room, cafeteria with full commercial<br />

kitchen was designed to accommod<strong>at</strong>e more than 400<br />

p<strong>at</strong>rons. The over-arching design approach was to convey<br />

a sense of community village within a contemporary<br />

envelope th<strong>at</strong> brought together the exisng and new<br />

structures to efficiently maximise the surrounding site,<br />

views and general environment. Digital design str<strong>at</strong>egies<br />

were used to design and document the sculptural mber<br />

screen pre-fabric<strong>at</strong>ed out of lamin<strong>at</strong>ed mber beams.<br />

Sustainable design approach was one of the key<br />

drivers for the project right through all the design and<br />

construcon phases. Energy & ulity consultant,<br />

Enercon were the lead environmentally sustainable design<br />

consultant for the project who also conducted post<br />

occupaon energy audit to measure and<br />

re-confirm the energy performance of the building.<br />

COMPLETION DATE<br />

2016<br />

DISCIPLINES<br />

Architecture<br />

Design Document<strong>at</strong>ion<br />

Consultant Management<br />

Construction Management<br />

Interior Deisgn<br />

06


FLUID MOTION<br />

07


LIFE IS A PLAYGROUND / PALMERSTON NORTH<br />

EDUCATION<br />

This dream project had two hundred primary school<br />

kids as liens and a simple brief - to cre<strong>at</strong>e a new<br />

playground, a fort and a ship, th<strong>at</strong> challenges users more<br />

than current, off the shelf equipment. In response, it was<br />

designed as two gre<strong>at</strong> structures for a grassy knoll.<br />

Both have all manner of bridges, climbing structures<br />

and walkways. The window geometries and colours<br />

employed reinforce the playful purpose, while<br />

exterior boards are skilfully arranged to<br />

allow light and sir into the heart of the structure.<br />

COMPLETION DATE<br />

2014<br />

DISCIPLINES<br />

Architecture<br />

08


FORT IS A PLAYGROUND<br />

09


DECONSTRUCTED BOX / MASSEY UNIVERSITY<br />

EDUCATION<br />

This retro fit consisted of new wind lobby and<br />

refurbishment of entry foyer or a mul-storey social<br />

science tower. The design approach was more like a ‘set<br />

design’ for a movie. The design was approached as a<br />

‘befing inseron’ of a regular box into exisng<br />

building. The box is then de-constructed into mulple<br />

segments th<strong>at</strong> breaks the otherwise long and narrow space<br />

into different zones. Use of vinyl graphics, text and art<br />

installaon paly an important role and encourages the<br />

end-user to engage with the architecture of the lobby.<br />

COMPLETION DATE<br />

2014<br />

DISCIPLINES<br />

Architecture<br />

Interior Design<br />

10


GATEWAY<br />

11


EXPRESSION / PARK ROAD, PALMERSTON NORTH<br />

RESIDENTIAL<br />

The pin oak tree, th<strong>at</strong> is thought to be 70-90 years<br />

old, was one of the driving forces behind the massing<br />

of the building. The amalgamaon of the tradional<br />

forms and n<strong>at</strong>ural m<strong>at</strong>erials with contemporary design<br />

philosophy is an aempt to recall the history of the<br />

site, while emphasising the transion from past to<br />

present. N<strong>at</strong>ural cedar with tones of green on<br />

various building elements is intended to echo with the<br />

fe<strong>at</strong>ured pin oak tree. The leaves of pin oak are green, then<br />

red and finally yellow before the fall. To<br />

signify this journey tones of green, red and<br />

yellow ochre are used in controlled fashion<br />

throughout the building.Interior journey make<br />

seamless transion from larger volumes (family spaces)<br />

into the smaller volumes (inm<strong>at</strong>e &<br />

personal spaces). The house is also designed for<br />

the future, it has achieved 5-Star Life Mark rang.<br />

COMPLETION DATE<br />

2012<br />

DISCIPLINES<br />

Architecture<br />

Interior Design<br />

12


SPRING TIME<br />

13


ZAHAHA / JEWELLERY DESIGN<br />

RAPID PROTOTYPING<br />

“Zahaha” Earring and its subsequent generaons were<br />

inspired by the works of l<strong>at</strong>e dame Zaha Hadid’s.<br />

The profile curve of Zahaha is an approximaon of<br />

the curve between the head and neck of a female.<br />

These designs were cre<strong>at</strong>ed adopng generave<br />

design methodologies using sowares such as Rhinocerous<br />

4.0, Grasshopper and Genoform. The designs<br />

were then produced using rapid prototyping<br />

technology also known as 3D prinng through Shapeways.<br />

COMPLETION DATE<br />

2012<br />

DISCIPLINES<br />

Gener<strong>at</strong>ive Design<br />

Rapid Prototyping<br />

3D Printing<br />

14


CURVE OF ZAHA<br />

15


LIFE FULL OF STARS / CHRISTCHURCH QUAKE MEMORIAL<br />

COMPETITION<br />

This was a compleon entry for the Christchurch<br />

Earthquake Memorial th<strong>at</strong> was in the memory of 185<br />

people who lost their lived during the c<strong>at</strong>astrophic<br />

earthquake in Canterbury. A primary grid paern was<br />

cr<strong>at</strong>ed by plong exact earth co-ordin<strong>at</strong>es of the<br />

major quake and the subsequent aershocks. A<br />

secondary grid paern was cre<strong>at</strong>ed by plong exact earth<br />

co-ordin<strong>at</strong>es of all the locaons of 185 f<strong>at</strong>alies.<br />

The grids were superimposed over each other to cre<strong>at</strong>e a<br />

resultant grid paern th<strong>at</strong> was used to form various spaces,<br />

structure and the landscape paern. Algorithmic Design<br />

Str<strong>at</strong>egies were used to design and opmise the soluon.<br />

DISCIPLINES<br />

Competition Design<br />

Urban Design<br />

Co-ordin<strong>at</strong>es of the Earthquake & Major Aftershocks<br />

Co-ordin<strong>at</strong>es of f<strong>at</strong>alities<br />

16


SKY FULL OF STARS<br />

17


VULCAN STEEL HEAD OFFICE / PALMERSTON NORTH<br />

EDUCATION<br />

This addion of office building to exisng industrial<br />

building was designed in collaboraon with Silvester-Clark<br />

Consulng Engineers for Vulcan Steel. The conspicuous<br />

form with bold we<strong>at</strong>hered steel cladding is juxtaposed<br />

against exisng plain industrial vocabulary to clearly<br />

characterise corpor<strong>at</strong>e and industrial acvies. The<br />

choice of m<strong>at</strong>erial is the expression of the company’s<br />

core trade. Our scope included design, building consent<br />

documentaon and construcon documentaon.<br />

COMPLETION DATE<br />

2010<br />

DISCIPLINES<br />

Architecture<br />

Project Document<strong>at</strong>ion<br />

Construction Document<strong>at</strong>ion<br />

18


RUSTING AESTHETICS<br />

19


AIR MOVEMENTS TERMINAL NZDF / OHAKEA<br />

GOVERNMENT & INSTUTUTION<br />

The Air Movements Terminal was the final and<br />

flagship major building constructed under the<br />

Project Takini upgrade of Base Ohakea, c<strong>at</strong>ering<br />

for more than 500 users and mulple aircra <strong>at</strong> one<br />

me, it also serves as the base airside control centre<br />

and incorpor<strong>at</strong>es a mul-funcon events area with<br />

commercial kitchen and mulmedia facilies. Being a<br />

mulpurpose facility. This building has more than<br />

eight different operaonal mode. The facility provides<br />

the flexibility to securely accommod<strong>at</strong>e concurrent<br />

internaonal and domesc military flights. The design<br />

includes arrival and departure lounges, passenger<br />

processing area, baggage handling area, internaonal<br />

transfer and customs capability, operaons coordinaon<br />

and training facilies, as well as a dedic<strong>at</strong>ed freight handling<br />

facility. This project was delivered in J.V with BECA.<br />

COMPLETION DATE<br />

2014<br />

DISCIPLINES<br />

Architecture<br />

Interior Design<br />

20


AIR MOVEMENTS TERMINAL<br />

21


GOLDEN GATE / FEILDING<br />

RETAIL & HOSPITALITY<br />

The proposal includes conversion of exisng<br />

supermarket building and the site into a<br />

community focused retail & hospitality precinct.<br />

The site is loc<strong>at</strong>ed in the town of Feilding, th<strong>at</strong><br />

currently holds the official tle of ‘NZ’s most<br />

beauful large town’. Feilding is also known<br />

for its rich collecon of heritage and<br />

classical buildings. The proposed master<br />

planning soluon is the resultant of intense<br />

research and design discourse. Golden<br />

Raon & Sacred Geometry has been used as<br />

an over- arching design philosophy th<strong>at</strong> could<br />

integr<strong>at</strong>e both, the grammar of classical architecture<br />

and m<strong>at</strong>hemacal approximaon of beauty.<br />

COMPLETION DATE<br />

Ongoing<br />

DISCIPLINES<br />

Architecture<br />

Interior Design<br />

Urban Design<br />

Master Planning<br />

Design Document<strong>at</strong>ion<br />

Golden R<strong>at</strong>io (PHI) & Fibonacci Series - Planning<br />

22


Existing Golden Plan<br />

Supermarket<br />

PHI & Fibonacci Series - Structural Components<br />

23


Fibonacci Series - Facade Division<br />

PHI - Facade division<br />

PHI - Facade Openings<br />

24


FeildingMedical<br />

Andrew’s<br />

VideoShop/<br />

Unichem<br />

Feilding<br />

MyFarm<br />

Centre<br />

Furniture<br />

IceCream Parlor<br />

Pharmacy<br />

Computers<br />

McVeryCrawfordDealership<br />

RetailBlockD<br />

Outdoor<br />

Exhibion<br />

Areas<br />

RetailBlockA<br />

Arcade<br />

Amphithe<strong>at</strong>re<br />

AmayjenRestaurant<br />

RetailBlockC<br />

Outdoor<br />

Exhibion<br />

Area<br />

Preforming<br />

Stage<br />

RetailBlockB


Golden G<strong>at</strong>e-Elevaon

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!