Summary Average Price SM Jan 08 - CIDB

Summary Average Price SM Jan 08 - CIDB

Summary Average Price SM Jan 08 - CIDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Del or Ex <strong>Jan</strong>uary 20<strong>08</strong> (RM)<br />

Pulau<br />

Pinang<br />

Selangor Johor Kelantan Perak Pahang<br />

19 High Tensile Deformed Bars - 32mm, MS146 MT 14 del 2,328.00 2,328.00 2,328.00 2,328.00 2,328.00 2,328.00<br />

20 BRC Fabric - A6, MS145 m² 30 del 5.70 5.70 5.70 5.70 5.70 5.70<br />

21 BRC Fabric - A7, MS145 m² 30 del 7.98 7.98 7.98 7.98 7.98 7.98<br />

22 BRC Fabric - A8, MS145 m² 30 del 10.19 10.19 10.19 10.19 10.19 10.19<br />

23 BRC Fabric - A9, MS145 m² 30 del 13.23 13.23 13.23 13.23 13.23 13.23<br />

24 BRC Fabric - A10, MS145 m² 30 del 16.70 16.70 16.70 16.70 16.70 16.70<br />

25 Ready Mix Concrete - Normal Mix - Grade 10 m³ 30 del 144.33 136.00 140.67 132.33 116.00 134.33<br />

26 Ready Mix Concrete - Normal Mix - Grade 15 m³ 30 del 150.33 141.00 146.00 139.33 121.00 138.67<br />

27 Ready Mix Concrete - Normal Mix - Grade 20 m³ 30 del 155.00 145.67 151.00 146.00 126.00 144.00<br />

28 Ready Mix Concrete - Normal Mix - Grade 25 m³ 30 del 161.33 153.00 156.67 153.00 133.00 151.00<br />

29 Ready Mix Concrete - Normal Mix - Grade 30 m³ 30 del 170.00 160.67 163.33 160.33 141.00 159.67<br />

30 Ready Mix Concrete - Normal Mix - Grade 35 m³ 30 del 179.00 170.00 170.00 176.00 150.00 168.00<br />

31 Ready Mix Concrete - Normal Mix - Grade 40 m³ 30 del 188.67 179.67 180.33 183.00 160.33 178.00<br />

32 Clay Brick - Pallet piece 30 del 0.26 0.25 0.25 0.28 0.26 0.26<br />

33 Smooth Face Facing Brick, Red piece 30 del 0.73 0.69 0.72 0.75 0.76 0.76<br />

34 Cement Sand Brick - Pallet piece 60 del 0.17 0.16 0.18 0.17 0.18 0.17<br />

35 Precast Concrete Hollow Block 90mm x 190mm x<br />

390mm M.S 27 1996<br />

Table 1. <strong>Average</strong> <strong>Price</strong> of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)<br />

No. Description Unit Credit<br />

Term<br />

(Days)<br />

Source of Data: This average price is compiled from data supplied by BMDAM<br />

MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit<br />

piece 60 del 1.72 1.60 1.72 1.72 1.65 1.72