C_TPLM30_67 Passing Guarantee
Get high success rate in C_TPLM30_67 Certification Exam with our exam PDF questions answers prepared by the authorized persons of Information Technology industry. For more info please visit here: https://www.certswarrior.com/exam/C_TPLM30_67/
Get high success rate in C_TPLM30_67 Certification Exam with our exam PDF questions answers prepared by the authorized persons of Information Technology industry. For more info please visit here: https://www.certswarrior.com/exam/C_TPLM30_67/
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SAP<br />
C_<strong>TPLM30</strong>_<strong>67</strong><br />
SAP Certified Application Associate - SAP Maintenance & Repair with ERP 6.0 EHP7<br />
For More Information:<br />
http://www.certswarrior.com/<br />
Features:<br />
‣ 90 Days Free Updates<br />
‣ 30 Days Money Back <strong>Guarantee</strong><br />
‣ Instant Download Once Purchased<br />
‣ 24/7 Online Chat Support<br />
Visit us athttps://www.certswarrior.com/exam/c_tplm30_<strong>67</strong>/
Question: 1<br />
How is a new functional location initially assigned to its place in the hierarchy?<br />
Please choose the correct answer.<br />
A. Automatically based on the structure indicator<br />
B. Manually using the List Editing transaction<br />
C. Automatically based on the Bill of Material (BOM)<br />
D. Manually using the Install transaction<br />
Question: 2<br />
Answer: A<br />
To which maintenance object types can you link a priority type?<br />
Note: There are 2 correct answers to this question.<br />
A. The combination of the order category and order type<br />
B. The order type only<br />
C. The notification type only<br />
D. The combination of the notification category and notification type<br />
Question: 3<br />
Answer: BD<br />
For which purpose do you use the sequence number in a cycle set?<br />
Please choose the correct answer.<br />
A. To sequence the operations in the task list assigned to a maintenance item<br />
B. To determine which strategy applies to each cycle<br />
C. To assign a cycle set to the task list of a maintenance item<br />
D. To assign the cycle set to a maintenance item<br />
Question: 4<br />
Answer: D<br />
You want to set up an external refurbishment process through subcontracting, using material<br />
requirements planning (MRP)? Which of the following must you set in the system?<br />
Visit us athttps://www.certswarrior.com/exam/c_tplm30_<strong>67</strong>/
Please choose the correct answer.<br />
A. The Special Procurement indicator in the material master record<br />
B. The Subcontracting flag for the refurbishment order type<br />
C. The Material Provision indicator for special stock in the refurbishment order header<br />
D. The Subcontracting flag in the refurbishment order header<br />
Question: 5<br />
Answer: A<br />
In order costing, what is the allocation structure used for?<br />
Please choose the correct answer.<br />
A. To provide a hierarchy structure for posting costs to the general ledger<br />
B. To provide a structure to summarize postings across cost elements<br />
C. To determine the cost element for debit to the order and credit from the order<br />
D. To determine the overhead costs that need to be applied to each cost element<br />
Answer: C<br />
Visit us athttps://www.certswarrior.com/exam/c_tplm30_<strong>67</strong>/
Powered by TCPDF (www.tcpdf.org)<br />
http://www.certswarrior.com/ Questions and Answers (PDF)<br />
For More Information – Visit link below:<br />
http://www.certswarrior.com<br />
20% Discount Coupon Code:<br />
20off2016<br />
Visit us athttps://www.certswarrior.com/exam/c_tplm30_<strong>67</strong>/<br />
http://www.certswarrior.com/exam/M2180-651/<br />
Page | 1