Conclusion (con ( con’t)<br />

• Hydro Dampers in initial test phase, first laboratory results expected July<br />

2010 – in case of succesful testing MENCK to adopt Hydrodampers instead<br />

of LBC for Frame-Noise Mitigation concept<br />

•Cofferdam-, Beka Shales concepts in design phase<br />

• alternative foundation concepts (suction, gravity, drilled, floating) are not<br />

yet mature for OWG requirements<br />

• New or alternative mitigation proposals for piling noise from everywhere<br />

appriciated<br />

• MENCK prefers handling friendly concepts (e.g. combine Noise Mitigation<br />

System with existing tools)<br />

• Ongoing projects have to provide/implement piling noise reduction system<br />

for construction approval and into construction phase