31.07.2017 Views

Contents

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

BUILD-ZONE<br />

TECHNICAL MANUAL


Build-Zone Technical Manual<br />

<strong>Contents</strong><br />

SECTION CHAPTER PAGE<br />

Part 1 Introduction 1: 1<br />

1.1 Build-Zone and the Technical Manual 1: 2<br />

1.2 Partners 1: 3<br />

1.3 How We Operate 1: 4<br />

1.4 Criteria for Technical Audits 1: 5<br />

Part 2 Build-Zone Requirements 2: 1<br />

2.1 General Requirements 2: 2<br />

2.2 Low and Zero Carbon Housing 2: 6<br />

2.3 Security 2: 7<br />

2.4 Establishing Fitness of Materials and Workmanship 2: 9<br />

2.5 Guidance for Innovative Designs and Construction Methods 2: 10<br />

2.6 Modern Methods of Construction (MMC) 2: 12<br />

2.7 Guidance on the Party Wall Etc Act 1996. 2: 19<br />

Part 3 Build-Zone On Site 3: 1<br />

3.1 Risk Management 3: 2<br />

3.2 Plan Check: Site and Construction Overview 3: 4<br />

3.3 Foundations – Warranty Key Stage 3: 7<br />

3.4 DPC/Oversite – Warranty Key Stage 3: 8<br />

3.5 Superstructure at Wallplate or Timber Frame Erected and Roof 3: 9<br />

Structure Completed – Warranty Key Stage<br />

3.6 Roof Structure or Timber Frame Erected and External Cladding Started 3: 11<br />

– Warranty Key Stage (Timber Frame Projects Only)<br />

3.7 Pre Plaster – First Fix 3: 13<br />

3.8 Post Plaster – Second Fix 3: 16<br />

3.9 Completion – Warranty Key Stage 3: 18<br />

<strong>Contents</strong> <strong>Contents</strong>: 3


Part 4 Site Investigation and Foundations 4: 1<br />

4.1 General 4: 2<br />

4.2 Site Investigation 4: 4<br />

4.3 Environmental Risk Assessment of Land 4: 7<br />

4.4 Japanese Knotweed 4: 17<br />

4.5 Foundations 4: 18<br />

4.6 Drainage 4: 41<br />

4.7 Basements 4: 52<br />

Part 5 Substructure & Ground Floors 5: 1<br />

5.1 Walls 5: 2<br />

5.2 Floors 5: 4<br />

Part 6 Superstructure 6: 1<br />

6.1 General 6: 2<br />

6.2 Materials 6: 4<br />

6.3 External Walls – Masonry 6: 11<br />

6.4 External Doors, Windows and Rooflights 6: 57<br />

6.5 Timber Frame 6: 70<br />

6.6 Steel Frame 6: 86<br />

6.7 Render 6: 91<br />

6.8 Curtain Walling 6: 94<br />

6.9 Cladding 6: 98<br />

6.10 Upper Floors 6: 101<br />

6.11 Sound Insulation 6: 112<br />

Part 7 Internal Works 7: 1<br />

7.1 General 7: 2<br />

7.2 Floors 7: 3<br />

7.3 Walls 7: 8<br />

7.4 Ceilings 7: 16<br />

7.5 Carpentry 7: 21<br />

7.6 Painting 7: 24<br />

Part 8 Roofs 8: 1<br />

8.1 Pitched Roofs 8: 2<br />

8.2 Flat Roofs 8: 28<br />

8.3 Rainwater Gutters and Downpipes 8: 32<br />

8.4 Balconies 8: 34<br />

<strong>Contents</strong> <strong>Contents</strong>: 4


Part 9 Services 9: 1<br />

9.1 General 9: 2<br />

9.2 Electrical Installations 9: 6<br />

9.3 Fuels 9: 17<br />

9.4 Plumbing/Heating 9: 21<br />

9.5 Above Ground Drainage 9: 26<br />

9.6 Ventilation 9: 29<br />

Part 10 External Works 10: 1<br />

10.1 General 10: 2<br />

10.2 Concrete Mixes 10: 4<br />

10.3 External Paths, Drives, Patios and Gardens 10: 5<br />

10.4 Walls 10: 11<br />

10.5 Garages and Small Outbuildings 10: 14<br />

10.6 Security 10: 16<br />

Part 11 Conversions 11: 1<br />

11.1 General 11: 2<br />

11.2 Ensuring Our Quick Assessment 11: 5<br />

11.3 Substructure 11: 8<br />

11.4 Superstructure 11: 21<br />

Part 12 Appendix 12: 1<br />

12.1 Appendix A – Approved Documents 12: 2<br />

12.2 Appendix B – Standards 12: 4<br />

12.3 Appendix C – Material Testing Facilities 12: 6<br />

<strong>Contents</strong> <strong>Contents</strong>: 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!