<strong>100</strong> <strong>Embankment</strong> – <strong>Greengate</strong> – <strong>Salford</strong> 5. <strong>Tender</strong> Breakdowns - Options 1 & 2
<strong>100</strong> <strong>Embankment</strong> – <strong>Greengate</strong> – <strong>Salford</strong> 5. <strong>Tender</strong> Breakdowns - Options 1 & 2 A <strong>Mechanical</strong> Services Option 1 - Ceiling Voids Grilles Diffusers <strong>and</strong> & Louvres 99,664.00 Fire Dampers 85,114.00 Sanitary Fittings 102,843.00 Ductwork Thermal Insulation 149,337.00 5A Total Sanitary Fittings 102,843.00 5G Total Ventilation 1,335,843.00 Above Ground Drainage 61,221.00 Gas Installation - Boilers 16,447.00 Rainwater Installation 61,673.00 Gas Proving Systems 1,561.00 5C Total Disposal Installation 122,894.00 5I Total Gas 18,008.00 Domestic Cold Water 97,076.00 Sprinklers (Excluding Void Protection) 529,667.00 Domestic Hot Water 86,223.00 Dry Riser 20,841.00 Domestic Water Treatment 1,313.00 Hydrant System 63,117.00 5D Total Domestic Water Installation 184,612.00 Void Protection 98,447.00 LPHW Boilers Gas Fired 41,221.00 5K Total Sprinklers 712,072.00 Pumps Etc 13,678.00 BMS Controls 306,671.00 Flues 4,136.00 <strong>Mechanical</strong> Control Wiring 34,887.00 5E Total Heat Source 59,035.00 5L Total Controls 341,558.00 LPHW Distribution 297,114.00 LPHW / DWS Diversions 28,996.00 Underfloor Heating 5,397.00 Gas Main Diversions 12,114.00 Radiators 11,678.00 Water Main Diversions 11,689.00 Water Flushing & Treatment 1,678.00 Gas Main to New Plantroom 8,321.00 Pipework Thermal Insulation 81,447.00 Water Main to New Plantroom 7,633.00 5F Total Space Heating 397,314.00 6C Total Diversions <strong>and</strong> External Works 68,753.00 Cooling Central Plant 156,778.00 Test <strong>and</strong> Commissioning 22,310.00 Cooling Fan Coils 301,447.00 As Fitteds <strong>and</strong> O&M Manuals 4,301.00 Cooling Distribution <strong>and</strong> Insulation 465,906.00 Contract Preliminaries 89,664.00 5F Total Cooling 924,131.00 Developing the detailed <strong>Mechanical</strong> Design 8,437.00 General Supply <strong>and</strong> Extract Ductwork 879,909.00 Stage E Design Validation 8,477.00 Air H<strong>and</strong>ling Units 83,223.00 Inflation <strong>and</strong> Risk - Included - Fans 7,463.00 Attenuators 8,799.00 Toilet Supply <strong>and</strong> Extract 22,334.00 Total <strong>Mechanical</strong> Services £ 4,400,252.00