POWER CONNECTIONS<br />

STEP03<br />

Connect any 6 power cables from the power supply<br />

to the power connections at the top of the miner. Also<br />

ensure that the fan power cable from the fan at the front<br />

of the miner is connected to the 4 pin power output on<br />

the top of the miner.<br />

POWER UP<br />

STEP04<br />

Power on the PSU and wait approximately 30 seconds<br />

for it to boot and commence running.