01.12.2017 Views

ELITE CONSTRUCTION VOL3 ISSUE11

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CUMBERNAULD’S HIGH RISE FLATS DEMOLISHED TO MAKE WAY<br />

FOR MODERN HOMES<br />

Sanctuary Cumbernauld a not-forprof<br />

’it social housing organisation began<br />

demolition of the f’irst three of twelve tower<br />

blocks in Cumbernauld Glasgow back in<br />

2015 as part of a modernisation drive that<br />

has seen 111 new homes built on the land<br />

so far.<br />

Bruce House, Buchan House and Douglas<br />

House on Allanfauld Road were levelled by a<br />

high-reach crane in the f’irst phase of a £75m<br />

project to clear all tower blocks from the<br />

town skyline. Rubble from the former towers<br />

were treated and crushed before being used<br />

to level the site.<br />

Out dated High-rises in Cumbernauld demolished<br />

Councillor Sam Love, North Lanarkshire<br />

Council’s convener of housing & social work<br />

services, commented: “These Seafar towers<br />

were well known local landmarks and will<br />

hold fond memories for many who stayed<br />

in them over the years, but they were in<br />

desperate need of replacing.”<br />

“The council was delighted to be supporting<br />

Sanctuary’s plans and I’m sure the people of<br />

Cumbernauld were looking forward to the<br />

new homes being built.”<br />

Elite caught up with Peter Martin, Sanctuary<br />

Group director he said: “We are delighted to<br />

have built more affordable homes that will<br />

help secure Cumbernauld’s future.”<br />

“Thanks to Main Contractors Cruden<br />

Building - the project has created various<br />

apprenticeships and work placement<br />

opportunities for the local residents, as well<br />

as the111 new f’lats.”<br />

Nine of Cumbernauld’s 12 high-rises remain<br />

standing. By 2021, a total investment<br />

exceeding £75 million will create more<br />

than 400 new homes to replace the ageing<br />

blocks. Cruden Building have been selected<br />

principal contractors for the scheme.<br />

Demolition of Cumbernaulds High-rise<br />

01569 767123<br />

deesidetimberframe.com<br />

Why choose Deeside Timberframe?<br />

• Only uses timber sourced<br />

from well-managed,<br />

sustainable sources.<br />

• One of only a few Timber<br />

Frame manufacturers in the<br />

UK to provide an accredited<br />

Chain of Custody, evidence<br />

that the timber used comes<br />

from a sustainable managed<br />

forest.<br />

• An ability to not only meet<br />

but easily exceed Building<br />

Standardsdesign to enhance<br />

the whole-life energy<br />

eff’iciency of residential and<br />

commercial developments.<br />

Elite Publishing Limited | www.elitepublishing.co.uk<br />

11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!