Hensel Phelps Services - Consulting - Digital Brochure
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
FACILITY SOLUTIONS<br />
SPECIALIZED CONSTRUCTION<br />
FACILITY MANAGEMENT<br />
<strong>Consulting</strong> / Commissioning
CONSULTING / COMMISSIONING<br />
With expertise in all consulting services listed below, <strong>Hensel</strong> <strong>Phelps</strong> fully customizes<br />
all consulting programs to achieve your business goals, including:<br />
• Facility Assessments<br />
• Facility Management Planning<br />
• Facility Outsourcing<br />
• Energy Management<br />
• Life Cycle Cost Analysis<br />
• Issue Management<br />
• Reality Capture<br />
• Resource Management<br />
• Commissioning<br />
• Transitional <strong>Services</strong><br />
www.henselphelpsservices.com
FACILITY ASSESSMENTS<br />
Facility Assessments include physical walkthrough assessments to identify and<br />
make recommendations to remedy deferred maintenance and identify capital<br />
renewal and capital improvement projects. Typical survey components include<br />
electrical, HVAC, plumbing, lighting, fire protection, infrastructure, interiors,<br />
exteriors, foundations, elevators, site improvements, building enclosures, and roofs.<br />
www.henselphelpsservices.com
FACILITY MANAGEMENT PLANNING<br />
Facility Management Planning includes the review or development of a Facility<br />
Management Plan to ensure functionality of the built environment by integrating<br />
people, processes, and technology. Recommendations are made for the<br />
development and/or hiring of management and trade professionals, maintenance<br />
scheduling, work order management, purchasing / inventory management, quality<br />
control methods, and similar disciplines.<br />
www.henselphelpsservices.com
FACILITY OUTSOURCING<br />
Facility Outsourcing of the management of facilities, projects, transactions, portfolio<br />
administration, “soft services” and other functions reporting to a corporate real<br />
estate department has been an evolving trend for many years. <strong>Hensel</strong> <strong>Phelps</strong> and<br />
its strategic partners have participated in over 100 outsourcing processes and<br />
contract negotiations from one or more perspectives as corporate executives,<br />
service providers or consultants.<br />
<strong>Hensel</strong> <strong>Phelps</strong>’ consulting methodology includes over 50 tasks that are tailored for<br />
each client based on the services involved and sourcing strategy selected. The<br />
Facility Outsourcing opportunities for <strong>Hensel</strong> <strong>Phelps</strong> including the following:<br />
• Benchmarking<br />
• FRE / CRE Strategy<br />
• Process Improvement<br />
• RFP Development<br />
• RFP Process Management<br />
• Proposal Analysis and Recommendation<br />
• Sourcing Strategy<br />
www.henselphelpsservices.com
ENERGY MANAGEMENT<br />
Effective energy management is not only good for the bottom line, but is also<br />
an increasingly important aspect of corporate recognition and PR programs. By<br />
analyzing and managing utility and facility information, <strong>Hensel</strong> <strong>Phelps</strong>’ Active<br />
Energy Management <strong>Services</strong> is capable of delivering practical, cost-effective and<br />
scalable solutions for reaching long-term energy and resource conservation goals.<br />
<strong>Hensel</strong> <strong>Phelps</strong> is passionate about creating and adapting high performance<br />
buildings that get the most from every energy dollar, safeguarding our planet’s<br />
future generations.<br />
www.henselphelpsservices.com
LIFE CYCLE COST ANALYSIS<br />
The objective of a Life Cycle Cost Analysis (LCCA) is to evaluate materials and<br />
systems prior to, or early in, the design process in order to allow the owner to make<br />
informed decisions and reduce the typical value-engineering studies that occur on<br />
virtually every project.<br />
The LCCA can be applied for new construction, large-scale projects such as repurposing<br />
a facility, or for smaller tasks such as replacing building components. By<br />
exploring available options and identifying potential pitfalls at the start of a project,<br />
LCCA accounts for initial investment costs as well as long-term operational and<br />
expected maintenance / replacement expenses. Clients are then able to see the<br />
true cost of their project over the expected life of their investment.<br />
www.henselphelpsservices.com
ISSUE MANAGEMENT<br />
<strong>Hensel</strong> <strong>Phelps</strong> clients have many tools available for reducing maintenance costs<br />
and improving operating efficiencies. Integrated Work Management Systems<br />
(IWMS) have taken the guesswork out of maintenance service scheduling,<br />
and provide deep resources for trend analysis that can help manage systems<br />
efficiencies and uptime. IWMS is an integral part of most CMMS software and<br />
ensure client and tenant satisfaction by providing work order tracking functions.<br />
With a multitude of options available, <strong>Hensel</strong> <strong>Phelps</strong> has helped many clients<br />
to find the system that best meets their maintenance, operations, and budget<br />
requirements. If you are considering a CMMS / IWMS for your new or existing<br />
facility, <strong>Hensel</strong> <strong>Phelps</strong>’ facility experts can help you find the perfect match for your<br />
facility and provide implementation leadership or support.<br />
www.henselphelpsservices.com
REALITY CAPTURE<br />
<strong>Hensel</strong> <strong>Phelps</strong>’ reality capture technology provides a real-time dimensional<br />
scanning solution to document existing conditions and provide a baseline facility<br />
model.<br />
Building Information Modeling (BIM) has become standard practice for design<br />
and construction, but often little attention is paid to what happens to the building<br />
model data during operation. <strong>Hensel</strong> <strong>Phelps</strong> engages clients to consider ways to<br />
effectively utilize Facility Management BIM data to improve the entire lifecycle of a<br />
building – resulting in significant long-lasting benefits.<br />
www.henselphelpsservices.com
RESOURCE MANAGEMENT<br />
Resource Management is directed toward optimizing the efficiency of organizational<br />
resources and processes. This involves the identification of routine and preventative<br />
maintenance scheduling, workload analysis, and requirements for staff certifications<br />
and training necessary to deliver the appropriate client services.<br />
www.henselphelpsservices.com
TRANSITIONAL SERVICES<br />
<strong>Hensel</strong> <strong>Phelps</strong> provides seamless transitional activities for mission critical facilities<br />
to support successful operations, in both active buildings and/or following design<br />
and construction. The <strong>Services</strong> Group transition team specializes in a consistent,<br />
multi-step process that drives a smooth transition for a thriving work environment.<br />
Through forward-looking analysis of the following elements, <strong>Hensel</strong> <strong>Phelps</strong>’ Subject<br />
Matter Experts have successfully transitioned millions of square feet of assets for<br />
clients.<br />
• Transitional Solutions – Occupancy (TSO)<br />
• Commissioning (Cx)<br />
• Key Performance Indicators (KPIs)<br />
• Root Cause Analysis<br />
www.henselphelpsservices.com
TRANSITIONAL SOLUTIONS – OCCUPANCY (TSO)<br />
<strong>Hensel</strong> <strong>Phelps</strong>’ Transitional Solutions – Occupancy (TSO) is a proven transition<br />
process that focuses on delivery of stabilized facility operations. The TSO process<br />
has been developed and refined over decades of facility operations. <strong>Hensel</strong> <strong>Phelps</strong><br />
provides a custom approach to transitioning to facility operation stabilization for<br />
new facilities, vendor transitions, and/or other transitional situations.<br />
This structured approach provides a seamless and proven platform for immediate<br />
success in maintaining the building infrastructure on Day One. The outcome from<br />
the initial stages of TSO is a facility playbook for operational processes, procedures<br />
and training. As a result of the final two stages, the TSO process creates long-term<br />
bottom-line benefits through asset preservation, energy consumption savings, and<br />
optimized facility life cycle costs. The components of TSO include the following:<br />
• Benchmarking<br />
• Commissioning<br />
• Key Performance Indicators (KPIs)<br />
• Root Cause Analysis<br />
www.henselphelpsservices.com
BENCHMARKING<br />
From six decades of delivering or managing facilities, <strong>Hensel</strong> <strong>Phelps</strong>’ first-hand<br />
experience with measurement and benchmarking covers a broad spectrum of<br />
facility types. <strong>Hensel</strong> <strong>Phelps</strong> uses benchmarking for all clients within our portfolio<br />
to reduce facility costs without negatively impacting the quality of deliverables<br />
or the critical business practices that affect the organization’s objectives. This<br />
benchmarking is tied into a Key Performance Indicator (KPI) program – a formal<br />
measurement tool <strong>Hensel</strong> <strong>Phelps</strong> uses to determine how well facility objectives are<br />
being met and where the facility management process can be improved.<br />
<strong>Hensel</strong> <strong>Phelps</strong>’ metrics and reporting tools produce detailed records for the<br />
following:<br />
• Key Performance Indicators<br />
• Service Level Agreements<br />
• Energy<br />
• Environmental<br />
• Benchmarking<br />
www.henselphelpsservices.com
COMMISSIONING (Cx)<br />
<strong>Hensel</strong> <strong>Phelps</strong>’ Commissioning <strong>Services</strong> are executed using a proven process that<br />
ensures the entire building operates in accordance with the design intent.<br />
Whether designed for occupancy, manufacturing, or services, every building has<br />
unique characteristics that must be recognized and accounted for during the<br />
commissioning phase. <strong>Hensel</strong> <strong>Phelps</strong>’ Commissioning <strong>Services</strong>, whether for new<br />
or mature facilities, provide Day One stability in building operations, and ensure<br />
control mechanisms are in place to extend the useful life of building systems and<br />
maximize their efficiency.<br />
<strong>Hensel</strong> <strong>Phelps</strong> provides three primary levels of commissioning, including:<br />
• Commissioning takes place in new buildings.<br />
• Retrocommissioning is the application of the commissioning process to existing<br />
buildings.<br />
• Recommissioning is the application of commissioning that occurs when a building<br />
that has already been commissioned undergoes another commissioning process.<br />
www.henselphelpsservices.com
KEY PERFORMANCE INDICATORS (KPIs)<br />
<strong>Hensel</strong> <strong>Phelps</strong> works closely with clients and key stakeholders to develop and<br />
implement Key Performance Indicators (KPIs) that focus on the business and<br />
performance objectives that are critical to the mission and goals of clients.<br />
<strong>Hensel</strong> <strong>Phelps</strong> assesses and refines facilities management processes to produce<br />
better results at lower cost. KPIs are used to: measure performance against Service<br />
Level Agreements (SLA); measure performance targets; conduct Root Cause<br />
Analysis and improvement plans; and adjust SLAs.<br />
www.henselphelpsservices.com
ROOT CAUSE ANALYSIS<br />
<strong>Hensel</strong> <strong>Phelps</strong>’ Subject Matter Experts (SME) understand today’s complex<br />
operational environments, and they are adept at identifying and solving problems<br />
that occasionally arise.<br />
Due to the complex nature of today’s buildings, facilities, and campuses, their<br />
highly technical and inter-dependent systems can result in performance and system<br />
failures. The root cause of a failure in one system may be caused by a problem in a<br />
different system.<br />
When a recurring problem or issue is identified, <strong>Hensel</strong> <strong>Phelps</strong> will ensure that the<br />
root cause is identified so that a lasting and meaningful resolution can be put in<br />
place.<br />
www.henselphelpsservices.com
CONTACT<br />
Joel Douglass, DBIA<br />
Executive Director<br />
571.246.2122 | Phone<br />
JDouglass@henselphelps.com<br />
Ray Cullen, DBIA<br />
Director – Facility Solutions<br />
970.346.7282 | Phone<br />
RCullen@henselphelps.com<br />
Paul Rampaart<br />
Director – Technical Solutions<br />
602.337.1180 | Phone<br />
PRampaart@henselphelps.com