CC1801
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CONTENTS<br />
JANUARY/FEBRUARY 2018<br />
CONTENTS<br />
TALKING TO MACHINES 12<br />
The construction industry can increase<br />
productivity and quality while reducing energy<br />
consumption, lowering costs and saving time<br />
through creating strong links between designing<br />
and making<br />
VECTORWORKS 2018 16<br />
Vectorworks 2018 enhances the Vectorworks<br />
portfolio, improving access to a flexible and<br />
diverse set of new and existing design features<br />
A SEISMIC CHALLENGE 22<br />
The Grasshopper-ARCHICAD Live Connection<br />
V2.0 helped in the digital reconstruction of<br />
historic buildings, destroyed in the August 2016<br />
earthquakes in Italy<br />
IMPERATIVES FOR CHANGE 24<br />
Industry, infrastructure and information are a<br />
trio of imperatives that give construction no<br />
choice but to continue its drive for change,<br />
writes By Ben Taunt at Elecosoft<br />
I NEWS................................................INDUSTRY NEWS....................................................................................................6<br />
• WEB-BASED, REAL-TIME CHANGE DETECTION SOFTWARE • HS2 AWARDED BREEAM INFRASTRUCTURE SCHEME CERTIFICATE<br />
CASE STUDY....................................WHAT GOES AROUND.....................................................................................10<br />
• A HISTORICAL ROUNDHOUSE HAS BEEN RECREATED IN SCOTLAND WITH THE HELP OF TRIMBLE SOFTWARE<br />
CASE STUDY...................................EMBRACING INFORMATION MANAGEMENT....................................................14<br />
• MMB INTEGRATES BENTLEY PROJECTWISE WITHIN OPENPLANT TO ENHANCE ITS INFORMATION MANAGEMENT<br />
EVENT FOCUS.................................INFORMATION EXCHANGE..............................................................................18<br />
• THE FUTURE OF INFORMATION MANAGEMENT WAS THE HOT TOPIC AT THE TAKE CONTROL SEMINAR Q AND A<br />
SOFTWARE REVIEW........................A DIGITAL STRATEGY.........................................................................................26<br />
• HOW DOES IFS APPLICATIONS 9 HELP TO COUNTER THE 'CARILLION EFFECT'?<br />
SOFTWARE REVIEW........................ALLPLAN BIMPLUS.............................................................................................28<br />
• WHY ALLPLAN BIMPLUS IS THE KEY TO SUCCESSFUL PROJECT DELIVERY<br />
SOFTWARE REVIEW........................AUTODESK BIM 360...........................................................................................30<br />
• LIFECYCLE MANAGEMENT FOR CONSTRUCTION PROJECTS IS ENHANCED WITH AUTODESK BIM 360<br />
TRAINING MAP................................AUTODESK TRAINING........................................................................................32<br />
• YOUR GUIDE TO AUTODESK TRAINING<br />
CASE STUDY...................................MUD, MUD, INGLORIOUS MUD!........................................................................34<br />
• FAILED PROJECTS CAN OFTEN PROVIDE MORE VALUABLE LESSIONS THAN SUCCESSFUL ONES<br />
January/February 2018 3