- Page 1 and 2: Break 20180528-1043hrs Charlie Chon
- Page 3 and 4: h) tube-bundle removal clearance; i
- Page 5 and 6: Flow-induced Vibration Analysis Cha
- Page 7: a) full views and cross-sectional v
- Page 11 and 12: Heat exchangers BOWMAN Solar 70 Tit
- Page 13 and 14: c) details of each pressure-retaini
- Page 15 and 16: • 6.2.5 The vendor shall submit d
- Page 17 and 18: f) temperature charts of all post-w
- Page 19 and 20: 7.2 Cladding for corrosion allowanc
- Page 21 and 22: Cladding For Corrosion Allowance Ch
- Page 23 and 24: Tantalum Shell And Tube Heat Exchan
- Page 25 and 26: Titanium Shell And Tube Heat Exchan
- Page 27 and 28: 7.3 Shell supports 7.3.1 The fixed
- Page 29 and 30: Shell supports The fixed shell supp
- Page 31 and 32: W: The width of the slot shall be e
- Page 33 and 34: 7.5.3 Packed floating-head tailpipe
- Page 35 and 36: Rear Floating Head Allowed- AFS S C
- Page 37 and 38: Rear Floating Head Allowed- AET Typ
- Page 39 and 40: Typical designs for floating-head c
- Page 41 and 42: Typical designs for floating-head c
- Page 43 and 44: Floating Head with Packing Device P
- Page 45 and 46: Shell-and-Tube Heat Exchangers Char
- Page 47 and 48: 7.6 Tube bundle 7.6.1 Tubes 7.6.1.1
- Page 49 and 50: Minimum wall thickness of tubes Mat
- Page 51 and 52: Minimum wall thickness of tubes - D
- Page 53 and 54: Minimum wall thickness of tubes - H
- Page 55 and 56: Minimum wall thickness of tubes - T
- Page 57 and 58: Galvanic Series In Sea Water The ga
- Page 59 and 60:
7 .6.2 Tubesheets 7.6.2.1 For a ver
- Page 61 and 62:
Bonnet Stationary Head A full-diame
- Page 63 and 64:
7 .6.3 Baffles and support plates 7
- Page 65 and 66:
Longitudinal Baffles the minimum cl
- Page 67 and 68:
7.6.5 Bypass-sealing devices 7.6.5.
- Page 69 and 70:
Figure 2 - Typical cross-sections o
- Page 71 and 72:
Baffle Cut Charlie Chong/ Fion Zhan
- Page 73 and 74:
7.6.5.2 Peripheral bypass seals sha
- Page 75 and 76:
7 .6.5.3 Internal bypass seals shal
- Page 77 and 78:
Sealing Strip The function of the s
- Page 79 and 80:
7.6.6 Bundle skid bars 7.6.6.1 For
- Page 81 and 82:
Automation FTW24-120 Pro Tubesheet
- Page 83 and 84:
7. 7.5 Slip-on flanges shall not be
- Page 85 and 86:
1. Threaded flange 2. Thread 3. Pip
- Page 87 and 88:
1. Blind flange 2. Stud Bolt 3. Gas
- Page 89 and 90:
Type of Flange Connection - Swivel
- Page 91 and 92:
7.8 Flanged external girth joints 7
- Page 93 and 94:
7.8.6·Hardened washers shall be pr
- Page 95 and 96:
7 .9.2 Expansion joints made of thi
- Page 97 and 98:
Thin Walled Expansion Bellow They s
- Page 99 and 100:
Thin Walled Expansion Bellow They s
- Page 101 and 102:
Non-Thin Walled Expansion Bellow Ch
- Page 103 and 104:
Pass Partition Ribs shall be design
- Page 105 and 106:
7.10.7 Serrated gaskets shall compl
- Page 107 and 108:
7.11 Handling devices 7 .11.1 The l
- Page 109 and 110:
Handling Devices The lifting device
- Page 111 and 112:
Handling Devices The lifting device
- Page 113 and 114:
Skid In Charlie Chong/ Fion Zhang
- Page 115 and 116:
Charlie Chong/ Fion Zhang 20180531
- Page 117 and 118:
Charlie Chong/ Fion Zhang