15.12.2012 Views

POAC 09 - Bedford Institute of Oceanography

POAC 09 - Bedford Institute of Oceanography

POAC 09 - Bedford Institute of Oceanography

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Fig. 6. Trajectories <strong>of</strong> ice beacons deployed on ice island between 15 Sept and 18 Nov 2008. The<br />

blue line represents the Argos ice beacon and the red line represents the Iridium GPS beacon.<br />

Fig. 7. Six-hourly wind velocity at 75°N, 82.5°W (top panel), and velocity <strong>of</strong> ice island (bottom<br />

panel).<br />

Plots <strong>of</strong> the latitude and longitude show that ice island stopped suddenly on day 266 and<br />

remained stationary for about 1 day (22-23 Sept), suggesting it grounded (Fig. 8). The GPS data

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!