16.12.2012 Views

oklahoma department of environmental quality 1 - the Oklahoma ...

oklahoma department of environmental quality 1 - the Oklahoma ...

oklahoma department of environmental quality 1 - the Oklahoma ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Logan County Rural Water District No. 2<br />

Project: Construct 2 New Water Wells<br />

Install New Water Lines<br />

Construct New Water Storage Standpipe<br />

DWSRF Loan Amount $ 640,678.52<br />

ARRA Principal Forgiveness Amount $ 279,321.48<br />

Total Project Cost $ 920,000.00<br />

• Logan County Rural Water District No. 2 owns and operates its water<br />

supply facilities. The District has 399 service connections and serves approximately<br />

1,146 residential and 635 wholesale customers. The water<br />

wells currently in use by Logan #2 are in violation <strong>of</strong> water standards<br />

by exceeding <strong>the</strong> nitrate Maximum Contaminant Level (MCL). The proposed<br />

project is aimed at reducing nitrate levels in <strong>the</strong>ir finished water.<br />

The proposed project includes:<br />

(a) Construction <strong>of</strong> two new water wells.<br />

(b) Construction <strong>of</strong> two new well houses.<br />

(c) Installation <strong>of</strong> approximately 2,300 linear feet <strong>of</strong> 6-inch and 4,600<br />

linear feet <strong>of</strong> 8-inch water lines.<br />

(d) Construction <strong>of</strong> a new standpipe <strong>of</strong> 20 feet diameter by 120 feet<br />

high.<br />

• A groundbreaking ceremony was held at <strong>the</strong> construction site on October<br />

27th, 2009.<br />

• Special thanks should be given to <strong>the</strong> District Chairman, Art Platt, for his<br />

diligent effort and desire in getting all requirements timely completed<br />

to be awarded ARRA funding.<br />

— Tiger Feng, P.E., DWSRF Project Engineer<br />

Chairman: Art Platt<br />

District Manager: Wesley Short<br />

Design Engineer: Phil Brown, P.E., Brown Engineering, P.C., Stillwater, OK<br />

Prime Contractors: Ewbank, Inc. , Fairview, OK<br />

Bowen Construction, Inc., <strong>Oklahoma</strong> City, OK<br />

Calvin Mays Oilfield Services, Inc., Guthrie, OK<br />

Circle P. Welding, Inc., Norman, OK<br />

State Senator: Patrick Anderson<br />

State Representatives: Jason Murphey<br />

O K L A H O M A D E P A R T M E N T O F E N V I R O N M E N T A L Q U A L I T Y 2 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!