RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LTD<br />

System Parameters<br />

Water Level of major Reservoirs<br />

<strong>Position</strong> of Coal Stock at KTPS,STPS & CHHABRA<br />

Outage of major Generating Units<br />

LOAD DESPATCH CENTER ,HEERAPURA JAIPUR.<br />

<strong>Power</strong> <strong>Position</strong> <strong>24</strong>-<strong>Feb</strong>-<strong>12</strong><br />

Date-wise Energy Availability, Consumption, Peak Load & Average Frequency<br />

Energy Availability / Generation from different Sources<br />

1. Date-Wise Energy Availability, Consumption, Peak Load, Avg. Frequency –FEB. 20<strong>12</strong><br />

Point No.<br />

Date<br />

Anticipated Availability<br />

(In LU)<br />

Consumption<br />

(In LU)<br />

Peak Load<br />

(In MW)<br />

Average freq.<br />

(In Hz)<br />

<strong>Feb</strong>-<strong>12</strong> 20<strong>12</strong> 2011 20<strong>12</strong> 2011 20<strong>12</strong> 2011 20<strong>12</strong><br />

1-<strong>Feb</strong>-<strong>12</strong> 1390.75 1377.88 1551.40 1579.23 7<strong>24</strong>6 7228 49.76<br />

2-<strong>Feb</strong>-<strong>12</strong> 1380.72 1304.62 1565.25 1526.11 7093 7289 49.78<br />

3-<strong>Feb</strong>-<strong>12</strong> 1449.15 1385.76 1603.17 1536.03 7326 7270 49.77<br />

4-<strong>Feb</strong>-<strong>12</strong> 1433.16 1396.75 1585.<strong>24</strong> 16<strong>12</strong>.04 7264 7434 49.79<br />

5-<strong>Feb</strong>-<strong>12</strong> 1450.62 1362.31 1564.54 1591.00 7442 7356 49.84<br />

6-<strong>Feb</strong>-<strong>12</strong> 1475.02 1486.98 1611.26 1602.74 7417 7442 49.79<br />

7-<strong>Feb</strong>-<strong>12</strong> 1442.58 1419.00 1588.43 1570.25 7489 7199 49.76<br />

8-<strong>Feb</strong>-<strong>12</strong> 1470.17 1399.88 1597.64 1570.87 7365 7023 49.79<br />

9-<strong>Feb</strong>-<strong>12</strong> 1442.30 1394.07 1576.18 1589.50 7232 7176 49.80<br />

10 10-<strong>Feb</strong>-<strong>12</strong> F b <strong>12</strong> 1451 1451.06 06 1420 1420.91 91 1580 1580.05 05 1582 1582.28 28 7143 7084 49 49.81 81<br />

11-<strong>Feb</strong>-<strong>12</strong> 1461.22 1485.08 1598.92 1608.97 7463 7433 49.84<br />

<strong>12</strong>-<strong>Feb</strong>-<strong>12</strong> 1495.53 1490.42 <strong>12</strong>88.33 1611.75 7545 7268 49.91<br />

13-<strong>Feb</strong>-<strong>12</strong> 1514.53 1432.30 1598.70 1573.01 7417 7267 49.91<br />

14-<strong>Feb</strong>-<strong>12</strong> 1492.80 1455.38 1592.50 1442.91 7430 6893 49.82<br />

15-<strong>Feb</strong>-<strong>12</strong> 1487.83 <strong>12</strong>79.44 1609.02 <strong>12</strong>07.05 7411 6008 49.86<br />

16-<strong>Feb</strong>-<strong>12</strong> 1443.34 1157.66 1594.86 <strong>12</strong>90.77 7318 6202 49.84<br />

17-<strong>Feb</strong>-<strong>12</strong> 1492.20 <strong>12</strong>36.32 1598.72 1365.39 7377 6384 49.84<br />

18-<strong>Feb</strong>-<strong>12</strong> 1484.84 1303.87 1594.21 1415.04 7309 6653 49.84<br />

19-<strong>Feb</strong>-<strong>12</strong> 1442.89 1345.37 1569.91 1464.37 6982 6799 49.88<br />

20-<strong>Feb</strong>-<strong>12</strong> 1436.71 1330.57 1582.61 1391.75 7219 67<strong>12</strong> 49.87<br />

21-<strong>Feb</strong>-<strong>12</strong> 1400.94 1332.02 1568.56 1361.60 7279 6470 49.83<br />

22-<strong>Feb</strong>-<strong>12</strong> 1423.51 <strong>12</strong>98.11 1613.98 1434.35 7408 6668 49.84<br />

23-<strong>Feb</strong>-<strong>12</strong> 1405.54 1326.78 1603.55 1483.48 7371 7022 49.82<br />

<strong>24</strong>-<strong>Feb</strong>-<strong>12</strong><br />

25-<strong>Feb</strong>-<strong>12</strong><br />

26-<strong>Feb</strong>-<strong>12</strong><br />

27-<strong>Feb</strong>-<strong>12</strong><br />

28-<strong>Feb</strong>-<strong>12</strong><br />

29-<strong>Feb</strong>-<strong>12</strong><br />

1377.68 1366.67<br />

MAXIMUM<br />

OF THE<br />

MONTH<br />

1514.53 1490.42 1613.98 16<strong>12</strong>.04 7545.00 7442.00 49.91<br />

MAX.CONSUMPTION TILL DATE DURING THE FY 2011-<strong>12</strong> (L.U.)<br />

MAX.PEAK LOAD TILL DATE DURING THE FY 2011-<strong>12</strong> (MW)<br />

MAX.CONSUMPTION DURING THE FY 2010-11 (LU)<br />

MAX.PEAK LOAD DURING THE FY 2010-11 (MW)<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

1613.98 22-<strong>Feb</strong>-<strong>12</strong><br />

7545 (06.45.07.00 Hrs.) ON <strong>12</strong>.02.20<strong>12</strong><br />

1620.77 (22.01.11)<br />

7442 (<strong>12</strong>.15-<strong>12</strong>.30 Hrs.) ON 06.02.2011


LD Control Room Heerapura<br />

2.Anticipated Availability/Generation From Different Sources<br />

(In LU)<br />

S.No. Sources Available to <strong>Rajasthan</strong> / Installed<br />

Prior<br />

Capacity as on 31.01.20<strong>12</strong><br />

assessment of<br />

(In MW)<br />

Avail.<br />

Prior<br />

assessment of<br />

Avail. For next<br />

Day<br />

Actual<br />

Energy<br />

Received<br />

1 KTPS (1<strong>24</strong>0/1<strong>24</strong>0) 269.00<br />

23-<strong>Feb</strong>-<strong>12</strong><br />

269.00 279.48<br />

2 STPS (1500/1500) 266.00 266.00 269.70<br />

3 DHOLPUR GAS CCPP (330/330) 53.00 53.00 54.83<br />

4 RAMGARH (113.5/113.5) 11.00 11.00 10.93<br />

5 RAPP-A(300/300) 42.00 42.00 45.50<br />

6 MAHI (140/140) 8.00 8.00 6.33<br />

7 CHAMBAL (RPS+JS) (135.5/271) 35.00 35.00 42.05<br />

8 GIRAL LIGNITE (250/250) 0.00 0.00 0.00<br />

9 CHHABRA TPS (500/500) 49.00 63.00 65.36<br />

10 WIND FARM (1842.795/1842.795 ) 30.00 20.00 41.54<br />

11 SOLAR POWER(<strong>12</strong>7.5/<strong>12</strong>7.5) 0.00 0.00 3.40<br />

<strong>12</strong> CAPTIVE POWER PLANTS 3.85 3.85 3.91<br />

13 REGIONAL (INTRA STATE) O.A.(VLTPS) 0.00 0.00 0.00<br />

14 OPEN ACCESS 9.38 5.32 5.32<br />

15 BIOMASS – (91.30/91.30) 10.00 9.00 10.55<br />

16 BARSINGHSAR LTPS(250/250) <strong>24</strong>.00 35.00 27.34<br />

17 RAJWEST (540/540) 104.00 104.00 108.00<br />

TOTAL : 1-17 914.23 9<strong>24</strong>.17 974.<strong>24</strong><br />

18 BBMB COMPLEX<br />

a) BHAKRA(225.30/1478.73) 29.27 29.18 28.88<br />

b) DEHAR (198/ 990) 6.63 8.14 8.79<br />

c) PONG (231.66/396) <strong>24</strong>.85 26.66 <strong>24</strong>.93<br />

TOTAL : A TO C 60.75 63.98 62.60<br />

19 CENTRAL STATIONS<br />

d) SINGRAULI (300/ 2000) 86.69 84.22 85.08<br />

e) RIHAND (195/2000) 60.40 60.40 60.40<br />

f) UNCHAHAR-I(19.99/420) 5.73 5.73 5.68<br />

g) UNCHAHAR-II& III(61/630) 19.19 19.19 19.19<br />

h) INDIRA GANDHI STPS(JHAJHAR) (5.89/500) 000 0.00 000 0.00 000 0.00<br />

i) NCTPS DADRI St-II ( 9.9/100) 8.14 8.14 8.14<br />

j) DADRI GAS (77/830) 11.62 10.38 10.46<br />

k) NCTPS DADRI St-II ( 9.9/100) 16.60 15.50 15.76<br />

l) AURAIYA (61.03/663) 9.91 9.46 9.53<br />

m) NAPP (44/440) 3.93 3.96 3.96<br />

n) RAPP-B (<strong>12</strong>5/440) 36.07 35.99 35.99<br />

o) RAPP-C (88/440) 22.03 22.03 22.03<br />

p) SALAL (20.36/690) 1.<strong>12</strong> 1.25 1.62<br />

q) URI (43.01/480) 9.52 7.80 8.87<br />

r) TANAKPUR (10.86/94) 0.26 0.27 0.25<br />

s) CHAMERA –I (105.84/540) 7.06 4.06 4.06<br />

t) CHAMERA-II (29.01/300) 2.04 1.78 2.32<br />

u) DHAULIGANGA (27/280) 0.94 0.96 0.96<br />

v) DULHASTI (42.42/390) 0.00 0.00 0.00<br />

w) SEWA (13/<strong>12</strong>0) 3.49 3.55 3.55<br />

x) NJPC (1<strong>12</strong>.05/1500) 5.40 5.22 5.22<br />

y) TEHRI (75/1000) 7.00 7.00 7.00<br />

z) KOTESHWR ( 9.9/100) 2.69 2.79 2.79<br />

aa) FRKKA+KHLGN+TLCHR (98.09/3440) 22.32 22.29 22.29<br />

ab) TALA 0.21 0.17 0.17<br />

ac) URS POWER 0.00 0.00 0.00<br />

TOTAL SCHEDULED(a TO ac) 403.<strong>12</strong> 396.<strong>12</strong> 397.92<br />

LOSSES -15.02 -14.79 -14.84<br />

NET SCHEDULED 388.10 381.34 383.08<br />

20 BILATERAL (REG.) EXCL. BANKING 0.00 0.00 0.00<br />

21 BANKING 71.35 71.35 71.35<br />

22 BILATERAL(INTER-REG.). EXCLUDING<br />

(ISOA & BANKING)<br />

8.08 8.08 8.08<br />

23 INTER STATE OPEN ACCESS<br />

(BILATERAL+IEX)<br />

-9.38 -5.31 -5.32<br />

<strong>24</strong> INDIAN ENERGY EXCHANGE 4.90 25.92 25.92<br />

TOTAL(B): (18 TO <strong>24</strong>) 463.05 481.37 483.<strong>12</strong><br />

TOTAL GENERATION : 1 TO <strong>24</strong> 1457.36<br />

OVER DRAWAL (+)/UNDER DRAWAL (-) 146.19<br />

GRAND TOTAL 1377.28 1405.54 1603.55<br />

LAST YEAR 1366.67 1326.78 1483.48


3.SYSTEM PARAMETERS AS ON 23-<strong>Feb</strong>-<strong>12</strong><br />

Maximum drawl on 23-<strong>Feb</strong>-<strong>12</strong> 7371 MW at 00.15-00.30 Hrs 49.78 HZ<br />

Minimum drawl on 23-<strong>Feb</strong>-<strong>12</strong> 5905 MW at 18.00-18.15 Hrs. 49.97 Hz<br />

Max U/D of the day 65 MW at 06.45-07.00 Hrs. 49.55 Hz<br />

Max. O/D below 49.5 Hz <strong>12</strong>74 MW at 00.45-01.00 Hrs 49.49 Hz<br />

No. of Blocks Freq. < 49.5 Hz 1<br />

No. of Violation Blocks Freq. < 49.5 Hz 1<br />

No. of Blocks Freq. >= 49.5 & = 49.5 &