SEC Portfolio 2018
Showcasing our skills & capabilities at the forefront of the construction industry.
Showcasing our skills & capabilities at the forefront of the construction industry.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
COMMERCIAL <strong>SEC</strong>TOR AND LOCAL AUTHORITY PROJECTS<br />
MAHLE, Power Train, Northampton<br />
<strong>SEC</strong>’s neighbours MAHLE have invested £8 million in this new ‘State of the Art’<br />
test facility. The new site will become the campaigns global centre for (RDE)<br />
“Real Dimming Emissions”. The development of this facility is to respond to the<br />
new European wide emission tests introduced in September 2017, another project<br />
where <strong>SEC</strong> have contributed to keeping the carbon footprint to a minimum.<br />
Teaming alongside a local Mechanical Contractor to provide a fully integrated<br />
M&E package, our installations began at the client supplied Transformer and<br />
<strong>SEC</strong> provided the LV connections for the new facility.<br />
A new 2500A bespoke arrangement Switch Panel provides power to Distribution<br />
Boards, Mechanical Plant, Lighting, Small Power, Fire, Security systems, Access<br />
Control, External Services.<br />
Project Value: £350,000<br />
Main Contractor: J Coffey Construction<br />
Services Included: LV Distribution, LV Switchgear and Cabling, Small Power,<br />
General & Emergency Lighting, External Lighting, Earthing and Bonding, Telecommunications,<br />
Access Control, Intruder Alarm, CCTV, Fire Alarm, Assistance<br />
Call Systems, Lightning Protection.<br />
Saints, Franklins Gardens, Northampton — New Barwell Stand<br />
<strong>SEC</strong> have recently completed the electrical works to the new Barwell Stand at<br />
Northampton Saints. Working to a very tight deadline this intensive programme of<br />
works highlights our ability to get the job done on time. The new stands estimated<br />
cost of £6.5million has raised the stadiums capacity to nearly 16,000.<br />
Project Value: £700,000<br />
Main Contractor: Buckingham Group<br />
Services Included: Enabling Works, Mains Cabling, Lighting & Lighting Control<br />
Installation, Small Power, Fire Alarm, CCTV, Door Access, IT Cabling, Photovoltaic,<br />
Intruder Alarm, Lightning Protection, Data Communications. Reconfiguration of<br />
existing systems to allow for the demolition of the existing stand.<br />
Capital Park, Cambridge - Phase 2 (CPC2)<br />
The new CPC2 offers 40,190 sq. ft. (3,733 sq. m) of prestige Grade A office accommodation<br />
consisting of ground, first and second floors.<br />
The new development offers space to high-tech companies seeking a world renowned<br />
Cambridge address.<br />
Project Value: £500,000<br />
Main Contractor: Buckingham Group<br />
Services Included: Mains Cabling, Distribution, Generator, Containment, Lighting<br />
& Controls, Fire Alarm, Small Power, Feature Lighting, Intruder Alarm, Access<br />
Control, Photovoltaic Array, Car Charging Points, Lightning Protection, Disabled<br />
Refuge Alarm.