Saxwerk ongoing projects 2018
Overview of ongoing projects quarter of 2018.
Overview of ongoing projects quarter of 2018.
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Electrics project in Boden, Sweden<br />
Ash discharge System<br />
Ash discharge system to General Electrics project in Boden, Sweden<br />
discharge system for bottom ash to GE Power Sweden AB for ash handling system in boden <strong>Saxwerk</strong> has delivered complete<br />
system with sliding frame and the discharge screw.<br />
Technical data storage silos:<br />
Material:<br />
Bottom Ash<br />
Capacity: 120 m 3 /h<br />
Diameter silo bottom: 3 500 mm<br />
Height silo bottom: 1 600 mm<br />
Silo Volume: 300 m 3<br />
Sweden: Förrådsvägen 1, SE-137 37 Västerhaninge, Sweden | Phone: Int: +46 8 500 666 90 | E-mail: info@saxwek.se | Website: saxwerk.se<br />
Germany: Sellhorner Weg 28, D-29646 Bispingen, Germany | Phone: Int: +49 5194 4180 901| E-mail: info@saxwek.de | Website: saxwerk.de