Saxwerk ongoing projects 2018
Overview of ongoing projects quarter of 2018.
Overview of ongoing projects quarter of 2018.
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Siempelkamp, Germany<br />
Pushfloor Bunker with 4 Pullfoor<br />
Two 900 m³ bunker with 4 Pushfloor systems<br />
Delivery in 2017 engineering for two pushfloor<br />
bunker and the complete hydraulic components.<br />
Technical data storage silos:<br />
Material:<br />
Wood chips<br />
Capacity: 200 m 3 /h<br />
Storage length: 15 000 mm<br />
Storage Width : 6 000 mm<br />
Volume: 900 m 3<br />
Sweden: Förrådsvägen 1, SE-137 37 Västerhaninge, Sweden | Phone: Int: +46 8 500 666 90 | E-mail: info@saxwek.se | Website: saxwerk.se<br />
Germany: Sellhorner Weg 28, D-29646 Bispingen, Germany | Phone: Int: +49 5194 4180 901| E-mail: info@saxwek.de | Website: saxwerk.de