Profile
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
NORAS AL JAZEERA<br />
ROAD CONTRACTING L.L.C
1<br />
Our Distinguishing Strengths Are The Quality Of Our Contraction<br />
Work And Quality Of The People Who Commit Them Selves To<br />
The Company’s Success.<br />
We Achieve These High Standard By Attracting And Training The<br />
Most Talented People In The Contracting Sector.<br />
These Standard Goals Are The Foundation Of The Company’s<br />
Reputation And They Are The Vision That Makes Us Prosper<br />
Shiban Al Falahi<br />
General Manager
2<br />
Company <strong>Profile</strong><br />
NORAS AL JAZEERA<br />
Road contracting L.L.C<br />
Tel : +971 4 333 1392<br />
Fax : +971 4 333 1382<br />
P.O Box : 76489<br />
Nadd Al Hamar, Dubai - UAE<br />
E-mail : info@noras-aljazeera.com<br />
Web : www.noras-aljazeera.com
3<br />
Business Activities<br />
Deep Excavation<br />
Excavation Between Piles<br />
Backfilling, Grading & Compaction<br />
Shifting of Stock Piles<br />
Construction of Access Roads for<br />
Tower Line Projects<br />
Shoring Works<br />
Demolitions Of Buildings<br />
Contruction Materials Supply<br />
Pile Concerete Breaking
4<br />
Contents<br />
Technical Background & Services<br />
Trade License<br />
Equipments List<br />
Certificates
Technical Background & Services<br />
We Are Carrying In The Name Of AL NOURAS EXPRESS GENERAL TRANSLPORT Having<br />
2 Branches Located At Dubai And Abu Dhabi. Recently Since The Increase In The Volume<br />
Of Earth Work We Are Carrying Business In Our New Trade Licenses In The Names Of AL<br />
NOURAS LAND DIGGING & FILLING L.L.C At 2018.<br />
We Are Carrying Business In Our Another Trade License In The Name Of<br />
NORAS AL JAZEERA ROAD CONTRACTING L.L.C.<br />
The Activities Of The Company Are As Under<br />
1.<br />
2.<br />
3.<br />
4.<br />
5.<br />
6.<br />
7.<br />
8.<br />
9.<br />
10.<br />
11.<br />
12.<br />
Demolishing Building and Other Constructions.<br />
Land Digging & Filling.<br />
General Transportation<br />
Excavation and Disposing Materials.<br />
Levelling Sites.<br />
Loading & Unloading Commodities & Passenger Lauggages.<br />
Frieght Clearing Services.<br />
Lugguage Packing Services.<br />
Land Frieght Services for Goods.<br />
Air Frieght Services for Goods.<br />
Marine Fright Services For Goods.<br />
Ship Loading & Unloading.<br />
We Have A Competant Team Of Peoples Who Will Provide You With The Best Tehnical And<br />
Professional Expertise. We Assuare You That Our Expertise Emcompasses The Entire Field<br />
Of Earth Works, Excavation And Also Building Material Supply And That We Are Truly A<br />
‘One Stop Solution’ For All Your Major Needs.<br />
Noras Al Jazeera Is Synonymus With Efficient Performance, High Quality, Customer<br />
Satisfaction And Cutting Edge Professionalism.<br />
As Per Company Employee List Which Attached To The Staff Of Al Nouras Express.<br />
Noras Al Jazeera Recorded An Excavation Of<br />
25,000 Cum In A Day And Another 10,000 Cum<br />
From Single Site In A Day. Most Often It Has<br />
Accomplished Its Projects Well Ahead Of All<br />
Schedules.<br />
We Are Looking Forward To Meeting You In The<br />
Near And Explain Our Capabilities, Ideas,<br />
Approaches And Hope That We May Work<br />
Togeather As Partners In Future.<br />
5<br />
General Transport Includes<br />
989 Employees in 11 Divisions<br />
1. Inside Transport<br />
2. Outside Transport<br />
3. Kipper Truck<br />
4. Heavy Vehicle<br />
5. Tanker<br />
6. Crane<br />
7. Earth Works<br />
8. Accountants<br />
9. Engineers<br />
10. Foremans<br />
11. Supervisors
6
7
8
List of plant & Equipments<br />
Based From Rta Records The Total Of That Machines Is Morethan 789 Vehicles That Our<br />
Company Used In Excavation Work, Disposing And Other Scope Of Works That Related<br />
Into Transporating Jobs Also We Have Some Kind Of Machines Into Our Co Associated<br />
Companies.<br />
1.<br />
2.<br />
3.<br />
4.<br />
5.<br />
6.<br />
7.<br />
8.<br />
9.<br />
10.<br />
11.<br />
12.<br />
13.<br />
14.<br />
BOB CAT<br />
JCB WITH BREAKER<br />
EXCAVATORS ( EXCAVATOR WITH BREAKER)<br />
SHOVELS<br />
ROLLERS<br />
HI-UP-H1-AB 5MT<br />
GRADERS<br />
TIPPER 20CBM<br />
TRAILERS<br />
WATER TANKERS<br />
CRANES<br />
BULL DOZERS<br />
OIL TANKERS<br />
LOADERS<br />
9
10<br />
Our Major fields of specialization includes<br />
Earthworks, Excavation & Cartaway: Noras Al Jazeera Has Several Prestigious Projects To<br />
Its Some Of The Major Projects Excuted And Completed Are As Follows:<br />
Dubai Metro project ( j.t.metro )<br />
Obayashi - Kajima - Yapi Markezi For Jt Metro Jv Project At The Redline Which Is Started<br />
From Jabel Ali Near By Bridge No.9 Till Burjuman Center And From Rashidiya Station To<br />
Deira Station And This Work Would Start & Continued With Jt Metro Jv Since From The<br />
Start Of May 2007 The Work Is Including Breaking The Building Obstacles Along The Line<br />
And Disposing The Rubbish Material And Making The Access Road, Backfilling and<br />
Compaction Area for Erection Precap Excavation at Different Areas ( interchange no.7<br />
Dubai Abudhabi Side, interchange no.6 Dubai Abudhabi Side, interchange no.3 Trade<br />
Center Rountabout, Tecom, Jabel Ali Interchange no.8, Jebel Ali Costing Yard Al Karama<br />
Sana Center, Terminal no.1 Dubai Airport, Lemeridian, Rashidiya Emirated Flying, Rashidiya<br />
Mosque and Rashidiya Bus Station ) .<br />
Breaking Pile the earth work area is about 900,000m 2 , Plus The Excavation of Entrance<br />
pod for 20 Stations both side of Shiekh Zayed Road the Quantity is About 60,000m 3 .<br />
work orders completed
11
12
13<br />
BAUER SPEZIAAL TIEFBAU Gmbh<br />
Lot Of Works Been Carried Out With M/s Bauer Speziaal Summerised In Excavation<br />
Disposad And Ground Preparation
14<br />
Simplex infrastructures limited<br />
SIMPLEX Co. Operation for Excavation of Pile for Jt Metro Jv and Breaking the Pile<br />
along the red line the total pile of excavation and breaking is about 600piles diameter<br />
2-2m. Following Below are mentioned activities done for Simplex Infrastructres Ltd.
15<br />
Yongnam engineering & Constructions pte ltd<br />
Working with Yongnam Engineering & Const. PTE. For Excavation and Breaking pile<br />
of the stations is about 11 stations & is starting from Jafza Stations, Jabel Ali, Dubai,<br />
Ibn Battuta, Al Barsha, Al Qouz. The Total Quantities of Excavation is about 100,000m 3<br />
Following Below Mentioned Activities are done for Yongnam Engineering & Cont. PTE LTD
16<br />
TAISEI Corporation<br />
Taisei Corporation for their Jabel Ali Downtown Project.<br />
Following activities are done for Taisei Corporation :<br />
Date<br />
8-Sep-07<br />
8-Sep-07<br />
8-Sep-07<br />
25-Sep-07<br />
2-Oct-07<br />
2-Oct-07<br />
2-Oct-07<br />
2-Oct-07<br />
8-Oct-07<br />
8-Oct-07<br />
26-Oct-07<br />
30-Oct-07<br />
31-Dec-07<br />
31-Dec-07<br />
2-Mar-08<br />
1-Apr-08<br />
12-May-08<br />
12-May-08<br />
21-May-08<br />
17-Jun-08<br />
15-Sep-08<br />
5-Oct-08<br />
9-Jan-09<br />
Work Order Number<br />
JABAL/TAISEI/278/07<br />
JABAL/TAISEI/282/07<br />
JABAL/TAISEI/285/07<br />
JABAL/TAISEI/288/07<br />
JABAL/TAISEI/292/07<br />
JABAL/TAISEI/294/07<br />
JABAL/TAISEI/296/07<br />
JABAL/TAISEI/298/07<br />
JABAL/TAISEI/301/07<br />
JABAL/TAISEI/304/07<br />
JABAL/TAISEI/308/07<br />
JABAL/TAISEI/310/07<br />
JABAL/TAISEI/312/07<br />
JABAL/TAISEI/314/07<br />
JABAL/TAISEI/318/08<br />
JABAL/TAISEI/325/08<br />
JABAL/TAISEI/333/08<br />
JABAL/TAISEI/339/08<br />
JABAL/TAISEI/342/08<br />
JABAL/TAISEI/362/08<br />
JABAL/TAISEI/371/08<br />
JABAL/TAISEI/421/09<br />
Description<br />
Hiring Of Shovel & Bobcat<br />
Disposal Of Rubbish Materials<br />
Supply of sabkha<br />
Excavation trimming Between Piles Platform Level<br />
Removal of Derbis<br />
Hiring Of Truch<br />
Hiring Of Bulldozer<br />
Hiring Of Shovel<br />
Hiring Of Bulldozer<br />
Hiring Of Shovel<br />
Disposal of Rubbish Material<br />
Hiring of Shovel<br />
Disposal Of Rubbish Materials<br />
Disposal Of Rubbish Materials<br />
Disposal Of Rubbish Materials<br />
Disposal Of Rubbish Materials<br />
Disposal Of Rubbish Materials<br />
Hiring of Shovel<br />
Disposal Of Rubbish Materials<br />
Supply of Sand<br />
Disposal Of Rubbish Materials<br />
Disposal Of Rubbish Materials<br />
Disposal Of Rubbish Materials
17
18
19<br />
Al Jaber L.e.g.t<br />
Engineering & Contracting (ALEC) l.l.c<br />
ALEC (AL JABER) Project - International Trade Centre in Dubai for Excavation Between<br />
Piles using the Jack Hammer Machine at Total Quantities of 90,000m 3 and break of<br />
6000Numbers.<br />
Following are below Mentioned activities are done for AL JABER L.E.G.T ENGINEERING &<br />
CONTRACTING (ALEC) L.L.C.<br />
Date<br />
5-May-08<br />
27-Jul-08<br />
4-Aug-08<br />
25-Aug-08<br />
25-Aug-08<br />
25-Aug-08<br />
3-Nov-08<br />
9-Nov-08<br />
30-Nov-08<br />
30-Dec-08<br />
Work Order Number<br />
Alec/001/2008<br />
Alec/001/2008<br />
Alec/001/2008<br />
Alec/001/2008<br />
Alec/001/2008<br />
Alec/001/2008<br />
Alec/001/2008<br />
Alec/001/2008<br />
Alec/001/2008<br />
Alec/001/2008<br />
Description<br />
Excavation and Disposing Soil and Break Pile Cup<br />
Break Pile Cap.<br />
Excavation and Disposing Soil<br />
Break Pile Cap.<br />
Excavation and Disposing Soil<br />
Break Pile Cap.<br />
Excavation and Disposing Soil<br />
Disposal of Ramp Soil<br />
Excavation and Disposing Soil<br />
Excavation and Disposing Soil
20<br />
Al Hamad<br />
Contracting Company<br />
Al Hamad Comapany At Al Nahda, Sharjah Residence Total Quantity of Excavation is<br />
20,0000 M 3 . Following Are The Mentioned Activities are Done for Hamad Contracting<br />
Company.<br />
Date<br />
27-Nov-07<br />
4-May-08<br />
Work Order Number<br />
AHJ-416-Shj<br />
AHJ-512-Shj<br />
Description<br />
Excavation Soil and Disposing Rubbish Materials<br />
Excavation Soil and Disposing Rubbish Materials<br />
Ascon road Contracting<br />
Date<br />
5-Feb-07<br />
12-Feb-07<br />
15-Feb-07<br />
5-Feb-07<br />
28-Feb-07<br />
7-Mar-07<br />
2-Apr-07<br />
16-May-08<br />
7-Jun-07<br />
Work Order Number<br />
ARC/1200.07<br />
ARC/0620.07<br />
ARC/0521.07<br />
ARC/0662.07<br />
ARC/0784.07<br />
ARC/0891.07<br />
ARC/0921.07<br />
ARC/100.07<br />
ARC/0107.07<br />
Description<br />
Sabka Material.<br />
Sabka Material.<br />
Sabka Material.<br />
Sabka Material.<br />
Sabka Material.<br />
Sabka Material.<br />
Sabka Material.<br />
Sabka Material.<br />
Sabka Material.<br />
Afcons constructions mideast llc<br />
For Earth works and Road Works for Nad Al - Sheba Race Course Development Project<br />
Stage - A with the AFCONS CONSTRUCTIONS MIDEAST LLC Comapany at a Total<br />
Quantity of 200,000 M 3 Back Filling, 300,000 m Road Base.<br />
The Following are the Activities Done For AFCONS :-<br />
Date<br />
Work Order Number<br />
Description<br />
31-Dec-08 5634/WO/EW/10 Earth Works
21<br />
Filling and settlement works of infrastructure in<br />
Al halifat area for armed forces.<br />
Date<br />
27-May-15<br />
20-Jan-16<br />
28-Aug-16<br />
Work Order Number<br />
CMW-15106-S001<br />
CMW-15106-S002<br />
CMW-15106-S003<br />
Description<br />
Cut & Fill Quantities of 755,000 M 3<br />
Cut & Fill Quantities of 755,000 M 3<br />
Cut & Fill Quantities of 755,000 M 3
22