December 2018
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Editor’s Comment<br />
MATT DOWNS<br />
EDITORIAL DIRECTOR<br />
MATTDOWNS@MEDIA-NOW.CO.UK<br />
07963 330774<br />
COVER PIC:<br />
COURTESY OF<br />
ECO GREEN ROOFS<br />
Brexit; recruitment issues and attracting the next generation;<br />
material price hikes; supply issues; poor payment practices – if<br />
you look back over <strong>2018</strong> and forward to 2019, unfortunately a lot<br />
of the issues that have been impacting our sectors and the wider<br />
construction industry in recent years will continue to do so.<br />
One key influencer, however, for the whole of the construction sector<br />
going forward will be the Hackitt Review. Addressing a number of wideranging<br />
issues, one key theme in the Hackitt Review is competency of<br />
the workforce. This point was made by a number of the contributors to<br />
our issues and trends feature on p.16. Sarah Spink, CEO of LRWA, told<br />
us: “Competence will be another key theme for next year as a result of<br />
the Hackitt report, which will put a spotlight on areas including roofing<br />
design, testing, materials, installation and maintenance”. James<br />
Talman, Chief Executive of the NFRC, also explained the role he feels<br />
RoofCERT will play in delivering competency: “Accreditation will provide<br />
existing operatives with a means to gain essential skills, increase their<br />
technical knowledge and prove their competence to clients.” Stuart Bell<br />
of Polyfoam XPS, however, explained how he believes the Hackitt<br />
Review can change the trend for specified materials such as insulation<br />
being switched during construction and after project-design stage<br />
compliance has been achieved. Stuart told us: “We hope that following<br />
the Hackitt Review, we will begin to see this trend shift in 2019.” So<br />
read on for all this and so much more – and don’t forget to tweet us<br />
@TotContractorUK with what you feel will impact your market in 2019.<br />
A look back at Contractor’s Day: p.06 and 26-27<br />
NEW<br />
A PRIC<br />
C£C£OMP£GET £AY£DA£O£T£D£ARISO £PA ON<br />
£T<br />
Matt<br />
LOW PRICE<br />
An image from ECO Green Roofs’ work on a project in Hampstead. Read<br />
Keith Hills’ article on green roof considerations for city centre projects on p.38.<br />
FOLLOW US @TOTCONTRACTORUK<br />
SIGN UP FOR YOUR WEEKLY E-BLAST AT<br />
WWW.TOTAL-CONTRACTOR.CO.UK<br />
Advertising:<br />
Publishing Director: Andy Dunn<br />
DD: 01892 732 047<br />
Mob: 07963 330777<br />
Email: andydunn@media-now.co.uk<br />
Registered office: 1 Forstal Road, Aylesford, Kent, ME20 7AU<br />
Commercial Manager: Jake Roxborough<br />
DD: 01892 732 047<br />
Mob: 07956 133314<br />
Email: jakeroxborough@media-now.co.uk<br />
The content of Total Contractor magazine (and website) does not necessarily reflect the views of the editor or publishers and<br />
are the views of its contributors and advertisers. The digital edition may include hyperlinks to third-party content, advertising,<br />
or websites, provided for the sake of convenience and interest. The publishers accept no legal responsibility for loss arising<br />
from information in this publication and do not endorse any advertising or products available from external sources. No part<br />
of this publication may be reproduced or stored in a retrieval system without the written consent of the publishers. All rights<br />
reserved.<br />
NOW<br />
FROM ONL LY<br />
£3 Y<br />
45<br />
*<br />
per leaf<br />
Including<br />
deliv<br />
very<br />
Supported by:<br />
ORDER 10<br />
TO DELIVERY FROM A FAS<br />
T<br />
T D W<br />
im<br />
a<br />
o<br />
me<br />
yrking s Lead<br />
*<br />
Be choose Made for Trade<br />
G CE Email: bif<br />
Call: 01642 610799<br />
Aluminium Bi-F old Doors olds@madefortrade.co<br />
Fax: 01642 671026<br />
www.madefortrade.co<br />
* Per leaf price is unglazed and may vary depending on size and spec cification of the door. Lead time is based on a standard colour.<br />
DECEMBER <strong>2018</strong> TC 3