Stacker & Reclaimer

Ramco Cements – Reaching New Heights

The Ramco Cements Limited is set to surpass

20 MTPA cement capacity in 2020

The Ramco Cements Limited (‘the Company’) which

currently has a cement capacity of 16.69 MTPA is in

the process of adding new cement capacity of 6.15

MTPA which will increase its aggregate cement capacity

to 22.84 MTPA by the year 2020. Further its brand

Ramco enjoys the status of being the largest brand in

the Southern Region besides being increasingly popular

in the eastern markets. The company has railway siding

facilities in all its plants, captive thermal power capacity

of 175 MW and wind power capacity of 165.79 MW.

Cement plants

At present, the company has ten cement plants in

operation, comprising five integrated cement plants and

five grinding units, with an aggregate clinker capacity

of 10.11 MTPA and cement capacity of 16.69 MTPA.

Its cement plants are located mainly in four States,

namely: Andhra Pradesh, Karnataka, Tamil Nadu and

West Bengal.

In addition, the company’s four integrated cement

plants are well equipped with railway siding facilities

and coal based captive thermal power plants with an

aggregate capacity of 175 MW. It also has 165.79 MW

wind power capacity including its wind farm owned by

its subsidiary company, Ramco Windfarms Limited.

Captive power plants

To ensure uninterrupted power supply at an economical

price, the Company has installed captive power plants

(CPPs) at its four integrated cement plants which have

a total power generation capacity of 175 MW.

The company installed its first CPP at Alathiyur Cement

Plant with a capacity of 36 MW (2x18 MW) in 2005. Later

in 2017, a new capacity of 6 MW was added increasing

the total CPP capacity of Alathiyur Plant to 42 MW.

In the year of 2007-08, the company had installed

its second CPP with a capacity of 36 MW at its

Jayanthipuram Cement Plant. Further, in December

20017, a new capacity of 6 MW was added which has

increased its CPP capacity to 42 MW.

At Ariyalur Cement Plant, the company had set up two

CPPs with a combined capacity of 60 MW. The first CPP

with a capacity of 40 MW was commissioned in 2010-

11 while the second in 2012-13 with 20 MW. Further in

2015-16, a new 6 MW capacity was added, and with this,

Ariyalur’s total CPP capacity has increased to 66 MW.

In 2012-13, the company had set up a 25 MW CPP at

Ramasamy Raja Nagar Cement Plant.

Grinding units

To economise the transportation costs and to service

the markets better, the Company opted for grinding

units near fly ash availability areas or closer to major

cement consumption areas. The company has set up five

grinding units with an aggregate capacity of 4.20 MTPA.

Of the five grinding units, two are located in

Tamilnadu, one near Chengalpet in Uthiramerur taluk

in Kancheepuram district and other at Singipuram

village, Valapadi taluk, Salem district. Both these units

32 January 2020 ACE UPDATE