SMOT Strategy Document
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
capacity increasing by 60); The Willows Primary School (admission number increasing from<br />
45 to 60, capacity increasing by 105).<br />
In Haverhill: Clements Primary Academy (admission number increasing from 45 to 60,<br />
capacity increasing by 105); Coupals Primary Academy (admission number increasing from<br />
30 to 60, capacity increasing by 210).<br />
In Brandon: Forest Academy (admission number increasing from 45 to 60, capacity<br />
increasing by 105).<br />
Great Waldingfield CEVC Primary School (admission number increasing from 20 to 30,<br />
capacity increasing by 70).<br />
Beck Row Primary School (admission number increasing from 30 to 60, capacity increasing<br />
by 210).<br />
The following additional capacity was made available for children and young people<br />
with special educational needs and/or disabilities for the 2018-2018 and 2018-2019<br />
school years:<br />
In September 2017, The Everitt Academy opened providing 50 new special education places.<br />
In September 2018, 26 additional places were created at four special schools – 8 at<br />
Hillside Special School, 11 at Priory School, 3 at Riverwalk School and 4 at Thomas Wolsey<br />
School. There will also be 13 additional places at Specialist Support Centres – 6 at Causton<br />
Junior School and 7 at Gorseland Primary School.<br />
Also in September 2018, an additional 60 places were created in Alternative Provision across<br />
the county. 20 in schools operated by The Raedwald Trust in Ipswich, 18 in Lowestoft at The<br />
Attic and The Landing, 3 at Hampden House in Sudbury and 15 across the sites operated by<br />
Olive AP Academy. From January 2019 Olive Academy added a further 4 places.<br />
In September 2019 a new Sixth Form college (Abbeygate) opened in Bury St Edmunds in the<br />
West Suffolk College and moved into new buildings in September 2020 when the 6 th form at<br />
King Edward VI Upper School closes.<br />
The following provision opened in September 2020<br />
Type of Project<br />
Places<br />
KS2 C&I Unit Houldsworth Valley 18<br />
KS3/4 C&I UNIT Newmarket Academy 18<br />
KS1 Unit Burton End 12<br />
KS2 C&L UNIT Clements 18<br />
KS3/4 C&L UNIT Castle Manor 18<br />
24