10.03.2020 Views

SMOT Strategy Document

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

capacity increasing by 60); The Willows Primary School (admission number increasing from<br />

45 to 60, capacity increasing by 105).<br />

In Haverhill: Clements Primary Academy (admission number increasing from 45 to 60,<br />

capacity increasing by 105); Coupals Primary Academy (admission number increasing from<br />

30 to 60, capacity increasing by 210).<br />

In Brandon: Forest Academy (admission number increasing from 45 to 60, capacity<br />

increasing by 105).<br />

Great Waldingfield CEVC Primary School (admission number increasing from 20 to 30,<br />

capacity increasing by 70).<br />

Beck Row Primary School (admission number increasing from 30 to 60, capacity increasing<br />

by 210).<br />

The following additional capacity was made available for children and young people<br />

with special educational needs and/or disabilities for the 2018-2018 and 2018-2019<br />

school years:<br />

In September 2017, The Everitt Academy opened providing 50 new special education places.<br />

In September 2018, 26 additional places were created at four special schools – 8 at<br />

Hillside Special School, 11 at Priory School, 3 at Riverwalk School and 4 at Thomas Wolsey<br />

School. There will also be 13 additional places at Specialist Support Centres – 6 at Causton<br />

Junior School and 7 at Gorseland Primary School.<br />

Also in September 2018, an additional 60 places were created in Alternative Provision across<br />

the county. 20 in schools operated by The Raedwald Trust in Ipswich, 18 in Lowestoft at The<br />

Attic and The Landing, 3 at Hampden House in Sudbury and 15 across the sites operated by<br />

Olive AP Academy. From January 2019 Olive Academy added a further 4 places.<br />

In September 2019 a new Sixth Form college (Abbeygate) opened in Bury St Edmunds in the<br />

West Suffolk College and moved into new buildings in September 2020 when the 6 th form at<br />

King Edward VI Upper School closes.<br />

The following provision opened in September 2020<br />

Type of Project<br />

Places<br />

KS2 C&I Unit Houldsworth Valley 18<br />

KS3/4 C&I UNIT Newmarket Academy 18<br />

KS1 Unit Burton End 12<br />

KS2 C&L UNIT Clements 18<br />

KS3/4 C&L UNIT Castle Manor 18<br />

24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!