Ajinkya Dhabarde| Undergraduate Architecture Portfolio |VNIT
Selected Works, Undergraduate Architectural Portfolio, 2016-2020 Visvesvaraya National Institute of Technology (VNIT Nagpur)
Selected Works, Undergraduate Architectural Portfolio, 2016-2020 Visvesvaraya National Institute of Technology (VNIT Nagpur)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
AJINKYA DHABARDE
Undergraduate selected works
2020
1
CONTENTS
1.
2.
3.
4.
5.
7.
8.
3-4
5-8
9-16
17-20
21-24
25-28
29-30
2
AJINKYA
DHABARDE
email id : dhabardeajinkya@rediffmail.com
phone : +91-7721096398 , 7757074881
city
: Hinganghat, Dist- Wardha (MH)
Hello, my name is Ajinkya Dhabarde and I am currently fourth year Architecture student at
Visvesvaraya National Institute of Technology, Nagpur. The following is a curated collection
of my architectural design and personal work that reflects my passion to create content.
I am a keen learner, adaptable and wishing to make a positive
contribution to the Architectural practice with innovative ideas.
I am always excited to learn new things and try to do it with
dedication and hardwork. Capable in both, working as a team
and individually completing tasks efficiently and to the best of
my ability. I am hoping to gather as much experience as I can
from my internship program and I will try to give my best to it.
BACHELOR IN ARCHITECTURE
Visvesvaraya National Institute of Technology
Nagpur
2016-2021
12th BOARD
Bharat Jr. College, Hinganghat, Dist- Wardha (MH)
Freelance Graphic Desiner
Conducted workshop - Digital Art 2018
Visvesvaraya National Institute of Technology
Nagpur
Internship in Promotion Graphics
2015
10th BOARD
Bharat Vidhyalay, Hinganghat, Dist- Wardha (MH)
2013
Madhuban Village Farm House and Adventure
park, Nagpur
Born in Maharashtra, India.
Marathi is my mother tongue
Auto Cad
Archicad
Twinmotion
Sketchup
MARATHI
ENGLISH
HINDI
Photoshop
Illustrator
MS Office
Digital Pinting
Motion Graphics
3D Modeling
3
4
Addition and Substracting in rectangular
box gives various forms of spaces which
help to explore function according to the
form.
invara - LEISURE HOME
5
FORM DEVELOPMENT
Exploding the shape of box to create division in spaces that are
semi-open and closed in nature
PUZZLE
SEMI-OPEN
The purpose of design is to create a
space for oneself where person can
realise the self through the space
that immitates one. The design has
spaces developed that encourages
the user into performing activities
of one’s interests.
CLOSED
6
A’
B’
2.
3.
4.
1. ENTRANCE FOYER
2. LIVING AREA
3. KITCHENETTE
4. OPEN GARDEN SPACE
5. STUDY AREA
6. BEDROOM
7. STAIRCASE
8. WASHROOM
5.
1.
8.
6.
7.
A
B
7
3.5 M
SECTION B-B’
3.5 M
SECTION A-A’
8
GOREWADA BAMBOO
RESEARCH AND DEVELOPMENT CENTRE
NAGPUR
9
This design is Study of countour treatment and campus planning aspects .
It shows colaboration and relationship between culture and spaces.
Developing the site in account with vernacular construction material and
construction techniques is the main aim of this design task.
10
8.
1.
9.
7.
7.
ENTRY
2.
3.
4.
5.
6.
Site is surrounded with green land and Gorewada forest reserve.
Gorewada lake is about 1km distant from the site. Two main road croses
the site - Katol Road and Katol bypass Road. Site shows countours of
interval of 0.5 - 1 m. The site is reserved for the Research and
Development of Bamboo and other vernacular construction materials
and techniques.
GOREWADA FOREST
RESERVE
GOREWADA
LAKE
1. ADMINISTRATION
2. MULTIPURPOSE HALL
3. EXHIBITION HALL
4. CONFERENCE HALL
5. BAMBOO WORKSHOP
6. MUD WORKSHOP
7. STAFF QUARTERS
8. DORMITORY BLOCK
9. CANTEEN/MESS
KATOL ROAD
GOREWADA BAMBOO
DEVELOPMENT CORP.
KATOL SQ.
CONSTRUCTION MATERIALS-
BAMBOO
MUD
CONCRETE
COMPOSITE
SITE-
GOREWADA BAMBOO
DEVELOPMENT CORP.
NAGPUR.
SITE AREA- 9450 SQ.M.
11
1.
2.
5.
3.
4.
6.
A A’
7.
8.
ADMINISTRATION-
Area - 470 sq.m.
Administration area contains space
as Directors cabin, Dean Cabin,
conferance room, meeting room,
Rest room, staff room, waiting lobby,
and toilet blocks + connecting
spaces.
Administartion deals with the
regular mettings and administrative
works of the campus and also
provides the information.
1. DIRECTOR’S CABIN
2. DEAN’S CABIN
3. WAITING LOBBY
4. CONFERANCE ROOM
5. MEETING ROOM
6. REST ROOM
7. STAFF ROOM
8. SEMI- COURTYARD
3M
SECTION A-A’
12
MUD WORKSHOP
1.
C
BAMBOO WORKSHOP
1.
2.
3.
C’
WORKSHOPS-
Area - 145 sq.m. each workshop
There are two types of workshops
1. Bamboo Workshop
2. Mud Workshop
Workshops deals with study,
reasearch and Development of
construction materials and
techniques.
B B’
2. 2.
3.
1. ENTRANCE LOBBY AND
RECEPTION
2. WORKSHOP
3. STORAGE AND EXHIBITION
3.5 M
SECTION B-B’
SECTION C-C’
13
3.
2.
MULTIPURPOSE HALL AND
EXHIBITION-
Area - 870 sq.m.
This block deals with various
activities like folk
performances and exbition of
artworks.
This blosck shocase the
gathering among the campus
and output from the
workshops.
D 1.
D’
1. MULTIPURPOSE HALL
2. EXHIBITION SPACE
3. WAITING LOBBY
4 M
SECTION D-D’
14
3.
2.
1.
E E’
4.
CONFERENCE HALL-
Area - 375 sq.m.
This block deals with various activitiesregarding
national and international conferences of Bamboo
reasearch and developmnt.
This block also allows webinars and seminars.
The toal capacity of the conference hall is 300- 500
persons. It also includes performance stage for
cultural programs and events.
1. CONFERENCE HALL
2. STAGE
3. GREEN ROOM
4 WAITING LOBBY
4 M
SECTION E-E’
15
G’
2.
1. STAFF QUARTERS
2. DORMITORY
3. FRONT YARD
G
F 1. F’
3.
ACCOMODATION AREA-
Area - 2 sq.m. per person + w/c
Accomodation area includes-
1. Staff quarters (8 blocks with 2 person)
2. Dormitory block (2 blocks with 17 person)
The accomodation is provided for permanent staff as staff
quarters and for temporary participants or visitors as
dormitory.
SECTION F-F’
SECTION G-G’
16
VISUAL ANIMATION CENTRE
17
ARCHITECT - REM KOOLHAS
PATH VOLUME ZONING
FORM DEVELOPMENT
18
+25.1M
+21.6M
+18.1M
+11.1M
+7.6M
+3.5M
+O.6M
WEST SIDE ELEVATION
LONGITUDINAL SECTION
19
+25.1M
+21.6M
+18.1M
+11.1M
+7.6M
+3.5M
+O.6M
FRONT ELEVATION
LATERAL SECTION
20
Deshpande Design Trophy
The task was to illustrate the future issue
and its interventions.
The design is a comaparison between the
tiniest object and the largest object with
respect to the universe infinite size.
THIRD LANDSCAPE CEMETERY
21
22
PLAN
23
24
WORKING DRAWING
RESIDENTIAL BLOCK
AREA- 2030 SQ.M.
25
1615 3385 3385 1615
A
B
C
A B C
18000
1615
5000
8385
18000
10000
3115
10000
1615 3385
3385 1615
1500
7000
1500
6
5
4
3
2
1
14885
11200
9655
8755
5345
3115
18000
3115 2230 3410 900 1545 3685 3115
C1 F1 C2 F1 C1 F1
C2 F2 C4 F4 C2 F2
C2 F2
C2 F2
C4 F4
C2 F2 C4 F4 C2 F2
C1 F1 C2 F2 C1 F1
1615 3385 3385 1615
10000
2230
3410
900
1545
3685
18000
3115
14885
11200
9655
8755
5345
3115
6
5
4
3
2
1
6
5
4
3
2
1
18000
3115
2230
3365 1015
1430
3730
3115
3000
9540
230
2000
230
3000
13 14 15
10 11 12
7 8
4 5 6
1500 7000
1500
1615 3385
3385 1615
UP
9
3000 12000
3000
3365 1015
1430
3730
3115
2230
3115
18000
6
5
4
3
2
1
10000
0000
1615
5000
8385
10000
A
B
C
A B C
FOUNDATION PLAN
WATER TANK LVL.
+13780
150
150 MM FREE BOARD
WATER
1040
13780
600 3060 2100 960 2100 960 900 3100
BALCONY
BALCONY
120
900 3100
BEDROOM
120
2940
BEDROOM
120
120
2940
2940
PARKING
480
BATHROOM
500
BATHROOM
500
KITCHEN
500MM FLOOR DROP
KITCHEN
1000MM WIDE
MIDLANDING
BALCONY
BALCONY
PARAPET LVL.
+10680
TERRACE LVL.
+9780
LINTEL LVL
+8820
2ND FLOOR LVL.
+6120
LINTEL LVL
+5760
1ST FLOOR LVL.
+3060
PLINTH LVL.
+600
GROUND LVL.
0000
FOUNDATION DEPTH AS PER SOIL CONDITION
LONGITUDINAL SECTION A-A’
26
A B C
B
A
6
5
4
3
2
1
18000
14885
11200
9655
8755
5345
18000
1615 3385
3385 1615
1500
3365 1015
1430
3730
3115
230
3615
3250
115 1200 115 900 115
3000
2230
3115
230
2000
230
3000
230 230 230
3155 3155
1000
13 W1
14 W1 C1 15
D2
D2
W1
BED
3155 X 3615
KITCHEN
3155 X 3250
BED
3155 X 3615
10W.C.
C4 11 12
1200 X 900
V
TOILET
D3
2200 X 1200 V
V
1000
W1
BATH
2100 X 1200
BALCONY
D3
D2
10000
HALL
3155 X 4265
B B’
A
3115
C1
C2
C2
C2
1615
C4
7 8
5000
C2
4 C4 5 6
C1 1 C2 2 C1 3
230 230 230
3155 3155
1500 1500
1615 3385
3385 1615
UP
D2
D1
D3
BALCONY
W1
W1
C2
C2
W1
C2
8385
9
3000 230
2000
230
4265
115 1200 115
3615
230
3000
1500
230
3365 1015
1430
3730
3115
2230
3115
18000
18000
14885
11200
9655
8755
5345
3115
6
5
4
3
2
A
1
A
2100
D750
D750
300
710
120
348
265
750
300
1965
2100
1315
2100
2100
399
125MM Ø NAHNI TRAP
20MM Ø HOT WATER
PVC PIPE
294
C2 12
333
448
C2 9
1200 900
450
75MM
W.W.P
GT
115 450 115
450MM PROJECTED RCC CHAJJA
EXHAUST FAN
300X300 FULL WALL
CERAMIC TILES DADO
GEYSER
25MM Ø PVC PIPE FROM OHT
20MM Ø HOT WATER PVC PIPE
230MM BRICK WALL
300X300 GLAZED
CERAMIC TILES FLOORING
120MM RCC SLAB
38MM Ø GI PIPE LAID UNDER THE FLOOR
150MM Ø MAIN
SEWER LINE
450X450
INSPECTION CHAMBER
150X150 GULLY TRAP
100MM S.W.P.
5
A
25MM Ø PVC PIPE FROM OHT
4
0000
1615
B
A’
5000
10000
8385
10000
C
300X300 FULL WALL
CERAMIC TILES DADO
300X300 GLAZED
CERAMIC TILES
FLOORING
A B C
FIRST AND SECOND FLOOR
PLAN
W/C DETAILS
110
300
150
150 MM FREE BOARD
WATER TANK LVL.
+13780
3000
3820 1190
WATER
1040
1000 1400 1600
PARAPET LVL.
+10780
120
TERRACE LVL.
+9780
110
VERANDAH
900 1200 840
LINTEL LVL
+8820
13780
2950 13780
120
2ND FLOOR LVL.
+6120
110
VERANDAH
900 1200 840
LINTEL LVL
+5760
2950
120
1ST FLOOR LVL.
+3060
PARKING
110
480 120 1420
480 120 2940
PLINTH LVL.
+600
GROUND LVL.
0000
FOUNDATION DEPTH AS PER SOIL CONDITION
FRONT ELEVATION
LATERAL SECTION B-B’
27
150 MM RCC LINTEL
150
22
21
FFL
20
19
1ST FLOOR LVL
LVL 3060
18
7000
TREAD 250
RISER 175
1000MM WIDE MIDLANDING
230 MM BRICK WALL
110 MM RCC WAIST SLAB
600 1530 2100
120
16
15
14
13
12
11
10
9
8
7
6
A
17
B
5
4
3
2
1
120 MM RCC SLAB
RAILING
MIDLANDING LVL
FFL
PLINTH LVL
LVL +600
LVL +600
G.L.
LVL 0000
12000
18000
1000
250
C4
5
C2
4
A
UP
A
2000
9 8 7 6 5 4 3 2 1
10 11 12 13 14 15 16 17 18
TREAD 250
RISER 175
C1 1 C2 2
R.C.C Waist Slab
3500
19mm Thk. Polished
Grey Granite
20mm Thk.
Cement Mortar
8mm Thk.
Black Granite Tile
10X10mm Groove
8mm Thk. Ocean Mist
Tile as Recommended
19mm Thk. Polished
Grey Granite
20mm Thk. Cement Mortar
6mm Thk. SS Baluster Welded
to 6mm Thk. SS Plate
10mm Dia. MS Bolts,
Bolted to MS Plates
Cement Grout
100X100X6mm Thk. MS Plate
Prewelded With Holdfast and Placed
in Position Prior to Grouting
10000
R.C.C
Detail A
Baluster Fixing Detail
SITE DEVELOPMENT PLAN
STAIRCASE DETAILS
EAST SIDE ELEVATION
28
cenematic
renders
29
digital
artwork
30
AJINKYA DHABARDE
email id : dhabardeajinkya@rediffmail.com
phone : +91-7721096398 , 7757074881