21.12.2012 Views

WACIPAC Project Design Matrix - Noguchi

WACIPAC Project Design Matrix - Noguchi

WACIPAC Project Design Matrix - Noguchi

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Output 5:<br />

The advocacy of school-based<br />

parasitic diseases control is<br />

promoted within the subregion<br />

and among three<br />

CIPACs.<br />

Output 6:<br />

Start-up activities on schoolbased<br />

parasitic diseases<br />

control are implemented in the<br />

Supporting sites.<br />

1-1. The number of seminars/workshops for<br />

policymakers organized by <strong>WACIPAC</strong> and<br />

the cumulative number of the participants.<br />

1-2. The number of donor coordination<br />

workshops advocated and promoted by<br />

<strong>WACIPAC</strong> and the cumulative number of<br />

participants.<br />

2. The number of country visits and reports.<br />

3. Exchange of data, documents, experience is<br />

promoted.<br />

4. Newsletters are periodically issued by<br />

<strong>WACIPAC</strong>.<br />

5. The number of visits to the <strong>WACIPAC</strong> home<br />

page is increased.<br />

1. The fund for start-up activities in Supporting<br />

sites is secured.<br />

2. Level of technique and skill of management,<br />

health policy, operational research, etc, are<br />

heightened in the sub region.<br />

3. School children and communities in the subregion<br />

acquire their experiences of parasite<br />

control and take preventive actions.<br />

Activities Inputs<br />

(Output 1)<br />

1.1. <strong>WACIPAC</strong> is officially established.<br />

1.2. Strengthen the management structure of <strong>WACIPAC</strong>.<br />

1.2.1. Establish the proper management structure of <strong>WACIPAC</strong> at Ghana<br />

level. (The joint coordinating committee and management<br />

committee of <strong>WACIPAC</strong>)<br />

1.2.2. Establish the proper management structure of <strong>WACIPAC</strong> at<br />

International level.<br />

1.3. Develop human resources for <strong>WACIPAC</strong>.<br />

1. <strong>Project</strong> reports<br />

2. <strong>Project</strong> records<br />

3. <strong>Project</strong> reports<br />

4. Newsletters<br />

5. The number of visits to <strong>WACIPAC</strong><br />

home page<br />

1. <strong>WACIPAC</strong> financial report<br />

2. The report of start up activities<br />

3. The report of start up activities<br />

(A)Inputs from the Ghanaian Side<br />

(<strong>Project</strong> personnel including counterpart personnel)<br />

1. <strong>Project</strong> Director: Director of <strong>Noguchi</strong> Memorial Institute for Medical<br />

Research (NMIMR)<br />

2. <strong>Project</strong> manager: Head of Parasitology Unit, NMIMR<br />

3. Officers, Personnel at Ministry of Health and Ministry of Education,<br />

Youth and Sports<br />

4. Experts: Parasitology, Information, Education and Communication<br />

(IEC), Laboratory Technicians<br />

5<br />

The fund for start-up activities in Supporting<br />

sites is secured from some funding resources<br />

other than JICA

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!