Managing Cost, Schedule and
Scope With Unifier
“Knowing your cost, schedule and scope will
lead to proper analysis that will influence the
time and cost outcome of the project”.
Prepared by:
Vlad Tamondong, Capital Power Corporation
vtamondong@capitalpower.com
Session ID:
10429
About Vlad
• Bachelors of Science in Civil Engineering, Philippines
• Work experience locations
• Philippines (1 yr)
• Saudi Arabia (7 yrs)
• Canada
• 25 years of project controls experiences
• Experiences :
• Field Engineer
• Planning and Scheduling
• Cost Control
• Risk Management
• Estimating
• Unifier Experience
• 3 years
April 2-6, 2017 in Las Vegas, NV USA
#C17LV
Our Company : Capital Power
• Main Office is based in
Edmonton, AB
• Capital Power owns more than
3,200 megawatts of power
generation capacity at 18
facilities across North America.
• More than 700 megawatts of
owned generation capacity is in
advanced development in
Alberta and Kansas.
April 2-6, 2017 in Las Vegas, NV USA
#C17LV
Wind Turbine Generator
Collector
lines
• Over 520 yd3 concrete
• 4 tower sections
• ~168 anchor bolts
• 200-360 ft high
• 145 ft blade length
• 30%-50% capacity factor
• 5-15 mile transmission lines
• 10-15 mile collector lines
• Operation & Maintenance
(O&M) bldg.
WTG
Foundation
April 2-6, 2017 in Las Vegas, NV USA
#C17LV
4
Unifier – The Project Controls Tool
1. Project Scope
2. Cost Estimation
3. Planning and Scheduling
4. Earned Value Management
5. Document Management
6. Risk Management
7. Cost Management + Change
Management
• Earned Value
• Productivity
• Forecast
Puzzle on the works
Cost Actuals
Breakdown
Structure
(CBS)
Forecasts
Contractors
Schedule
Accruals
Owner
Users
Purchase
Order
Vendor
Information
Document
Tracking
NCR
DCN
/RFI
Change
Orders
Estimate
- gather, analyze, report
Unifier
Risks
April 2-6, 2017 in Las Vegas, NV USA
#C17LV
6
CBS Alignment
EBS Task Structure
(Financial Tool)
Unifier CBS Structure
(Project Controls Tool)
Hard Dollar CBS Structure
(Estimating Tool)
April 2-6, 2017 in Las Vegas, NV USA
#C17LV
7
1.0 Project Scope
• Request for Information (RFI)
• Owner Request for Information
• Design Change Notice (DCN)
• Non Conformance Report (NCR)
• Contract Pay Items
• Costs
• Quantity
• Hours
• Risk Events (probability)
• Purchase Order details
• Actual Transactions (for PO’s and Non PO’s)
• Change Management
• Reports
Simple BP
Pay App
Cost BP Generic
Change Commit
Custom Report
April 2-6, 2017 in Las Vegas, NV USA
#C17LV
8
2.0 Cost Estimation (Benchmarking)
Install rate calculation
Example :
Install a Wind Turbine Generator (WTG) concrete foundation.
Mhr Qty UOM CBS Commodity Key
Code Code Qty
Excavation: 377 1,887 yd3 2.30.1 300101 N
Formwork : 16 161 ft2 2.30.1 300320 N
Rebar : 251 29 tons 2.30.1 300321 N
Concrete : 574 459 yd3 2.30.1 300322 Y
Backfill : 265 1,326 yd3 2.30.1 300401 N
Install rate = 574 mhr / 459 yd3 = 1.25 mhr/yd3
Cost
Type
L
M
S
M
O
Notes:
1) Key Qty, used to generate quantity curve and
2) Calculate productivity on concrete crew(ie commodity code = 300???)
3) Cost Type, used to generate report by Cost type
4) Actual Cost by CBS Code; Incurred Cost by Commodity code
April 2-6, 2017 in Las Vegas, NV USA #C17LV 9
April 2-6, 2017 in Las Vegas, NV USA #C17LV 10
Cost and Change Commit BP must have:
Cost Type (L,M,S,O)
April 2-6, 2017 in Las Vegas, NV USA
#C17LV
11
Benchmarking
Cost and Change Commit BP must have:
- Key Quantity - Commodity Code
April 2-6, 2017 in Las Vegas, NV USA
#C17LV
12
3.0 Planning and Scheduling
Schedule Sheet interfaced with Primavera P6
April 2-6, 2017 in Las Vegas, NV USA
#C17LV
13
Costflow and Contingency Rundown
Advantages in configuring the Schedule Sheet:
1. Create Incurred Costflow in Cost Manager Cashflow to show,
• Baseline, Forecast and Actual Costs
2. Able to generate quantity (commodity based) curve,
3. Generate Contingency Rundown curve based using Cashflow by
WBS. Filter the specific contingency CBS code and use it’s early
start and early finish dates from schedule sheet. Generate a
curve formatted as reverse S-Curve
April 2-6, 2017 in Las Vegas, NV USA
#C17LV
14
Cost Flow Curve
April 2-6, 2017 in Las Vegas, NV USA #C17LV 15
April 2-6, 2017 in Las Vegas, NV USA #C17LV 16
4.0 Earned Value Management
• Cost Manager, Cashflow by WBS was configured to show earned
progress “S” curve showing Planned, Forecast and Actual % complete
To generate a weighted earned value progress
‣ create a BP for the CBS weightings
‣ create a Cashflow by WBS identifying the Plan, Actual and Forecast
‣ create a report to multiply them both using sql query.
April 2-6, 2017 in Las Vegas, NV USA
#C17LV
17
Earned Value weightings using cost sheet
April 2-6, 2017 in Las Vegas, NV USA
#C17LV
18
April 2-6, 2017 in Las Vegas, NV USA #C17LV 19
5.0 Document Management
April 2-6, 2017 in Las Vegas, NV USA
#C17LV
20
6.0 Risk Management
• Monte Carlo Simulation
• Tmin
• Tmax
• Impact & Probability values
• Very Low, Low
• Medium
• Very High, High
April 2-6, 2017 in Las Vegas, NV USA
#C17LV
21
7.0 Cost Management
April 2-6, 2017 in Las Vegas, NV USA
#C17LV
22
Cost Sheet Configuration
April 2-6, 2017 in Las Vegas, NV USA
#C17LV
23
Business Processes
1. Current Budget (Target) ; Cost type Base Commit
2. Actual / Paid ; Cost type Generic
3. Commitment ; Cost type Generic
4. Incurred/Earned ; Cost type Pay App
5. Change Management ; Cost type Change Commit
• Actuals – (Financial tool software Interface)
• Expenditure Types
• Labor
• Material
• Full Cost / Subcontract
• Other
• Project/GL Period
• Financial period manual switch
• Synchronizes Unifier and Financial tool actuals
April 2-6, 2017 in Las Vegas, NV USA
#C17LV
24
Business Processes
• Purchase Order
• Non Purchase Orders (NPO)
• OTL – On Time Labor (internal costs/time charges)
• Expenses – Reimbursements (Corporate/Personal Credit Cards)
• SignOff - Sign-Off invoices
• IDC - Interest During Construction
• Accruals
• ERV - Exchange Rate Variance
• Commitment – (Financial software Interface)
• Purchase Order
• Non Purchase Order (Time Charges, Sign off, expenses)
• Commit as Paid (CAP)
• Forecast = ETC + Incurred + Risk Event + Probability Factored
• ETC = Estimate to complete
• Incurred costs = costs included for contracted work done
or materials/ equipment delivered to date.
April 2-6, 2017 in Las Vegas, NV USA
#C17LV
25
Binary solution approach
April 2-6, 2017 in Las Vegas, NV USA #C17LV 26
• Incurred - (through Unifier based on Owner/Contractors input)
• Non PO (timesheets, expenses, signoff, IDC, accruals, ERV)
‣ Incurred = Actual Cost
• Purchase Order w/o Progress Certificate
‣ Incurred = Actual Cost
• Purchase Order with Progress Certificate by contract type
• Lumpsum
‣ Incurred = (Earned % +Owner Observed %)* Current Budget
• Time & Material
‣ Incurred = (Earned % +Owner Observed %)* (Actual to date
Mhr)*(labor unit rate ) + Material cost
• Prepayment Amount
‣ Incurred = Actual Cost
• Unit Rate
‣ Incurred = (Earned % +Owner Observed %)* (Unit Cost Rate)
April 2-6, 2017 in Las Vegas, NV USA
#C17LV
27
Progress Entry
Input:
• ETC Type (LS, Manual, Trending, Typical)
• Contract Type (LS, UR, T&M, Prepayment)
• Current Budget (qty, mhr)
• Actual (qty, mhr)
• Owner adjusted progress (accrual)
• Labor Factor (to recalculate revise unit rate)
April 2-6, 2017 in Las Vegas, NV USA
#C17LV
28
1. Work Package is populated from the Cost Sheet >Work Package
2. Within the change commit BP, we added the DE “uuu_sovlinum” field to
reference which SOV line the new cost gets added.
April 2-6, 2017 in Las Vegas, NV USA #C17LV 29
Lessons Learned
1. Do not limit yourself with the # of Business Processes (BP).
2. Autocreating a BP using the workflow is good but using a BP
creator is better, it gives you more option and flexibility.
• Filter data within the Line Item Detail
3. Ensure that you have a business owner SME / administrator
from “cradle to grave” during the configuration.
• SME knows the processes from the business side
4. Determine which business processes will be interfaced to
Unifier.
5. Unifier is a great tool but its really just a tool.
• Analysis on the output is still your job.
• Workflows are great but try not to over complicate it.
6. Hire a consultant.
April 2-6, 2017 in Las Vegas, NV USA
#C17LV
30
Please Complete Your
Session Evaluation
Evaluate this session in your COLLABORATE app.
Pull up this session and tap "Session Evaluation"
to complete the survey.
Session ID: 10429
Tips
1. Data definition source : # of decimal places
2. Migration : Workflow setup>Update Shells : Status
3. Migration : Data definitions> Basic : Pull-down menu
4. BP system record numbering will not work with
multiple PO/contracts;
5. When calculating commitment, best way is to use the
interface BP from the financial software.
6. To capture other fields within a BP, autocreate a
record holding the Data Element.
7. Add Attachment configuration; “Basic”
8. When working with the workflow design, be patient
April 2-6, 2017 in Las Vegas, NV USA
#C17LV
31