Optimal II dry construction system en
The OPTIMAL II dry construction system by EMPUR is useful wherever a low weight is required due to structural reasons or where dry screed components are being used.
The OPTIMAL II dry construction system by EMPUR is useful
wherever a low weight is required due to structural reasons
or where dry screed components are being used.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
OPTIMAL <strong>II</strong> <strong>dry</strong> <strong>construction</strong> <strong>system</strong><br />
One <strong>system</strong> panel for all instances<br />
The OPTIMAL <strong>II</strong> <strong>dry</strong> <strong>construction</strong> <strong>system</strong> by EMPUR ® is useful<br />
wherever a low weight is required due to structural reasons<br />
or where <strong>dry</strong> screed compon<strong>en</strong>ts are being used.<br />
The <strong>system</strong> consists of hard foam panels of the highest<br />
rigidity and foam incorporated grooves and pipe redirectors.<br />
The aluminium/steel heat conduction plates that are to be<br />
inserted <strong>en</strong>sure quick and ev<strong>en</strong> heat distribution. The <strong>dry</strong><br />
screed load distribution layer can be placed into position<br />
immediately after the pipes have be<strong>en</strong> laid.<br />
The <strong>system</strong> panel can be used in many layouts, also ideal<br />
as wall panel heating in r<strong>en</strong>ovation projects.<br />
Our OPTIMAL <strong>II</strong> <strong>dry</strong> <strong>construction</strong> <strong>system</strong><br />
impresses<br />
• Quick laying<br />
• Fast <strong>construction</strong> progress in combination with <strong>dry</strong><br />
screed panels<br />
• Easy handling of the few <strong>system</strong> compon<strong>en</strong>ts<br />
• Quick laying of metal connecting pipes through<br />
predefined grooves<br />
• Low surface area weight – ideal for the r<strong>en</strong>ovation<br />
of old buildings<br />
7F 385-F<br />
The fast solution for r<strong>en</strong>ovations or new builds<br />
OPTIMAL <strong>II</strong><br />
Install <strong>system</strong><br />
panels, fit<br />
guide panels<br />
and aluminium<br />
composite<br />
pipe<br />
Leak testing,<br />
install <strong>dry</strong><br />
screed panels<br />
Install floor<br />
top covering<br />
result:<br />
<strong>Optimal</strong> <strong>II</strong> is a clean, high-performance<br />
<strong>system</strong> for very rapid <strong>construction</strong> progress<br />
VERY FAST<br />
Time u u 1st day u 2nd day u 3rd day<br />
5