on the Black Sea - Trenchless International
on the Black Sea - Trenchless International
on the Black Sea - Trenchless International
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PROJeCts<br />
July 2010 - <strong>Trenchless</strong> Internati<strong>on</strong>al<br />
26<br />
Gold medal for green pipeline<br />
The c<strong>on</strong>structi<strong>on</strong> of a gas pipeline to supply 2014 Winter Olympic Games venues is setting new<br />
standards for envir<strong>on</strong>mental management in Russia, with an innovative use of directi<strong>on</strong>al drilling and<br />
microtunnelling affording maximum protecti<strong>on</strong> for <strong>the</strong> <strong>Black</strong> <strong>Sea</strong> coastal ecosystem.<br />
The 177 Km Dzhubga – Lazarevskoye –<br />
sochi Pipeline is part of <strong>the</strong> infrastructure<br />
being developed by <strong>the</strong> Russian<br />
Government in preparati<strong>on</strong> for <strong>the</strong><br />
2014 Winter Olympics, and is intended<br />
to reduce <strong>the</strong> energy deficiency <strong>on</strong><br />
<strong>the</strong> Caucasian coast of <strong>the</strong> <strong>Black</strong> sea.<br />
When complete, its transport capacity of<br />
3.8 billi<strong>on</strong> cubic metres per annum (Bcm/a)<br />
will ensure gas supply to Olympic venues<br />
in <strong>the</strong> mountain area of sochi, as well as<br />
<strong>the</strong> many resorts operating in <strong>the</strong> regi<strong>on</strong>.<br />
A large comp<strong>on</strong>ent of <strong>the</strong> 530 mm<br />
diameter pipeline will be offshore, with a<br />
159.9 km secti<strong>on</strong> located in <strong>the</strong> <strong>Black</strong> sea<br />
approximately 4.5 km from <strong>the</strong> Dzhubga to<br />
sochi coastline. Landfalls for <strong>the</strong> pipeline<br />
are located in <strong>the</strong> vicinity of Dzhubga,<br />
Novomikhailovka, tuapse and Kudepsta.<br />
Gazprom will own and operate <strong>the</strong> pipeline,<br />
while stroygazm<strong>on</strong>tazh has been<br />
c<strong>on</strong>tracted for c<strong>on</strong>structi<strong>on</strong>. C<strong>on</strong>structi<strong>on</strong><br />
work <strong>on</strong> <strong>the</strong> Dzhubga – Lazarevskoye<br />
– sochi Pipeline began in september<br />
2009, and is scheduled for completi<strong>on</strong> in<br />
June 2010. <strong>the</strong> c<strong>on</strong>structi<strong>on</strong> process has<br />
required detailed planning and c<strong>on</strong>siderable<br />
technical expertise, as <strong>the</strong> route<br />
traverses difficult and varied terrain.<br />
Displaying a drill head used in bore parts of <strong>the</strong><br />
Dzhubga – Lazarevskoye – Sochi pipeline.<br />
hdd safeguards <strong>Black</strong> <strong>Sea</strong> coast<br />
On land, <strong>the</strong> pipeline must negotiate<br />
large changes in elevati<strong>on</strong> and steep<br />
rock formati<strong>on</strong>s. Accordingly, horiz<strong>on</strong>tal<br />
directi<strong>on</strong>al drilling (HDD) has been used<br />
to install <strong>the</strong> pipeline in <strong>the</strong>se areas.<br />
In additi<strong>on</strong>, <strong>the</strong> <strong>Black</strong> sea coast is part<br />
of <strong>the</strong> sochi Nati<strong>on</strong>al Park and <strong>on</strong>e of <strong>the</strong><br />
most carefully c<strong>on</strong>served ecosystems in<br />
Russia. to avoid harming local wildlife,<br />
HDD rig in acti<strong>on</strong> <strong>on</strong> <strong>the</strong> <strong>Black</strong> <strong>Sea</strong> shore crossing.<br />
pipeline installati<strong>on</strong> was scheduled to<br />
take into account <strong>the</strong> life cycle of native<br />
fauna. HDD was used to install <strong>the</strong> shore<br />
approaches near tuapse and Kudepsta,<br />
fur<strong>the</strong>r minimising disrupti<strong>on</strong> to this fragile<br />
coastal envir<strong>on</strong>ment. According to a<br />
Gazprom spokespers<strong>on</strong>, this is <strong>the</strong> first<br />
time that HDD has been used in a shore<br />
approach in Russia.<br />
<strong>the</strong> use of HDD not <strong>on</strong>ly helped preserve<br />
<strong>the</strong> coastal ecosystem, but also<br />
allowed <strong>the</strong> pipe to negotiate <strong>the</strong> steep<br />
coastal cliffs. While ultimately successful,<br />
engineers working <strong>on</strong> this process were<br />
forced to use innovati<strong>on</strong> to overcome a<br />
serious technical challenge.<br />
A Gazprom spokespers<strong>on</strong> said “During<br />
directi<strong>on</strong>al drilling, <strong>the</strong> c<strong>on</strong>structi<strong>on</strong> team<br />
faced <strong>the</strong> problem of mud disappearing<br />
into natural cavities or ‘voids’ in <strong>the</strong> rocks.<br />
<strong>the</strong> team found a way out by filling<br />
<strong>the</strong> voids with a cement-c<strong>on</strong>crete soluti<strong>on</strong>.<br />
After solidificati<strong>on</strong>, drilling was able<br />
to c<strong>on</strong>tinue.”<br />
In additi<strong>on</strong> to HDD, microtunnelling was<br />
used to install <strong>the</strong> pipeline at all river<br />
crossings, which offered fur<strong>the</strong>r envir<strong>on</strong>mental<br />
protecti<strong>on</strong>.<br />
<strong>the</strong> decisi<strong>on</strong> to c<strong>on</strong>struct a gas pipeline<br />
<strong>on</strong> <strong>the</strong> seabed will also reduce<br />
<strong>the</strong> need for c<strong>on</strong>structi<strong>on</strong> <strong>on</strong> industrial,<br />
Manoeuvring pipe into place.<br />
agricultural and forest lands. While making<br />
<strong>the</strong> project more expensive, <strong>the</strong>se<br />
various envir<strong>on</strong>mental protecti<strong>on</strong> measures<br />
were c<strong>on</strong>sidered by Gazprom to be<br />
more than worthwhile, and a company<br />
spokespers<strong>on</strong> was able to report that all<br />
works were c<strong>on</strong>ducted without impacting<br />
<strong>the</strong> surrounding landscape.<br />
PROJeCts<br />
July 2010 - <strong>Trenchless</strong> Internati<strong>on</strong>al 27