North Creek Drainage Needs Report - Snohomish County
North Creek Drainage Needs Report - Snohomish County
North Creek Drainage Needs Report - Snohomish County
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>North</strong> <strong>Creek</strong><br />
<strong>Drainage</strong> <strong>Needs</strong> <strong>Report</strong><br />
DNR No. 10<br />
DECEMBER 2002<br />
<strong>Snohomish</strong> <strong>County</strong><br />
Public Works<br />
Surface Water Management Division<br />
2731 Wetmore Avenue, 2nd Floor<br />
Everett, WA 98201<br />
425-388-3464
Responsible <strong>County</strong> Officials<br />
The <strong>Drainage</strong> <strong>Needs</strong> <strong>Report</strong> (DNR) Project is an innovative 2-year project that was<br />
initiated by the <strong>Snohomish</strong> <strong>County</strong> Council in 2001. The project was completed under<br />
the direction of the following <strong>Snohomish</strong> <strong>County</strong> government officials:<br />
2002 <strong>Snohomish</strong> <strong>County</strong> Council:<br />
• John Koster, Council District 1<br />
• Kirke Sievers, Council District 2<br />
• Gary Nelson, Council District 3, Council Chair<br />
• Dave Gossett, Council District 4<br />
• Jeff Sax, Council District 5<br />
<strong>Snohomish</strong> <strong>County</strong> Executive:<br />
• Bob Drewel<br />
<strong>Snohomish</strong> <strong>County</strong> Public Works:<br />
• Public Works Director: Peter Hahn<br />
• Public Works, Surface Water Management (SWM) Division Director: Joan Lee, P.E.<br />
• DNR Project Director: Loren Sand, P.E.<br />
• DNR Technical Manager and SWM Coordinator: Gregg Farris, P.E.<br />
• <strong>Snohomish</strong> <strong>County</strong> SWM <strong>Drainage</strong> Supervisor: Karen Kerwin, P.E.<br />
Responsible <strong>County</strong> Officials<br />
NORTH CREEK ACKNOWLEDGMENTS_FINAL.DOC ii DECEMBER 2002
Acknowledgments<br />
This <strong>North</strong> <strong>Creek</strong> <strong>Drainage</strong> <strong>Needs</strong> <strong>Report</strong> (DNR) was prepared in coordination with<br />
<strong>Snohomish</strong> <strong>County</strong> Public Works, Surface Water Management (SCSWM) Division, by a<br />
consultant team consisting of CH2M HILL, Tetra Tech/KCM, Aqua Terra Consultants,<br />
Otak, GeoEngineers, TerraLogic GIS, and R.W. Beck. Technical support was provided<br />
by a separate consultant team consisting of R.W. Beck, Entranco, Herrera<br />
Environmental Consultants, <strong>North</strong>west Hydraulic Consultants, and Parametrix.<br />
The preparation of this report was shared between multiple firms, with Tetra Tech/KCM<br />
leading the Penny <strong>Creek</strong>, Silver <strong>Creek</strong>, Middle 2 and South <strong>North</strong> <strong>Creek</strong> subbasins, and<br />
CH2M HILL leading the <strong>North</strong> and Middle 1 <strong>North</strong> <strong>Creek</strong> subbasins. This report was<br />
prepared and reviewed by the following lead staff:<br />
Team Project Manager John Rogers, P.E., CH2M HILL<br />
DNR Lead Tony Melone, P.E., Tetra Tech/KCM<br />
Teresa Platin, P.E., CH2M HILL<br />
Gregg Farris, P.E., SWM DNR Lead Reviewer<br />
Hydraulic Modeling Greg Gaasland, P.E., Tetra Tech/KCM<br />
Tom Spangenberg, P.E., Tetra Tech/KCM<br />
Jerry Scheller, P.E., CH2M HILL<br />
Tawni Hoang, CH2M HILL<br />
Gregg Farris, P.E., SWM DNR Hydraulic Lead<br />
Hydrologic Modeling Joe Brascher, Aqua Terra<br />
Doug Beyerlein, P.E., Aqua Terra<br />
Gregg Farris, P.E., SWM DNR Hydrologic Lead<br />
<strong>Drainage</strong> Inventory Bill Lawrence, P.L.S., Otak<br />
Mike McGuiness, SWM GIS/GPS Resource Manager<br />
Habitat Analysis Hans Ehlert, Wetlands/Riparian Lead, CH2M HILL<br />
Randy Whitman, Aquatic Habitat Lead, CH2M HILL<br />
Caroline Barnes, P.E., Tetra Tech/KCM<br />
Darrell Smith, SWM DNR Habitat Lead<br />
Water Quality Analysis Harry Gibbons, Tetra Tech/KCM<br />
Reid Adams, P.E., CH2M HILL<br />
Geomorphology Analysis Mary Ann Reinhart, P.G., P.E.G., GeoEngineers<br />
Acknowledgments<br />
NORTH CREEK ACKNOWLEDGMENTS_FINAL.DOC iii DECEMBER 2002
Capital Improvement Greg Gaasland, P.E., Tetra Tech/KCM<br />
Program (CIP) Project Teresa Platin, P.E., CH2M HILL<br />
Development Dennis Galinato, CH2M HILL<br />
Gregg Farris, P.E., SWM DNR Lead Reviewer<br />
Darrell Smith, SWM DNR Habitat Lead<br />
Geographic Information Jane Cassady, TerraLogic GIS<br />
System (GIS) Analysis Levon Yengoyan, TerraLogic GIS<br />
Scott Corwin, R.W. Beck<br />
Christine Coats, SWM DNR GIS Lead<br />
Acknowledgments<br />
NORTH CREEK ACKNOWLEDGMENTS_FINAL.DOC iv DECEMBER 2002
Contents<br />
Page<br />
Responsible <strong>County</strong> Officials ........................................................................................ ii<br />
Acknowledgments ......................................................................................................... iii<br />
Acronyms and Abbreviations ...................................................................................... xv<br />
Executive Summary.................................................................................................. ES-1<br />
1.0 Introduction .........................................................................................................1-1<br />
1.1 Purpose .....................................................................................................1-1<br />
1.2 <strong>North</strong> <strong>Creek</strong> Study Area ............................................................................1-1<br />
1.3 <strong>Report</strong> Organization ..................................................................................1-2<br />
2.0 Basin Characteristics..........................................................................................2-1<br />
2.1 Hydrologic Characteristics.........................................................................2-1<br />
2.1.1 General Basin Description ..........................................................2-1<br />
2.1.2 Soils and Geology.......................................................................2-2<br />
2.1.3 Groundwater ...............................................................................2-3<br />
2.1.4 Topography and Slope ...............................................................2-4<br />
2.1.5 Land Use and Cover...................................................................2-4<br />
2.2 Conveyance Systems..............................................................................2-30<br />
2.2.1 Streams ....................................................................................2-30<br />
2.2.2 <strong>Drainage</strong> Systems ....................................................................2-32<br />
2.3 Stream and Wetland Habitat ...................................................................2-33<br />
2.3.1 Stream Habitat..........................................................................2-33<br />
2.3.2 Wetland Habitat ........................................................................2-34<br />
2.4 Water Quality...........................................................................................2-34<br />
2.5 Stream Channel Erosion .........................................................................2-35<br />
3.0 Hydrologic and Hydraulic Modeling ..................................................................3-1<br />
3.1 Introduction................................................................................................3-1<br />
3.2 Hydrologic Model Selection.......................................................................3-1<br />
3.3 HSPF Hydrologic Model Development and Results ..................................3-1<br />
3.3.1 Data Collection ...........................................................................3-2<br />
3.3.2 HSPF Model Set-Up ...................................................................3-2<br />
3.3.3 HSPF Model Results ..................................................................3-5<br />
3.4 Hydraulic Model Selection.........................................................................3-6<br />
3.4.1 Penny <strong>Creek</strong> Subbasin .............................................................3-10<br />
3.4.2 Silver <strong>Creek</strong> Subbasin ..............................................................3-10<br />
3.4.3 <strong>North</strong> <strong>North</strong> <strong>Creek</strong> Subbasin.....................................................3-10<br />
3.4.4 Middle 1 <strong>North</strong> <strong>Creek</strong> Subbasin................................................3-12<br />
3.4.5 Middle 2 <strong>North</strong> <strong>Creek</strong> Subbasin................................................3-13<br />
3.4.6 South <strong>North</strong> <strong>Creek</strong> Subbasin ....................................................3-13<br />
Contents<br />
NORTH CREEK CONTENTS_FINAL.DOC v DECEMBER 2002
<strong>North</strong> <strong>Creek</strong> <strong>Drainage</strong> <strong>Needs</strong> <strong>Report</strong><br />
3.5 Hydraulic Model Data Collection .............................................................3-13<br />
3.6 Hydraulic Model Development and Results: Penny <strong>Creek</strong><br />
Subbasin..................................................................................................3-13<br />
3.6.1 Introduction ...............................................................................3-13<br />
3.6.2 HEC-RAS Model Set-Up...........................................................3-14<br />
3.6.3 HEC-RAS Model Results..........................................................3-27<br />
3.6.4 SWMM Model Set-Up ...............................................................3-27<br />
3.6.5 SWMM Model Results ..............................................................3-31<br />
3.7 Hydraulic Model Development and Results: Silver <strong>Creek</strong><br />
Subbasin..................................................................................................3-35<br />
3.7.1 Introduction ...............................................................................3-35<br />
3.7.2 HEC-RAS Model Set-Up...........................................................3-35<br />
3.7.3 HEC-RAS Model Results..........................................................3-35<br />
3.7.4 SWMM Model Set-Up ...............................................................3-36<br />
3.7.5 SWMM Model Results ..............................................................3-36<br />
3.8 Hydraulic Model Development and Results: <strong>North</strong> <strong>North</strong> <strong>Creek</strong><br />
Subbasin..................................................................................................3-37<br />
3.8.1 Introduction ...............................................................................3-37<br />
3.8.2 HEC-RAS Model Set-Up...........................................................3-37<br />
3.8.3 HEC-RAS Model Results..........................................................3-41<br />
3.8.4 SWMM Model Set-Up ...............................................................3-41<br />
3.8.5 SWMM Model Results ..............................................................3-46<br />
3.8.6 HY-8 and KCBW Model Development......................................3-51<br />
3.8.7 KCBW Model Results ...............................................................3-52<br />
3.9 Hydraulic Model Development and Results: Middle 1 <strong>North</strong><br />
<strong>Creek</strong> Subbasin.......................................................................................3-52<br />
3.9.1 Introduction..................................................................................3-52<br />
3.9.2 HEC-RAS Model Set-Up ............................................................3-52<br />
3.9.3 HEC-RAS Model Results............................................................3-54<br />
3.9.4 SWMM Model Set-Up.................................................................3-55<br />
3.9.5 SWMM Model Results ................................................................3-58<br />
3.9.6 Other Model Development...........................................................3-59<br />
3.10 Hydraulic Model Development and Results: Middle 2 <strong>North</strong><br />
<strong>Creek</strong> Subbasin.......................................................................................3-59<br />
3.10.1 Introduction ...............................................................................3-59<br />
3.10.2 HEC-RAS Model Set-Up...........................................................3-59<br />
3.10.3 HEC-RAS Model Results..........................................................3-63<br />
3.10.4 SWMM Model Set-Up ...............................................................3-63<br />
3.10.5 SWMM Model Results ..............................................................3-64<br />
3.11 Hydraulic Model Development: South <strong>North</strong> <strong>Creek</strong> Subbasin.................3-64<br />
3.11.1 Introduction ...............................................................................3-64<br />
3.11.2 HEC-RAS Model Set-Up...........................................................3-64<br />
3.11.3 HEC-RAS Model Results..........................................................3-66<br />
3.11.4 SWMM Model Set-Up ...............................................................3-66<br />
3.11.5 SWMM Model Results ..............................................................3-66<br />
4.0 Habitat Assessment............................................................................................4-1<br />
4.1 Introduction................................................................................................4-1<br />
4.1.1 Scope of Assessment .................................................................4-1<br />
4.1.2 Fish Habitat and Use ..................................................................4-1<br />
4.2 Background ...............................................................................................4-2<br />
Contents<br />
NORTH CREEK CONTENTS_FINAL.DOC vi DECEMBER 2002
<strong>North</strong> <strong>Creek</strong> <strong>Drainage</strong> <strong>Needs</strong> <strong>Report</strong><br />
4.2.1 Instream Habitat .........................................................................4-2<br />
4.2.2 Biotic Integrity ...........................................................................4-17<br />
4.2.3 Fish Passage ............................................................................4-17<br />
4.2.4 Riparian Habitat ........................................................................4-18<br />
4.2.5 Wetlands...................................................................................4-18<br />
4.3 Methods...................................................................................................4-19<br />
4.3.1 Selection of Assessment Sites .................................................4-19<br />
4.3.2 Instream Habitat .......................................................................4-20<br />
4.3.3 Biotic Integrity ...........................................................................4-21<br />
4.3.4 Fish Passage ............................................................................4-21<br />
4.3.5 Riparian Habitat ........................................................................4-21<br />
4.3.6 Wetland Habitat ........................................................................4-22<br />
4.3.7 Analysis ....................................................................................4-22<br />
4.3.8 Assessment Criteria..................................................................4-22<br />
4.4 Results and Discussion ...........................................................................4-23<br />
4.4.1 Instream Habitat .......................................................................4-23<br />
4.4.2 Biotic Integrity ...........................................................................4-25<br />
4.4.3 Fish Passage ............................................................................4-25<br />
4.4.4 Riparian Habitat ........................................................................4-25<br />
4.4.5 Wetlands Habitat ......................................................................4-26<br />
5.0 Water Quality Assessment.................................................................................5-1<br />
5.1 Introduction................................................................................................5-1<br />
5.2 Land Use Patterns Affecting Water Quality ...............................................5-1<br />
5.3 Summary of Available Water Quality Information......................................5-3<br />
5.4 Water Quality Analysis Methods................................................................5-4<br />
5.5 Existing Water Quality ...............................................................................5-4<br />
5.5.1 Fecal Coliform.............................................................................5-8<br />
5.5.2 Dissolved Oxygen.......................................................................5-9<br />
5.5.3 Temperature ...............................................................................5-9<br />
5.5.4 Nutrients ...................................................................................5-10<br />
5.5.5 Total Suspended Solids and Turbidity ......................................5-10<br />
5.5.6 Heavy Metals ............................................................................5-11<br />
5.5.7 Summary ..................................................................................5-11<br />
5.6 Future Water Quality ...............................................................................5-12<br />
6.0 Channel Erosion Assessment............................................................................6-1<br />
6.1 Introduction................................................................................................6-1<br />
6.2 Channel Erosion Assessment Methods.....................................................6-2<br />
6.3 Channel Erosion and Sediment Conditions...............................................6-2<br />
7.0 CIP Design Guidelines........................................................................................7-1<br />
7.1 Introduction................................................................................................7-1<br />
7.2 Flooding and <strong>Drainage</strong> Design Guidelines................................................7-1<br />
7.2.1 Problem Definition Criteria..........................................................7-1<br />
7.2.2 Design Guidelines.......................................................................7-2<br />
7.3 Aquatic Habitat Design Guidelines............................................................7-4<br />
7.3.1 Problem Definition Criteria..........................................................7-4<br />
7.3.2 Design Guidelines.......................................................................7-6<br />
7.4 Water Quality Design Guidelines...............................................................7-7<br />
7.4.1 Problem Definition Criteria..........................................................7-7<br />
Contents<br />
NORTH CREEK CONTENTS_FINAL.DOC vii DECEMBER 2002
<strong>North</strong> <strong>Creek</strong> <strong>Drainage</strong> <strong>Needs</strong> <strong>Report</strong><br />
7.4.2 Design Guidelines.......................................................................7-7<br />
7.5 Channel Erosion Design Guidelines..........................................................7-7<br />
7.5.1 Problem Definition Criteria..........................................................7-7<br />
7.5.2 Design Guidelines.......................................................................7-7<br />
8.0 Existing and Future Problems ...........................................................................8-1<br />
8.1 Introduction................................................................................................8-1<br />
8.2 Flooding and Maintenance Problems........................................................8-1<br />
8.2.1 Flooding Problems......................................................................8-2<br />
8.2.2 Maintenance Problems .............................................................8-62<br />
8.3 Habitat Problems.....................................................................................8-63<br />
8.3.1 Fish Passage Barriers ..............................................................8-63<br />
8.3.2 Excessive Fine Sediment .........................................................8-85<br />
8.3.3 Limited Instream LWD ..............................................................8-85<br />
8.3.4 Excessive Bedload Movement..................................................8-86<br />
8.3.5 Areas Lacking LWD Recruitment, Shade, and/or<br />
Riparian Width ..........................................................................8-86<br />
8.3.6 Substantial Wetland Loss .........................................................8-87<br />
8.4 Water Quality Problems...........................................................................8-87<br />
8.4.1 Pollution Generated by Residential Development ....................8-87<br />
8.4.2 Point and Nonpoint Source Pollution from Impervious<br />
Surfaces....................................................................................8-88<br />
8.4.3 Pollution Generated by Pasture and Agricultural Lands ...........8-92<br />
8.4.4 Pollution Generated by Commercial and Light Industrial<br />
Uses..........................................................................................8-95<br />
8.5 Erosion and Sedimentation Problems .....................................................8-96<br />
9.0 CIP Development, Alternatives Analysis, and Recommended<br />
Solutions..............................................................................................................9-1<br />
9.1 Problem Selection for CIP Modeling..........................................................9-1<br />
9.2 Modeling Alternatives ..............................................................................9-10<br />
9.2.1 CIP Modeling Alternative 1 .......................................................9-11<br />
9.2.2 CIP Modeling Alternative 2 .......................................................9-12<br />
9.2.3 Penny <strong>Creek</strong> Subbasin Modeling Alternatives..........................9-12<br />
9.2.4 Silver <strong>Creek</strong> Subbasin Modeling Alternatives...........................9-35<br />
9.2.5 <strong>North</strong> <strong>North</strong> <strong>Creek</strong> Subbasin Modeling Alternatives .................9-38<br />
9.2.6 Middle 1 <strong>North</strong> <strong>Creek</strong> Subbasin Modeling Alternatives ............9-46<br />
9.2.7 Middle 2 <strong>North</strong> <strong>Creek</strong> Subbasin Modeling Alternatives ............9-51<br />
9.2.8 South <strong>North</strong> <strong>Creek</strong> Subbasin Modeling Alternatives.................9-52<br />
9.2.9 Basin Wide Alternative Summary Results ................................9-59<br />
9.3 Other Habitat, Water Quality, and Erosion CIP Projects .........................9-60<br />
9.3.1 Habitat CIP Projects .................................................................9-61<br />
9.3.2 Water Quality CIP Projects .......................................................9-78<br />
9.3.3 Erosion CIP Projects.................................................................9-83<br />
10.0 Recommended Plan..........................................................................................10-1<br />
10.1 Introduction..............................................................................................10-1<br />
10.2 Project Selection Criteria and Methodology ............................................10-1<br />
10.2.1 Evaluation Criteria ....................................................................10-2<br />
10.3 Recommended CIP Projects ...................................................................10-5<br />
Contents<br />
NORTH CREEK CONTENTS_FINAL.DOC viii DECEMBER 2002
<strong>North</strong> <strong>Creek</strong> <strong>Drainage</strong> <strong>Needs</strong> <strong>Report</strong><br />
10.3.1 Responsibility for Implementation (Public/Private and<br />
Unincorporated/Incorporated)...................................................10-5<br />
10.3.2 Project Sequencing.................................................................10-49<br />
10.3.3 Funding...................................................................................10-49<br />
10.3.4 Permits....................................................................................10-49<br />
10.3.5 Early Action Projects...............................................................10-50<br />
10.4 Other Recommendations.......................................................................10-50<br />
10.4.1 Maintenance ...........................................................................10-51<br />
10.4.2 Additional Studies ...................................................................10-51<br />
10.4.3 Potential Mitigation Projects ...................................................10-56<br />
10.4.4 Detention Pond Retrofits.........................................................10-56<br />
10.4.5 Ditch Retrofits .........................................................................10-57<br />
10.4.6 Coordination with Cities of Bothell, Mill <strong>Creek</strong> and<br />
Everett to Implement Water Quality Improvements ................10-57<br />
10.4.7 Small Farm Best Management Practices ...............................10-57<br />
10.4.8 Sweeping of Public Parking Lots ............................................10-58<br />
10.4.9 Cleaning of Catch Basins in Targeted Areas..........................10-58<br />
11.0 References.........................................................................................................11-1<br />
Appendices<br />
A Hydrologic Model Development and Application<br />
B1 Hydraulic Model Development and Application for Penny <strong>Creek</strong><br />
B2 Hydraulic Model Development and Application for Silver/Nickel <strong>Creek</strong>s<br />
B3 Hydraulic Model Development and Application for <strong>North</strong> <strong>North</strong> <strong>Creek</strong><br />
B4 Hydraulic Model Development and Application for Middle 1 <strong>North</strong> <strong>Creek</strong><br />
B5 Hydraulic Model Development and Application for Middle 2 <strong>North</strong> <strong>Creek</strong><br />
B6 Hydraulic Model Development and Application for South <strong>North</strong> <strong>Creek</strong><br />
C Habitat Surveys, Data Analysis, and Results<br />
D Water Quality Data and Results<br />
E Geomorphic Channel Evaluation<br />
F Project Summaries and Cost Estimates<br />
Contents<br />
NORTH CREEK CONTENTS_FINAL.DOC ix DECEMBER 2002
Figures<br />
<strong>North</strong> <strong>Creek</strong> <strong>Drainage</strong> <strong>Needs</strong> <strong>Report</strong><br />
1-1<br />
Page<br />
<strong>County</strong> DNR Areas ...........................................................................................1-3<br />
1-2 <strong>North</strong> <strong>Creek</strong> Basin DNR Study Area.................................................................1-5<br />
2-1a Penny <strong>Creek</strong> Subbasin Existing Land Use .......................................................2-5<br />
2-1b Silver <strong>Creek</strong> Subbasin Existing Land Use ........................................................2-7<br />
2-1c <strong>North</strong> <strong>North</strong> <strong>Creek</strong> Subbasin Existing Land Use ..............................................2-9<br />
2-1d Middle 1 <strong>North</strong> <strong>Creek</strong> Subbasin Existing Land Use........................................2-11<br />
2-1e Middle 2 <strong>North</strong> <strong>Creek</strong> Subbasin Existing Land Use........................................2-13<br />
2-1f South <strong>North</strong> <strong>Creek</strong> Subbasin Existing Land Use ............................................2-15<br />
2-2a Penny <strong>Creek</strong> Subbasin Future Land Use .......................................................2-17<br />
2-2b Silver <strong>Creek</strong> Subbasin Future Land Use.........................................................2-19<br />
2-2c <strong>North</strong> <strong>North</strong> <strong>Creek</strong> Subbasin Future Land Use...............................................2-21<br />
2-2d Middle 1 <strong>North</strong> <strong>Creek</strong> Subbasin Future Land Use ..........................................2-23<br />
2-2e Middle 2 <strong>North</strong> <strong>Creek</strong> Subbasin Future Land Use ..........................................2-25<br />
2-2f South <strong>North</strong> <strong>Creek</strong> Subbasin Future Land Use ..............................................2-27<br />
3-1a Penny <strong>Creek</strong> Subbasin Hydrologic and Hydraulic Modeling<br />
Locations ........................................................................................................3-15<br />
3-1b Silver <strong>Creek</strong> Subbasin Hydrologic and Hydraulic Modeling<br />
Locations ........................................................................................................3-17<br />
3-1c <strong>North</strong> <strong>North</strong> <strong>Creek</strong> Subbasin Hydrologic and Hydraulic Modeling<br />
Locations ........................................................................................................3-19<br />
3-1d Middle 1 <strong>North</strong> <strong>Creek</strong> Subbasin Hydrologic and Hydraulic Modeling<br />
Locations ........................................................................................................3-21<br />
3-1e Middle 2 <strong>North</strong> <strong>Creek</strong> Subbasin Hydrologic and Hydraulic Modeling<br />
Locations ........................................................................................................3-23<br />
3-1f South <strong>North</strong> <strong>Creek</strong> Subbasin Hydrologic and Hydraulic Modeling<br />
Locations ........................................................................................................3-25<br />
4-1a Penny <strong>Creek</strong> Subbasin Instream Habitats........................................................4-3<br />
4-1b Silver <strong>Creek</strong> Subbasin Instream Habitats ........................................................4-5<br />
4-1c <strong>North</strong> <strong>North</strong> <strong>Creek</strong> Subbasin Instream Habitats................................................4-7<br />
4-1d Middle 1 <strong>North</strong> <strong>Creek</strong> Subbasin Instream Habitats...........................................4-9<br />
4-1e Middle 2 <strong>North</strong> <strong>Creek</strong> Subbasin Instream Habitats.........................................4-11<br />
4-1f South <strong>North</strong> <strong>Creek</strong> Subbasin Instream Habitats.............................................4-13<br />
4-2a Penny <strong>Creek</strong> Subbasin Wetlands and Riparian Corridors..............................4-27<br />
4-2b Silver <strong>Creek</strong> Subbasin Wetlands and Riparian Corridors ...............................4-29<br />
4-2c <strong>North</strong> <strong>North</strong> <strong>Creek</strong> Subbasin Wetlands and Riparian Corridors......................4-31<br />
4-2d Middle 1 <strong>North</strong> <strong>Creek</strong> Subbasin Wetlands and Riparian Corridors.................4-33<br />
4-2e Middle 2 <strong>North</strong> <strong>Creek</strong> Subbasin Wetlands and Riparian Corridors.................4-35<br />
4-2f South <strong>North</strong> <strong>Creek</strong> Subbasin Wetlands and Riparian Corridors.....................4-37<br />
5-1 Water Quality Monitoring and Outfall Screening Locations ..............................5-5<br />
8-1a Penny <strong>Creek</strong> Subbasin Flooding Problem Locations......................................8-37<br />
8-1b Silver <strong>Creek</strong> Subbasin Flooding Problem Locations.......................................8-39<br />
8-1c <strong>North</strong> <strong>North</strong> <strong>Creek</strong> Subbasin Flooding Problem Locations .............................8-41<br />
Contents<br />
NORTH CREEK CONTENTS_FINAL.DOC xi DECEMBER 2002
<strong>North</strong> <strong>Creek</strong> <strong>Drainage</strong> <strong>Needs</strong> <strong>Report</strong><br />
8-1d Middle 1 <strong>North</strong> <strong>Creek</strong> Subbasin Flooding Problem Locations ........................8-43<br />
8-1e Middle 2 <strong>North</strong> <strong>Creek</strong> Subbasin Flooding Problem Locations ........................8-45<br />
8-1f South <strong>North</strong> <strong>Creek</strong> Subbasin Flooding Problem Locations.............................8-47<br />
8-2a Penny <strong>Creek</strong> Subbasin Habitat Problem Locations........................................8-73<br />
8-2b Silver <strong>Creek</strong> Subbasin Habitat Problem Locations .........................................8-75<br />
8-2c <strong>North</strong> <strong>North</strong> <strong>Creek</strong> Subbasin Habitat Problem Locations................................8-77<br />
8-2d Middle 1 <strong>North</strong> <strong>Creek</strong> Subbasin Habitat Problem Locations...........................8-79<br />
8-2e Middle 2 <strong>North</strong> <strong>Creek</strong> Subbasin Habitat Problem Locations...........................8-81<br />
8-2f South <strong>North</strong> <strong>Creek</strong> Subbasin Habitat Problem Locations...............................8-83<br />
8-3 Water Quality Problem Locations ...................................................................8-93<br />
9-1a Penny <strong>Creek</strong> Subbasin Modeling Alternative CIP Projects.............................9-25<br />
9-1b Silver <strong>Creek</strong> Subbasin Modeling Alternative CIP Projects..............................9-39<br />
9-1c <strong>North</strong> <strong>North</strong> <strong>Creek</strong> Subbasin Modeling Alternative CIP Projects….................9-41<br />
9-1d Middle 1 <strong>North</strong> <strong>Creek</strong> Subbasin Modeling Alternative CIP Projects ...............9-49<br />
9-1e Middle 2 <strong>North</strong> <strong>Creek</strong> Subbasin Modeling Alternative CIP Projects ...............9-53<br />
9-1f South <strong>North</strong> <strong>Creek</strong> Subbasin Modeling Alternative CIP Projects....................9-57<br />
9-2a Penny <strong>Creek</strong> Subbasin Additional Habitat and Water Quality CIP Projects ...9-65<br />
9-2b Silver <strong>Creek</strong> Subbasin Additional Habitat and Water Quality CIP Projects ....9-67<br />
9-2c <strong>North</strong> <strong>North</strong> <strong>Creek</strong> Subbasin Additional Habitat and Water Quality<br />
CIP Projects....................................................................................................9-69<br />
9-2d Middle 1 <strong>North</strong> <strong>Creek</strong> Subbasin Additional Habitat and Water Quality CIP<br />
Projects...........................................................................................................9-71<br />
9-2e Middle 2 <strong>North</strong> <strong>Creek</strong> Subbasin Additional Habitat and Water Quality CIP<br />
Projects...........................................................................................................9-73<br />
9-2f South <strong>North</strong> <strong>Creek</strong> Subbasin Additional Habitat and Water Quality CIP<br />
Projects...........................................................................................................9-75<br />
10-1a Penny <strong>Creek</strong> Subbasin Recommended CIP Projects...................................10-37<br />
10-1b Silver <strong>Creek</strong> Subbasin Recommended CIP Projects....................................10-39<br />
10-1c <strong>North</strong> <strong>North</strong> <strong>Creek</strong> Subbasin Recommended CIP Projects ..........................10-41<br />
10-1d Middle 1 <strong>North</strong> <strong>Creek</strong> Subbasin Recommended CIP Projects......................10-43<br />
10-1e Middle 2 <strong>North</strong> <strong>Creek</strong> Subbasin Recommended CIP Projects......................10-45<br />
10-1f South <strong>North</strong> <strong>Creek</strong> Subbasin Recommended CIP Projects..........................10-47<br />
Contents<br />
NORTH CREEK CONTENTS_FINAL.DOC xii DECEMBER 2002
Tables<br />
<strong>North</strong> <strong>Creek</strong> <strong>Drainage</strong> <strong>Needs</strong> <strong>Report</strong><br />
Page<br />
3-1 Existing and Future Flood Frequencies..............................................................3-7<br />
3-2 Hydraulic Models Used for Conveyance Systems ...........................................3-11<br />
3-3 HEC-RAS Hydraulic Model Results for Penny <strong>Creek</strong> Subbasin in Unincorporated<br />
UGA, Existing System with Existing and Future Land Use Conditions ....3-28<br />
3-4 SWMM Hydraulic Model Results for Penny <strong>Creek</strong> Subbasin, Existing<br />
System with Existing and Future Land Use Conditions....................................3-32<br />
3-5 SWMM Hydraulic Model Results for Silver <strong>Creek</strong> Subbasin, Existing System<br />
with Existing and Future Land Use Conditions.................................................3-38<br />
3-6 HEC-RAS Hydraulic Model Results for <strong>North</strong> <strong>North</strong> <strong>Creek</strong> Subbasin in<br />
Unincorporated UGA, Existing System with Existing and Future Land Use<br />
Conditions ........................................................................................................3-42<br />
3-7 SWMM Hydraulic Modeling Results Summary for <strong>North</strong> <strong>North</strong> <strong>Creek</strong><br />
Subbasin, Existing System with Existing and Future Land Use Conditions .....3-47<br />
3-8 KCBW Hydraulic Modeling Results Summary for <strong>North</strong> <strong>North</strong> <strong>Creek</strong> Subbasin,<br />
Existing System with Existing and Future Land Use Conditions ......................3-53<br />
3-9 HEC-RAS Hydraulic Model Results for Middle 1 <strong>North</strong> <strong>Creek</strong> Subbasin in<br />
Unincorporated UGA, Existing System with Existing and Future Land Use<br />
Conditions ........................................................................................................3-55<br />
3-10 SWMM Hydraulic Modeling Results Summary for Middle 1 <strong>North</strong> <strong>Creek</strong><br />
Subbasin, Existing System with Existing and Future Land Use Conditions .....3-60<br />
3-11 SWMM Hydraulic Model Results for Middle 2 <strong>North</strong> <strong>Creek</strong> Subbasin,<br />
Existing System with Existing and Future Land Use Conditions ......................3-65<br />
3-12 SWMM Hydraulic Model Results for South <strong>North</strong> <strong>Creek</strong> Subbasin, Existing<br />
System with Existing and Future Land Use Conditions....................................3-67<br />
4-1 Rosgen Channel Types....................................................................................4-20<br />
4-2 Instream Habitat Survey Results for Selected Attributes .................................4-24<br />
5-1 Percent Coverage by Water Quality Land Use Categories in the<br />
<strong>North</strong> <strong>Creek</strong> DNR Study Area ............................................................................5-3<br />
7-1 Selected <strong>Drainage</strong> Design Criteria from EDDS..................................................7-3<br />
7-2 Instream Habitat Condition Criteria ....................................................................7-5<br />
7-3 Habitat Condition Criteria for Riparian Areas .....................................................7-5<br />
8-1a Flooding Problems for Existing and Future Land Use Conditions<br />
Penny <strong>Creek</strong> Subbasin.......................................................................................8-3<br />
8-1b Flooding Problems for Existing and Future Land Use Conditions<br />
Silver <strong>Creek</strong> Subbasin........................................................................................8-9<br />
8-1c Flooding Problems for Existing and Future Land Use Conditions<br />
<strong>North</strong> <strong>North</strong> <strong>Creek</strong> Subbasin ............................................................................8-12<br />
8-1d Flooding Problems for Existing and Future Land Use Conditions<br />
Middle 1 <strong>North</strong> <strong>Creek</strong> Subbasin .......................................................................8-23<br />
8-1e Flooding Problems for Existing and Future Land Use Conditions<br />
Middle 2 <strong>North</strong> <strong>Creek</strong> Subbasin .......................................................................8-31<br />
8-1f Flooding Problems for Existing and Future Land Use Conditions<br />
South <strong>North</strong> <strong>Creek</strong> Subbasin............................................................................8-33<br />
Contents<br />
NORTH CREEK CONTENTS_FINAL.DOC xiii DECEMBER 2002
<strong>North</strong> <strong>Creek</strong> <strong>Drainage</strong> <strong>Needs</strong> <strong>Report</strong><br />
8-2 Existing Habitat Problems ................................................................................8-34<br />
8-3 Existing Water Quality Problems......................................................................8-89<br />
8-4 <strong>North</strong> <strong>Creek</strong> Erosion Problems ........................................................................8-97<br />
9-1 Summary of Problems Selected for Hydraulic and Hydrologic Modeling ...........9-2<br />
9-2 Modeled CIP Projects.......................................................................................9-13<br />
9-3 Modeled Flow Results for CIP Modeling Alternatives 1 and 2 .........................9-27<br />
9-4 Estimated Costs for Modeling Alternatives 1 and 2..........................................9-32<br />
9-5 Summary of Estimated Costs for CIP Modeling Alternatives by Subbasin .....9-60<br />
9-6 Habitat CIP Projects Not Modeled....................................................................9-63<br />
9-7 Habitat Problems Eliminated from Consideration in <strong>North</strong> <strong>Creek</strong> DNR Area ...9-77<br />
9-8 Summary of Riparian Revegetation Project Information by Subbasin ............9-77<br />
9-9 Water Quality CIP Projects ..............................................................................9-81<br />
10-1 CIP Project Evaluation .....................................................................................10-3<br />
10-2 Recommended Flooding Projects ....................................................................10-7<br />
10-3 Recommended Habitat Projects.....................................................................10-19<br />
10-4 Recommended Water Quality Projects ..........................................................10-25<br />
10-5 Recommended Flooding/Habitat Projects......................................................10-27<br />
10-6 Recommended Flooding/ Water Quality Projects ..........................................10-35<br />
10-7 Recommended Additional Studies/Analysis...................................................10-54<br />
Contents<br />
NORTH CREEK CONTENTS_FINAL.DOC xiv DECEMBER 2002
Acronyms and Abbreviations<br />
AAS Adopt-A-Stream Foundation<br />
AES Associated Earth Services<br />
bgs below the ground surface<br />
B-IBI benthic index of biological indicators<br />
BFW bankfull width<br />
BMP best management practice<br />
°C degrees Celsius<br />
cfs cubic feet per second<br />
CIP Capital Improvement Program<br />
CMP corrugated metal pipe<br />
DNMA Dairy Nutrient Management Act<br />
DNR drainage needs report<br />
DO dissolved oxygen<br />
DRI <strong>Drainage</strong> Rehabilitation and Investigation<br />
Ecology Washington Sate Department of Ecology<br />
EDDS Engineering Design and Development Standards<br />
EIA effective impervious area<br />
ESA Endangered Species Act<br />
Extran U.S. EPA SWMM Extended Transport<br />
FEMA Federal Emergency Management Agency<br />
FHWA Federal Highway Administration<br />
GIS geographic information system<br />
gpm gallons per minute<br />
GPP General Policy Plan<br />
HEC-RAS Hydrologic Engineering Center River Analysis System<br />
HPA Hydraulic Project Approval<br />
HSPF Hydrologic Simulation Program–FORTRAN<br />
I Interstate<br />
IQR interquartile range<br />
KCBW King <strong>County</strong> Backwater<br />
LWD large woody debris<br />
mg/L milligrams per liter<br />
Acronyms and Abbreviations<br />
NORTH CREEK ACRONYMS_FINAL.DOC xv DECEMBER 2002
NAVD <strong>North</strong> American Vertical Datum<br />
NHC <strong>North</strong>west Hydraulics Consultants<br />
NOAA National Oceanic and Atmospheric Administration<br />
NMFS National Marine Fisheries Service<br />
NWI National Wetland Inventory<br />
PEM palustrine emergent<br />
PERLND pervious land<br />
PFMC Pacific Fishery Management Council<br />
PFO palustrine forested<br />
PSS palustrine scrub/shrub<br />
POW palustrine open water<br />
RCH-RES reach/reservoir<br />
RM river mile<br />
RU riparian unit<br />
QA/QC quality assurance/quality control<br />
<strong>North</strong> <strong>Creek</strong> <strong>Drainage</strong> <strong>Needs</strong> <strong>Report</strong><br />
SC <strong>Snohomish</strong> <strong>County</strong><br />
SCC <strong>Snohomish</strong> <strong>County</strong> Code<br />
SR state route<br />
SCSWM <strong>Snohomish</strong> <strong>County</strong> Public Works, Surface Water Management Division<br />
SWMM Storm Water Management Model<br />
TIA total impervious area<br />
TMDL total maximum daily load<br />
UGA urban growth area<br />
USACOE United States Army Corps of Engineers<br />
USFS U.S. Forest Service<br />
USGS U.S. Geology Survey<br />
USFWS U.S. Fish and Wildlife Service<br />
WAC Washington Administrative Code<br />
WDFW Washington Department of Fish and Wildlife<br />
WDNR Washington Department of Natural Resources<br />
WFPB Washington Forest Practices Board<br />
WRIA water resource inventory area<br />
WSDOT Washington Department of Transportation<br />
WSEL Water surface elevation<br />
Acronyms and Abbreviations<br />
NORTH CREEK ACRONYMS_FINAL.DOC xvi SEPTEMBER 2002 DRAFT