Elbeyli-2, 3, 4, 6, Gökçe-3, D.Karakuş-8,<br />

K.Akçeli-2, B.Sarısöğüt-1, K.Eskitaş-1,<br />

B.Gökçe-6 and D.Lilan-1 wells were drilled in XII.<br />

Concession Region, completed as “oil wells”.<br />

Umurca-O11, Fidanlık-4, 5, Kavakdere-O1,<br />

Pelit-1, 2 (jointly by <strong>TPAO</strong>-AMITY OIL) wells<br />

were drilled in I. Concession Region in Thrace<br />

Oil Region and completed as “gas wells”. Also,<br />

Vakıflar-O8 well was drilled and completed as<br />

“oil and gas well”.<br />

Joint Domestic Exploration, Development<br />

and Production Activities<br />

Onshore<br />

<strong>TPAO</strong>-TIWAY OIL<br />

Within the framework of <strong>TPAO</strong>-TIWAY OIL<br />

partnership under “The Exploration and<br />

Development Agreement”, drilling and production<br />

activities in Adıyaman Cendere Field have been<br />

carried out throughout the year.<br />

<strong>TPAO</strong>-NVT PERENCO<br />

Within the framework of <strong>TPAO</strong>-NVT PERENCO<br />

“Joint Venture Agreement”, production from<br />

Kastel, Karaali and Yalankoz fields has been<br />

ongoing throughout the year. As planned the<br />

previous year, the drilling of G.Kırtepe-7 and<br />

G.Kırtepe-8 wells were realized under <strong>TPAO</strong>’s<br />

operatorship in <strong>2010</strong>. In the light of geological and<br />

geophysical activities conducted in the region,<br />

the drilling of B.Gercüş-B1 well was completed<br />

under the NVT PERENCO operatorship in<br />

<strong>2010</strong>.<br />

<strong>TPAO</strong>-AMITY OIL<br />

Under the Thrace Basin “Joint Operating<br />

Agreement” with AMITY OIL, natural gas and<br />

condensate production from Göçerler, Adatepe,<br />

D.Adatepe, Velimeşe, B.Velimeşe, Reisdere,<br />

Eskitaşlı and Dikilitaş fields have continued<br />

throughout the year. Drilling of D.Beyciler-H1 well<br />

was realized under <strong>TPAO</strong>’s operatorship in <strong>2010</strong><br />

and gas discoveries realized in Pelit-1 and Pelit-2<br />

wells drilled with the AMITY OIL partnership. In<br />

the scope of <strong>2010</strong> Work Program and Budget, it<br />

was planned to conduct 4D seismic study.<br />

In mid <strong>2010</strong>, the sale of AMITY OIL to<br />

TRANSATLANTIC Petroleum company was<br />

realized.<br />

<strong>TPAO</strong>-TRANSATLANTIC<br />

Within the scope of unconventional studies<br />

to be conducted at the Thrace Basin and<br />

Southeastern Anatolian licences, a Memorandum<br />

of Understanding (MOU) was executed by and<br />

between <strong>TPAO</strong> and TRANSATLANTIC on April<br />

9 th , <strong>2010</strong>.<br />

In the regard of this agreement, re-entry<br />

operations are conducted in Kaynarca-1 well<br />

at first in Thrace Basin and then re-entry and<br />

hydrofrac operations realized in Kepirtepe-1<br />

well.<br />

Offshore<br />

<strong>TPAO</strong>-PETROL OFİSİ E&P-TIWAY<br />

OIL- FOINAVON<br />

Under the ongoing “The Black Sea Joint<br />

Operating Agreement”, natural gas production<br />

from Ayazlı, D. Ayazlı and Akkaya Production<br />

Platforms has continued throughout the year.<br />

The manufacturing of Akçakoca Production<br />

Platform has been completed and it was installed<br />

at its location in summer <strong>2010</strong> and was put into<br />

production in the first quarter of 2011.<br />

The completion and tie-back operations of<br />

Akçakoca-3 and Akçakoca-4 were initiated after<br />

the rig GSP-31 was installed on the platform. The<br />

sale of Stratic Energy Corp. to Foinavon Energy<br />

Inc. was realized and the partnership was then<br />

among <strong>TPAO</strong>-PETROL OFİSİ E&P-TIWAY OIL<br />

and FOINAVON.<br />

<strong>TPAO</strong>-PETROBRAS- EXXONMOBIL<br />

Joint Activities were realized by <strong>TPAO</strong>-<br />

PETROBRAS-EXXONMOBIL under the<br />

Rig Farmout Agreement (RFOA) signed<br />

by and between <strong>TPAO</strong> and PETROBRAS,<br />

after PETROBRAS’ transferring its 50%<br />

share to EXXONMOBIL in January <strong>2010</strong>.<br />

Between February and August <strong>2010</strong>, the<br />

drilling of Sinop-1 well was realized under<br />

the operatorship of PETROBRAS. <strong>TPAO</strong> has<br />

formed a mobile laboratory that would conduct<br />

some paleontological studies for the partnership<br />

in Samsun.<br />

Within the scope of “Joint Operating Agreement”<br />

between <strong>TPAO</strong> and EXXONMOBIL, CSEM<br />

studies were conducted in the first quarter of<br />

<strong>2010</strong>, source controlled “aeromagnetic” data<br />

acquisition studies (CSEM) were carried out in<br />

the first quarter of 2011 in order to better identify<br />

the prospects. The location is determined by<br />

conducting survey studies about the location<br />

of the well that is planned to be drilled in the<br />

operatorship of EXXONMOBIL in April, 2011.<br />

The drilling ship named “Deep Water Champion”<br />

is expected to arrive to the location in the second<br />

quarter of 2011.<br />

20 <strong>TPAO</strong> <strong>2010</strong> <strong>TPAO</strong> <strong>2010</strong> 21