at the maximum level, <strong>TPAO</strong> has continued its<br />
domestic reserve development and production<br />
activities in <strong>2010</strong>. Production problems in heavy<br />
reservoir require special technical applications.<br />
To prevent the decline in production and to<br />
evaluate the current production potential, several<br />
reservoir studies were performed.<br />
Batı Raman Field Enhanced Oil<br />
Recovery Project<br />
Since the carbon dioxide (CO 2) injection start-up<br />
in 1986 in B.Raman, cumulative injection into the<br />
field has reached 9.6 billion m 3 in the scope of<br />
Batı Raman Field Enhanced Oil Project. In order<br />
to sustain this amount of injection, 7.2 billion m 3<br />
CO 2 was produced from Dodan Field. By the end<br />
of <strong>2010</strong>, Batı Raman's recovered cumulative oil<br />
reserves were 103.8 million barrels, 67.9 million<br />
barrels of which is the additional oil coming from<br />
CO 2 injection.<br />
In <strong>2010</strong>, 421.9 million m 3 CO 2 was injected,<br />
286.2 million m 3 of this amount was re-produced<br />
and 262 million m 3 of this produced gas was reinjected<br />
into the reservoir to be re-utilized.<br />
Water injection aimed improving CO 2 sweep<br />
efficiency continued in <strong>2010</strong>, in total 235,758<br />
barrels of water alternating with gas was injected<br />
into 13 different wells. NaOH augmented water<br />
injection was begun from 2 injectors in order<br />
to see the effect of chemicals to increase the<br />
efficiency of Water Alternating Gas (WAG)<br />
application. 77 thousand barrels of chemically<br />
enriched water was injected. In addition to this,<br />
drilling operations of 18 new vertical wells were<br />
completed.<br />
Raman Field Production<br />
Enhancement Project<br />
Raman Field production enhancement project<br />
was started in 1994 and operations to increase oil<br />
production have been continuing periodically by<br />
the end of <strong>2010</strong>. 16.2 million barrels of additional<br />
oil was produced by means of this project. 1<br />
new well was drilled in the field to increase oil<br />
production in <strong>2010</strong> and well number increased<br />
to 241.<br />
As results of pilot polymer gel injection (MARCIT)<br />
done in 7 wells to reduce water-cut values in<br />
2007 that were satisfying, gel injection operations<br />
were done in 57 wells throughout the year.<br />
Approximately 515 thousand barrels of extra oil<br />
production was obtained from these 57 wells.<br />
Gross production rates of 22 wells were<br />
changed in <strong>2010</strong>. 3 abandoned wells were put<br />
into production after gel operation. As a result,<br />
approximately 25 thousand barrels of additional<br />
oil were produced by these operations in <strong>2010</strong>.<br />
Garzan Water Injection Project<br />
Garzan Field, which has 300 million barrels oil in<br />
place, is one of the biggest oil fields in Türkiye.<br />
Within the scheme of Garzan Water Injection<br />
Project, started in 1960 and restarted in 1992<br />
after a long halt since 1983, cumulative injection<br />
through 11 wells reached to 68 million barrels in<br />
Garzan-B field by the end of <strong>2010</strong>, where annual<br />
injection was 1.5 million barrels.<br />
In Garzan-C field, cumulative water injection<br />
through 4 wells reached to 46.7 million barrels<br />
where total annual injection was 700 thousand<br />
barrels.<br />
Within the scope of Garzan Water Injection<br />
Project, 28.7 million barrels of additional oil<br />
in Garzan-B Field and 13.1 million barrels in<br />
Garzan-C Field were produced by the end of<br />
<strong>2010</strong>.<br />
Batı Kozluca Field Water Alternating Gas<br />
Injection (WAG) Project<br />
CO 2/WAG feasibility in Batı Kozluca Field<br />
was investigated through a reservoir study<br />
and promising results led investments for the<br />
application. CO2 injection and water injection<br />
have continued in <strong>2010</strong>.<br />
By the end of <strong>2010</strong>, cumulative gas injection<br />
reached to 5.86 billion scf and cumulative water<br />
injection reached to 800 thousand barrels. The<br />
injection process is still underway. In order to<br />
expand the application of CO2 injection, additional<br />
12 wells were drilled at the B.Kozluca Field.<br />
Domestic Natural Gas Production<br />
In <strong>2010</strong>, <strong>TPAO</strong>’s natural gas production was<br />
260.7 million sm 3 . 94% of the total natural gas<br />
production is from Thrace Region, 5% is from<br />
Batman Region and 1% is from Adıyaman<br />
Region. The oil equivalent of the gas output is<br />
1.5 million barrels. Thus, <strong>TPAO</strong>’s cumulative<br />
hydrocarbon production reached to 14.2 million<br />
barrels by the end of <strong>2010</strong>.<br />
Kuzey Marmara and Değirmenköy Fields<br />
Underground Natural Gas Storage Facilities<br />
Capacity Enhancemend Project<br />
In Kuzey Marmara and Değirmenköy Fields<br />
Underground Natural Gas Storage Project,<br />
commercial activity was started on April 13 th ,<br />
2007. Injection and withdrawal operations have<br />
been continuing.<br />
Gas demand of our country tends to increase,<br />
therefore new storage facilities are urgently<br />
required.<br />
For this purpose, <strong>TPAO</strong> is planning to increase<br />
the daily withdrawal capacity of existing facilities<br />
up to 50 million sm 3 /day and storage capacity to<br />
approximately 3 billion sm 3 within 3 phases by<br />
the end of 2016.<br />