Telkom SA Limited, Deutsche Bank Technology workshop,22
Telkom SA Limited, Deutsche Bank Technology workshop,22
Telkom SA Limited, Deutsche Bank Technology workshop,22
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Network modernisation programme<br />
16<br />
1997/1998<br />
1998/1999<br />
1999/2000<br />
2000/2001<br />
2001/2002<br />
• Replaced <strong>22</strong>8 353 non-digital lines<br />
• 71 000 km of fibre laid<br />
• Replaced 518 105 non-digital lines<br />
• ATM deployed<br />
• NNOC started<br />
• Afrolinque (<strong>SA</strong>T-3/WASC/<strong>SA</strong>FE) project launched<br />
• Replaced 350 440 non-digital lines<br />
• NNOC open<br />
• DWDM deployed<br />
• xDSL deployed<br />
• IP clearing house<br />
• IP network (VOIP)<br />
• Afrolinque (<strong>SA</strong>T-3/WASC/<strong>SA</strong>FE) projects completed