Appendix E-8 Consultation Record Joint Resource ... - Duke Energy
Appendix E-8 Consultation Record Joint Resource ... - Duke Energy
Appendix E-8 Consultation Record Joint Resource ... - Duke Energy
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Location:<br />
10:00 AM<br />
11:45 AM<br />
12:00 N<br />
12:45 PM<br />
3:00 PM<br />
Keowee-Toxaway Hydro Relicensing<br />
(FERC Project No 2503)<br />
JOINT MEETING OF THE RESOURCE COMMITTEES<br />
Wednesday, October 14, 2009<br />
AGENDA<br />
<strong>Duke</strong> <strong>Energy</strong> Wenwood Operation Center<br />
425 Fairforest Way<br />
Greenville, SC 29607<br />
Introductions, Agenda Review, Announcements, and Safety Brief<br />
Overview of FERC's Integrated Licensing Process (ILP), Schedule,<br />
Study Criteria and Evaluation of Study Plans<br />
Early ILP Milestones - Preliminary Application Document (PAD) and<br />
Study Plan<br />
• Technical Data Library<br />
• Study Plan Template/Format<br />
• Baseline Study Plans and Study Team Coordinators<br />
Stakeholder Process<br />
• Stakeholder Group (Roles, Membership, and Outcomes)<br />
• <strong>Resource</strong> Committees (Roles, Membership, Outcomes and<br />
Relation to Stakeholder Group)<br />
• Study Teams (Roles, Membership, Outcomes, and Relation to<br />
<strong>Resource</strong> Committees)<br />
• Website Overview<br />
Wrap Up before Breakouts<br />
Lunch<br />
• Relicensing Schedule<br />
• Topics and Scheduling for Future Meetings<br />
• Breakout Sessions Tasks<br />
<strong>Resource</strong> Committee Breakouts<br />
• Review Technical Data Library and identify missing items.<br />
• Review concepts and reasoning for selecting the baseline<br />
studies<br />
• Discuss next steps and potential other studies of interest to the<br />
<strong>Resource</strong> Committee members.<br />
Adjourn from Breakout Groups<br />
1