Brag Spring 2022
Celebrate our Spring graduates and so much more!
Celebrate our Spring graduates and so much more!
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
In the fall of 2018, we submitted a<br />
formal proposal to the Campion<br />
Board of Regents and the University<br />
of Regina Board about acquiring<br />
the podia space from the University.<br />
The University of Regina Faculty<br />
Association (URFA) was (and still is)<br />
in the east space while the faculty<br />
of Graduate Studies moved out of<br />
the west space and into new offices<br />
elsewhere on campus.<br />
As part of the proposal, Campion<br />
College would renovate the west<br />
podium space to house the Impact<br />
Lab, run by Campion faculty Dr.<br />
Katherine Robinson and Dr. Christian<br />
Riegel. Campion also used this<br />
new lease to include some of the<br />
renovations to our air handling units<br />
and the maintenance of our 1960s<br />
building.<br />
Ultimately, the proposal was approved<br />
and work to acquire the east and west<br />
wings began. In the end, Campion<br />
would acquire the podia, including<br />
its various deficiencies, and fully<br />
integrate the spaces into the Campion<br />
College building. This included<br />
connection on both sides to our new<br />
air handling unit and fit-up of the west<br />
wing to meet the needs of the Impact<br />
Lab.<br />
On April 30, <strong>2022</strong>, after almost six<br />
years of negotiations, the details were<br />
worked out to help ensure Campion’s<br />
place on campus for many more years<br />
to come.<br />
The new Impact Lab in<br />
the West podia space<br />
Photo: Jose Argerami<br />
Tunnel dug in Summer<br />
2021 to access basement<br />
Photo: Jose Argerami<br />
Trench to connect to<br />
emergency power<br />
Photo: James Gustafson<br />
21