Contract CC-34 (UG-5) : Design and Construction of Tunnels from Ch. (-)785.912 near Janakpuri West underground<br />

station to Palam Underground <strong>Metro</strong> station (excluding) (Ch. (+)4591.630) by Shield TBM; Janakpuri West, Dabri Mor<br />

and Dashrath Puri underground metro Stations by Cut & Cover Method and works in connection with interchange<br />

facilities between existing elevated <strong>Metro</strong> station and proposed underground metro station at Janakpuri West on<br />

Janakpuri West – Kalindi Kunj Corridor under <strong>Delhi</strong> MRTS Project of Phase-III.<br />

WORK EXPERIENCE<br />

Annexure 1<br />

Applicant’s legal name ………………………… Date……………………………….<br />

Group Member’s legal name………………………… Page ……….. of ……….. pages<br />

ANNEXURE-1<br />

For works of construction of Tunnel (which may include station along with Tunnel) as per clause no. 1.1.4.2 (A) or<br />

more at the price level on last day of month previous to the month the tender submitted (considering escalation<br />

as per Clause 1.1.4.2 of Notes Bullet no.3)<br />

Similar Contract Number ______<br />

of _______ required<br />

Contract Identification<br />

Award date<br />

Completion date<br />

Employer‟s Name<br />

Employer‟s Address:<br />

Telephone / Fax number:<br />

E Mail<br />

Role in Contract<br />

(Individual/JV-Consortium<br />

member)<br />

Completion Cost<br />

If JV member specify percentage<br />

participation in contract &<br />

amount (Please refer Note-1)<br />

Length of Tunnel (which may<br />

include station along with<br />

tunnel)<br />

Specific Construction Experience<br />

Information<br />

Individual JV Member<br />

Currency (as stated in Clients<br />

Certificate)<br />

% participation<br />

In equivalent INR at 31.10.2012<br />

price level<br />

In equivalent INR at 31.10.2012<br />

price level<br />

In case of JV/Consortium, actual<br />

length executed by the Applicant<br />

(duly substantiated with Client<br />

Certificate)<br />

NOTE: 1. Only the value of contract as executed by the applicant/member in his own name should<br />

be indicated. Where a work is undertaken by a group, only that portion of the contract<br />

which is undertaken by the concerned applicant/member should be indicated and the<br />

remaining done by the other members of the group be excluded. This is to be<br />

substantiated with documentary evidence.<br />

2. Separate sheet for each work along with Clients Certificate to be submitted.<br />

DMRC/CC-34(UG-5)/Volume–1/<strong>NIT</strong> Page 11