Contract CC-34 (UG-5) : Design and Construction of Tunnels from Ch. (-)785.912 near Janakpuri West underground<br />

station to Palam Underground <strong>Metro</strong> station (excluding) (Ch. (+)4591.630) by Shield TBM; Janakpuri West, Dabri Mor<br />

and Dashrath Puri underground metro Stations by Cut & Cover Method and works in connection with interchange<br />

facilities between existing elevated <strong>Metro</strong> station and proposed underground metro station at Janakpuri West on<br />

Janakpuri West – Kalindi Kunj Corridor under <strong>Delhi</strong> MRTS Project of Phase-III.<br />

ODA Loan by INTERNATIONAL CO-OPERATIVE AGENCY will be subject, in all respects, to<br />

the terms and conditions of the Loan Agreement, including the disbursement procedures and<br />

the „Guidelines for Procurement under JICA ODA Loans‟. No party other than DMRC shall<br />

derive any rights from the Loan Agreement or have any claim to loan proceeds. The above<br />

Loan Agreement will cover only a part of the project cost. The remaining portion shall be<br />

financed through equity participation by the Government of India and Government of National<br />

Capital Territory of <strong>Delhi</strong> and other appropriate means.<br />

1.1.4 QUALIFICATION CRITERIA :<br />

1.1.4.1 Eligible Applicants : Please refer Clause A3 of ITT<br />

1.1.4.2 Minimum Eligibility Criteria :<br />

A. Work Experience: The tenderers will be qualified only if they have completed work(s)<br />

during last Seven years ending 31.10.2012 as given below:<br />

(i) At least one single work of value ` 825.00 Crores or more which shall include minimum of<br />

3.0 km of Tunnel length by shield TBM (In case of twin tunnel each tunnel shall be counted as<br />

a separate Tunnel for calculation of length of tunnel) with finished internal dia of more than 5.0<br />

mtr (including completed portion of ongoing works) along with or without underground station<br />

using cut & cover method in urban environment. In case this work does not include any<br />

underground station by cut & cover or the station included in the work is of less than 4500<br />

sqm plan area in urban environment, the tenderer must have executed another work of<br />

minimum one underground station of plan area not less than 4500 sqm in urban environment.<br />

In case of JV/Consortium the work of tunnel & station may be by different partners also.<br />

If the above work of value ` 825.00 Crores has been done by the foreign partner of JV and the<br />

work was done in the country of the foreign partner then in addition to this, the foreign partner<br />

must have done works equal to value ` 412.00 Crores outside the country of the foreign<br />

partner.<br />

OR<br />

(ii) Two different works each of value ` 515.00 Crores or more. Both works together shall<br />

include minimum of 3.0 km of Tunnel length by shield TBM (In case of twin tunnel each tunnel<br />

shall be counted as a separate Tunnel for calculation of length of tunnel) with finished internal<br />

dia of more than 5.0 mtr (including completed portion of ongoing works) along with or without<br />

underground station using cut & cover method in urban environment. In case this work does<br />

not include any underground station by cut & cover or the station included in the work is of<br />

less than 4500 sqm plan area in urban environment, the tenderer must have executed another<br />

work of minimum one underground station of plan area not less than 4500 sqm in urban<br />

environment. In case of JV/Consortium the work of tunnel & station may be by different<br />

partners also.<br />

If both the works of value ` 515.00 Crores have been done by the foreign partner of the JV,<br />

then either at least one of these two works should have been done outside the country of the<br />

foreign partner and if not, then in addition to this, the foreign partner must have done works<br />

equal to value ` 412.00 Crores outside the country of the foreign partner.<br />

DMRC/CC-34(UG-5)/Volume–1/<strong>NIT</strong> Page 5