DISTRICT OVERVIEW<br />

SMART SCALE, continued<br />

Town Of <strong>Culpeper</strong><br />

Orange Road/Fredericksburg Road Roundabout<br />

The project converts the Orange Road/Fredericksburg<br />

Road signalized intersection to a single-lane roundabout.<br />

The project includes adding pedestrian crosswalks and<br />

sidewalks on each approaching roadway.<br />

Estimated cost: $12,636,129<br />

Old Brandy Road Sidewalk Extension<br />

The Old Brandy Road sidewalk extension project proposes<br />

approximately 2,800 feet of five-foot-wide sidewalk along<br />

the north side of Old Brandy Road from the existing<br />

sidewalk infrastructure near Wine Street Memorial Park<br />

to James Madison Highway and adjacent commercial<br />

development.<br />

Estimated cost: $8,292,885<br />

Orange Road Sidewalk Extension<br />

This project proposes construction of approximately 2,500<br />

linear feet of five-foot-wide sidewalk along the east side<br />

of Orange Road from Standpipe Road and just south of<br />

the Orange Road/Fredericksburg Road intersection.<br />

Town Of Warrenton<br />

Business U.S. 17/Broadview Avenue/Shopping Center<br />

Intersection Improvement<br />

This project would convert the existing intersection into<br />

a peanut-shaped hybrid roundabout and includes bicycle/<br />

pedestrian facilities and crosswalks.<br />

Estimated cost: $14,890,760<br />

West Lee Street/U.S. 17 Business/Winchester Street<br />

Intersection Improvement<br />

This project would convert an existing intersection to<br />

a single/double-lane hybrid roundabout and includes a<br />

shared-use path, sidewalks, crosswalks and bike lanes.<br />

Estimated cost: $15,128,120<br />

Lee Highway/Blackwell Road Safety Improvement<br />

The project would convert an existing intersection to a<br />

single/double-lane hybrid roundabout and includes a<br />

shared-use path, sidewalks, crosswalks and replacement<br />

of the box culvert on Blackwell Road.<br />

Estimated cost: $14,066,640<br />

Estimated cost: $8,592,462<br />

SMART SCALE Round 5<br />

38 <strong>Culpeper</strong> <strong>District</strong> project applications<br />

$541,688,348 total value<br />

TRANSPORTATION UPDATE // PUBLISHED NOVEMBER 30, <strong>2022</strong> 15