01.02.2023 Views

Correa English Revista 75

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

23

professionals currently

work at the plant

located in Villalonquéjar

1.800

are the projects

developed in its more

than twenty years of work

22%

of the invoicing of the

last financial year of GNC

Electrónica comes from

companies outside the

Correa Group

Fast Charging Points at the Group’s facilities.

that they only use the latest

generation materials and that

all the elements installed in

the machines are perfectly

documented – they are

studying the implementation

of QR codes inside the parts –

to further facilitate equipment

traceability and after-sales

service. “We are good at what

we do”, they acknowledge

with some pride, and it is that

from GNC Electrónica, which

provides one hundred percent

service to Correa machines,

they also work for other sectors

such as food, rail, aeronautics,

renewable energies and capital

goods

The particularity they

highlight, is that their projects

always have personalised

designs according to the needs

and demands of each client.

With care. They face the future

with the uncertainty of the

moment, with their SME hearts

and international soul.

Ecological

‘brand’

chargers

for electric

vehicles

The Group’s

strategy,

shared by

its industrial

subsidiaries,

is to always

move forward

in an innovative

way, not only

in processes –

which already

exist – but also

in products.

This is how a

4.0 technology

project was born

in 2019 within

GNC Electrónica,

developed

together with

the University

of Burgos and

the Miranda

Technology

Center. These

are known as

Fast Charging

Points for

electric vehicles,

but with an

added value

that is the truly

differentiating

element. They

have an energy

storage system

that reduces

electricity

consumption and

achieves faster

charging and a

more efficient

use of energy

resources.

Several points

are already in

operation at the

Group’s facilities

and at a winery

in the Ribera del

Duero.

#31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!