To,

Mr. Rajkumar parmar

Krishna nagar gole ka mandir Gwalior

Contect no.- 898258584952

Kind Attention: --------------

Dear Sir,

A&D Solar (MNRE/CP/GCRT/C/3926, MPUVN/GCRT/MM/01) deals in clean and

sustainable energy. We have helped many Institutes, Household and Industries to

harness solar energy to power their premises with Solar Panel Rooftop Electric

Solution etc.

As the cost per unit of energy from government power grids continues to rise each

year, many people are seeking long-term alternatives to reduce their electricity bills.

Solar energy is a great alternative compared to the electric grid, and saves

consumer substantially in the long run while also benefiting the environment.

Kindly go through the attached proposal which includes the details regarding Solar

power plant benefits and feasibility report.

We will be pleased to answer any of your queries in this regards.

We wish to see your premises going solar with A&D Solar.

Sincerely,

A&D Solar

Gwalior


Project Proposal for Solar Grid

Tied Rooftop System for

Mr. Rajkumar parmar 07 KW, Krishna nagar Gwalior (M.P.)


Introduction: What is solar power and why to use solar energy?

The technology which converts sunlight into electricity

Most abundant renewable (clean and green) source of energy

– India is blessed with more than 300 days of abundant sunlight which translate into

5000 Petawatt-hours per year

– Can be installed anywhere at Hospitals, residential or commercial building

Safeguard consumer from all future electricity tariff hikes

Tax benefit for corporate

Longevity - solar panels can last for 25 years

Low maintenance - solar panels require very little upkeep

Excessive power generated can be sold back to local electricity provider

About A&D Solar

A&D Sales is a pre-eminent company that has been providing services in agricultural

and electrical field in different regions of Madhya Pradesh and Rajasthan,since 2015.

A&D Solar (Ministry of New and Renewable Energy channel partner MNRE/CP/GCRT/C/

3926, MP Urja Vikas Nigam/GCRT/MM/01)is providing access to clean and affordable electricity,

also it has provided rooftop solution to its vide range of clients including Schools, Hospitals and

Commercial setups.

Our vision is to create a sustainable ecosystem by providing clean energy and efficient

Solutions for all.

Certificates

• MPPKVVCL Empanelled MP Urja Vikas Emp. MNRE Channel Partner MSME. Reg.

A&D Solar

All Rights Reserved


Grid-tied Solar Rooftop System- How the system works

This system is connected to the electrical grid, and allows residents/users of buildings to use

solar energy as well as power from the grid. In this system, solar PV panels produce DC current

which is fed into solar inverter that converts it to usable 230V 50Hz AC.

When the panels generate adequate energy, the solar inverter uses no power from the grid

If the power generated by panels is not sufficient, inverter compensates by drawing power

from the grid and at night it will completely switch to main grid

If the power is in excess, it can be fed to the grid under net metering.

Battery is not used for this system as grid used as a backup.

Solar rooftop system shut down in absence of grid

Copyright A&D Solar[Type text]


Advantages for rooftop solar system owners

a) Safeguard consumer from all future electricity tariff hikes

· Tax benefit and subsidy

· Companies can claim depreciation up to 25% of solar rooftop system cost

b) Very minimal maintenance, as there are no moving parts

c) Life of solar panels is 25 to 30 years

d) Green and clean energy which reduces carbon emission and minimizes the effects of global

warming

Copyright A&D Solar[Type text]


Our proposal - 1

Below is our specification and quotation for 05 KW Grid Tied Solar Rooftop System to be

installed under net metering. In net metering, excess power (when consumption is lower

than 05 KW) can be supplied back to the grid.

Item

Capacity

(KWp)

Rate / KWp

(INR)

Total Price

(INR)

Design, Manufacture, supply of 07 KWp

grid connected solar PV System

complete with solar module etc, & other

accessories and connecting cables 07 59 4,13,000.00

GST 12% 49,560.00

Subsidy Aproxe

07

72,940.00

Total 4,62,560.00

Note: * Cost is inclusive of Installation and Transportation. ** Company will take care of complete process of

applying and installation of net meter. This is an estimated cost and might vary after technical survey and gst

clarification on items.

Note-Net Metering Registration, Meter Testing, Agreement Extra.

Note- Subsidy only for Domistic On Graid solar projects.

Generation from 07KWp On Grid Solar Power Plant in 25 years

(Considered 330 Days/year)

Copyright A&D Solar[Type text]


COST ANALYSIS SHEET OF ON GRID SYSTEM

On Grid

CURRENT SCENERIO

System Units

Per unit cost of Grid Electricity 8 Rupees

Per

9240

Total Energy generated by ,per year ,units

year

TOTAL SAVING per Year 73,920/- Rupees

PROJECT COST 4,31,200/- Rupees

PAY BACK period will be around 5.83 Year

Copyright A&D Solar[Type text]


Bill of Material - 1

S.N

o.

Item Specification Make

1 Solar PV

Modules

MonoCrystallin Half Cut PV Modules with

Efficiency >21.65% - 21.95% with approval

as per IEC 61215 and IEC 61730.

Warranty: 25 years (power warranty)

Satvik Solar dcr 540

2 M o d u l e

M o u n t i n g

Structures

Hot Dip/ Pre-Galvanized/ Aluminum/any

suitable material Non-Corrosive with SS nuts

and bolts. Designed to withstand wind speed

and seismic factors of the site.

IS Standard. (Hot dip with 80

Micron Coating)

3 J u n c t i o n

Boxes

Dust, vermin and water proof

IS Standard.

4 Inverters Three-phase string inverters ideal for rooftop

systems complying with all requirements for

IP 65 protection – their housing provides

reliable protection from dust and water,

including high pressure washing.

With Fast MPP tracking and a wide input

voltage range to ensure the high levels of

efficiency Even at low irradiation, to achieve

an efficiency of up to 98.2%. With integrated

data-logger to send all important operating

data through Internet portal.

Warranty: 8 years.

Hevells

5 Distribution B o x

e s , cables and

accessories

An ACDB shall be provided in between PCU

and Load/grid interface of suitable rating of

connection and disconnection of PCU from

load Class 1 Energy Meter for Solar power

monitoring.

All the cables shall be supplied conforming

to IS standard as per requirement

Reputed make ( Polycab)

Polycab type-1 in DC cable

Copyright A&D Solar[Type text]


Terms and Conditions

Payment term: 50% advance with order placement

45% after solar modules arrive at site

05% on successful testing of system

Installation: Within 2-3 months of order confirmation

In the event if order, it should be placed on EPC contractor by us and we shall be providing

PMC services

Cleaning of panels will be in customer scope to maintain optimum generation

Detail Scope of Work

The scope of work for the installer include study of the rooftop of buildings, complete design,

engineering, manufacture, supply, storage, civil work, erection, testing & commissioning of the grid

connected rooftop solar PV project as per the norms of the CEA and local DISCOM.

Under Scope of Work installer will do following activities:

1) Solar Plant Engineering Design.

2) Detailed Planning & smooth execution of the Project

3) Supply of the PV Modules, Mounting System & Solar PCU with necessary accessories On – site

installation

4) System Installation and commissioning including lightening arrester & earthling

5) Basic Training on working and upkeep to Operator & maintenance staff

6) System analysis, technical reports & recommendation

7) NOC / Permission from local DISCOM/ Nodal Agencies for connecting SPV power plant to grid

8) Application for Net Metering installation and commissioning

#AC Cable and earthling strip length from inverters to the Solar LT Panel placed near to the

inverter at appropriate location will be in scope installer however AC cable/ Earthling strip from

Solar LT Panel to Client LT Panel more than 10 meters will be in scope of client.

Copyright A&D Solar[Type text]


Assumptions

1) All approvals, NOCs and permissions, installer will support to get, but the charges for

application or any other will be extra.

2) Any other related work or arrangement like Material Storage location, way for working at

roof required for the execution of the installation of the project.

3) Electricity at roof for working.

We look forward working with you to install a clean and green energy solution for power

requirement for your establishment.

Operation and Maintenance (not cleaning of panels) of complete system is for One year

(Performance warranty of panel is for 25 years)

Warranty can be claimed against any manufacturing defect for all the components. No

warranty can be claimed on broken panel after installation.

Any other terms and conditions not mentioned over here shall be as per mutual agreement

All approvals, NOCs and permission Installer will support to get this but the charges for application

charges or any other will be extra

Copyright A&D Solar[Type text]


Clientele

MITS College, Gwalior-100KW

ITI College, Datia-45kw

Gov Girls College, Datia-25kw.

RKVM School, Thatipur, Gwalior-10kw

Aatm Jyoti Schoo,l Gole Ka Mandir, Gwalior-10KW

Emmenual School, Morena-17Kw

Dr.Bhagwat Sahai College, Gwalior-30Kw

Govt. PG Girls College Morar, Gwalior-30KW

St. Mary’s School,Morena-2Kw

The Regional Public School, Gole Ka Mandir, Gwalior-5kw

M/S Marwad Motars, Dholpur-15KW

M/s Bhargav Vatika, Dholpur-15KW

Mungawali Mandir, Jora Road, Morena-5Kw

Rtd.Judge-Shyam Bihari Bhargav, Harishankar Puram-4Kw

Rtd.Judge-Shree Ashok Sharma, Mishra Colony Gwalioir-5KW

M/S Ganga Public School Miorena-10Kw

Dr.Vishwanath Pratap Singh Tomar, Hargovind Mishra Colony, Lashkar -5KW

CA-Abhay Dav, Jiwaji Ganj, Lashkar, Gwalior-5Kw

Dpty.Com.Jagdish Arora, Nagar Nigam, Gwalior -10Kw

Advocate Mr.Prashant Sharma, Gaytri Nagar, Gwalior-7Kw

M/S Keshla Beauty Parlour, Morena-10Kw

M/S Radha Rani Sadi, Morena-5Kw

Copyright A&D Solar[Type text]


Govt Medical College, Datia-380kw

Govt Medical College, Shivpuri-180kw

Vidya Bhavan Public School, Gwalior-30kw

Shanta Nursing Home, Gwalior-25 kw

CONTACT

A&D Marketing Company

Head Office Address:-Near Bal Bhavan School, Birla Nagar

,Gwalior-474004 Contact No. 0751-4002112, 9425753857,

7000837874

Email Id:- aanddsolar@gmail.com

Website:- www.aandsolar.org

A&D Marketing Company

Bank-PANJAB&SIND BANK, A/O NO.02631600000057,

IFSC CODE.PSIB000023 BRANCH-FORT ROAD GWALIOR

Copyright A&D Solar[Type text]

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!