Eric Lee Extended Portfolio
Extended Portfolio of Architectural Design Works by Eric Lee
Extended Portfolio of Architectural Design Works by Eric Lee
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ERIC LEE
EXTENDED PORTFOLIO
LEED AP BD+C, WELL AP & ASSOC. AIA
Cover & Summary Pages
Works at Kohn Pedersen Fox Associates
Works at Perkins & Will, FXCollaborative & OMA (Intenrships)
Works at Skidmore Owing & Merrills and Pei Cobb Freed & Partners
Works at Robert A.M. Stern Architects & Beyer Blinder Belle Architects
Academic & Personal Works
1 - 3
4 - 39
40 - 53
54 - 79
80 - 101
102 - 117
Contact Information 118
15 Wellesley Street
& 20-26 Maitland Street
(Page 4-11)
30 Bay Street Haudu Genesis Center Hyatt Hotel & Residence 349 West Georgia Street Dreamworks Animation
(Page 12-13) (Page 14-15) (Page 16-17) (Page 18-21)
Headquarters
(Page 22-23)
Hyundai AMCO Headquarters
Supertall Tower
(Page 24-31)
Pier 6 - Office Interior
(Page 32)
MGM Cotai Hotel
(Page 33-37)
280 Park Avenue - Competition
(Page 38-39)
Smart City Headquarters
(Page 40)
South Korea Government
Masterplan - Competition
(Page 41)
School of Business -
University of Albany
(Page 42)
415-425 Madison Avenue
Zoning Studies
(Page 43)
4 Times Square
Storefront Renovation
(Page 44-45)
285 West 11th Street
(Page 46-47)
Phoenico-Persian Quarter
Archive Museum
(Page 48-49)
Rijnstraat 8 (VROM) -
Competition
(Page 50-52)
Exhibition Hall
(Page 53)
Guiyang Cultural Plaza
Supertall Tower
(Page 54-59)
304 Hudson Street
RFP
(Page 60-63)
Tivoli Guard
Ballet School
(Page 64-65)
Tivoli Hjonet
(Page 66-71)
Center for Precision Dental
Medicine at Columbia University
(Page 72-79)
The Gayley at Wilshire
555 West 22nd Street
Residential Tower
Residential Tower
(Page 80-85) (Page 86)
828-850 Madison Avenue
High-End Retail Landmark
Exteterior
(Page 87-88)
828-850 Madison Avenue
High-End Retail Landmark
Interior
(Page 89)
Grand Central Terminal
MTA Addition
(Page 90-91)
Metropolitan Museum of Art
Security Design
(Page 92)
Maritime Aquarium and
Theater at Norwalk
(Page 93)
692-694 Broadway
Exterior Retail Entrance
(Page 94)
26 West 17th Street
Retail Entrance Alteration
(Page 95)
111 Fifth Avenue
Retail Accessibility
Imporvement
(Page 95)
689-691 Fifth Avenue
Retail Storefront
(Page 96)
680 Madison Avneue
Retail Awning Alteration
(Page 97)
Pattison Place
Office - Interior
(Page 98)
2551 Broadway
Residential Tower
(Page 99)
14 Lecount Place
Residential Tower
(Page 100)
Feasibility Studies
Residential & Mixed-Use
(Page 101)
268-270 College Street
(Page 102-107)
Podium Exterior Envelope
Studies
(Page 108)
Tower Form, Massing
& Envelope Studies
(Page 109)
Elevator Lobby Designs
(Page 110)
Exterior Envelope
Facade Designs
(Page 111)
Commercial Interior Lobby
(Page 112-115)
Retail Display Table
(Page 116)
Residential Layout Mark-Up
(Page 117)
KPF, NEW YORK OFFICE
15 WELLESLEY ST
TORONTO, CANADA
KPF, NEW YORK OFFICE
15 WELLESLEY ST
TORONTO, CANADA
KPF, NEW YORK OFFICE
15 WELLESLEY ST
TORONTO, CANADA
KPF, NEW YORK OFFICE
15 WELLSELY ST
TORONTO, CANADA
KPF, NEW YORK OFFICE
15 WELLESLEY ST
TORONTO, CANADA
KPF, NEW YORK OFFICE
15 WELLESLEY ST
TORONTO, CANADA
KPF, NEW YORK OFFICE
15 WELLSELY ST
TORONTO, CANADA
KPF, NEW YORK OFFICE
15 WELLESLEY ST
TORONTO, CANADA
KPF, NEW YORK OFFICE
30 BAY ST
TORONTO, CANADA
KPF, NEW YORK OFFICE
30 BAY ST
TORONTO, CANADA
Material Palette
Proposed Atrium Lobby Entrance Section - Folding Screen Wall Option
KPF, NEW YORK OFFICE
HAUDU GENESIS CENTER
BEIJING, CHINA
KPF, NEW YORK OFFICE
HYATT HOTEL & RESIDENCE
SANYA, CHINA
KPF, NEW YORK OFFICE
HYATT HOTEL & RESIDENCE
SANYA, CHINA
KPF, NEW YORK OFFICE
HYATT HOTEL & RESIDENCE
SANYA, CHINA
KPF, NEW YORK OFFICE
349 WEST GEORGIA STREET
VANCOUVER, CANADA
KPF, NEW YORK OFFICE
349 WEST GEORGIA STREET
VANCOUVER, CANADA
KPF, NEW YORK OFFICE
349 WEST GEORGIA STREET
VANCOUVER, CANADA
KPF, NEW YORK OFFICE
349 WEST GEORGIA STREET
VANCOUVER, CANADA
DreamCenter - DreamWorks Animation Headquarters
KPF, NEW YORK OFFICE
SHANGHAI, CHINA
DreamCenter - DreamWorks Animation Headquarters
KPF, NEW YORK OFFICE
SHANGHAI, CHINA
OPTION 1
OPTION 2
OPTION 3
OPTION 4
VIEW OF THE TOWER WITH ELEVATOR DIAGRAMS
PV FIN OPTION STUDIES
KPF, NEW YORK OFFICE
HYUNDAI AMCO TOWER
SEOUL, KOREA
PV INTEGRATED FIN WITH MINIMIZED SUPPORT SYSTEM TO MAXIMIZE VIEW
PV INTEGRATED FIN ANGLED TO MAXIMIZE EFFICIENCY OF SHADING
PV INTEGRATED SCREEN MODULES OPTION
3
-
2
-
STACK JT.
℄ JOINT
℄
℄
STACK JT.
℄ JOINT
℄
℄
MT-1
GT-1A
5
A-3805
MT-4
℄ JOINT
℄
℄
150
℄ JOINT
℄
℄
PV INTEGRATED FIN ANGLED TO MAXIMIZE EFFICIENCY OF SHADING
4
-
MT-1
GT-1
3
-
150
1750
725 725
GT-2
MT-4A
MT-4A
STACK JT.
℄ JOINT
℄
℄
STACK JT.
℄ JOINT
℄
℄
1
-
MT-4
MT-3
℄ JOINT
℄
℄
℄ JOINT
℄
℄
PV INTEGRATED FIN WITH MINIMIZED SUPPORT SYSTEM TO MAXIMIZE VIEW
5
TYPICAL ELEVATION
Scale: 1:25
4
TYPICAL ELEVATION
Scale: 1:25
1
A-3805
IGB-1
IGB-1
BELOW
2
A-3805
1
A-3805
LINE OF
SPANDREL BEAM
BELOW
MT-1
775
FOG
125
250 800
B
775
FOG
125
1000
ROD
E
50
50
600
600
250
PV INTEGRATED SCREEN MODULES OPTION
1500 1500
1500
1500
1500
1500
TYP
TYP
TYP
TYP
3
-
5
-
GT-1
4
MT-4A
MT-4
TYPICAL PLAN @ VISION
Scale: 1:25
2
-
L-001
MT-3
1500 1500
1500
1500
1500
1500
TYP
TYP
TYP
TYP
4
2
-
GT-2
4
-
3
MT-4
MT-4A
TYPICAL PLAN
Scale: 1:25
1
-
P
KPF, NEW YORK OFFICE
HYUNDAI AMCO TOWER
SEOUL, KOREA
P
VIEW OF INTERIOR ATRIUM WITH TWIN ELEVATORS
KPF, NEW YORK OFFICE
HYUNDAI AMCO TOWER
SEOUL, KOREA
P
P
4
2
1
E
E
4
A-3805
4
A-3805
3
-
5
A-3805
150
1750
725 725
150
STACK JT.
℄ JOINT
MT-1
MT-4
℄ JOINT
GT-2
MT-4A
STACK JT.
℄ JOINT
MT-3
℄ JOINT
6450
1 UNIT - TYP
2150 2150
2150
2150
2150
1550 600 1550
600
STACK JT.
℄ MULL.
3
A-3805
℄ MULL.
4
-
3
A-3801
SIM
STACK JT.
℄ MULL.
2
A-3801
SIM
℄ MULL.
6450
1 UNIT - TYP
2150 2150
2150
2150
2150
1550 600
1550
600
STACK JT.
℄ MULL.
3
A-3805
℄ MULL.
4
-
STACK JT.
℄ MULL.
3
A-3801
SIM
℄ MULL.
STAINLESS STEEL
HANGER ROD
LINE OF
SPANDREL BEAM
BELOW
1000
ROD
50
600
600 3700
250
775
FOG
125
4300 4300
4300
FLOOR LEVEL
T.O.F.F.
FLOOR LEVEL
T.O.F.F.
4
TYPICAL ELEVATION
Scale: 1:25
2
SECTION @ X-BRACE
Scale: 1:25
1
TYPICAL SECTION
Scale: 1:25
2
A-3805
1
A-3805
E
L-001
MT-3
GT-2
MT-4
MT-4A
1500 1500
1500
1500
1500
1500
TYP
TYP
TYP
TYP
4
2
-
4
-
1
-
3
TYPICAL PLAN
Scale: 1:25
14 A
A
3
1
-
-
4
-
2
-
150
1750
725 725
150
STACK JT.
℄ JOINT
℄ JOINT
MT-1
GT-1
STACK JT.
℄ JOINT
℄ JOINT
4300
1 UNIT - TYP
2150 2150
2150
2150
2150
1550 600
1550 600
6
A-3801
STACK JT.
℄ MULL.
5
-
5
A-3801
℄ MULL.
3
A-3801
STACK JT.
℄ MULL.
SMOKE PUTTY &
FIRE SAFING - TYP.
2
A-3801
℄ MULL.
700
TYP
VARIES
4300
1 UNIT - TYP
2150 2150
2150
2150
2150
1550
600
1550 600
6
A-3801
STACK JT.
℄ MULL.
5
-
5
A-3801
℄ MULL.
STACK JT.
℄ MULL.
SMOKE PUTTY &
FIRE SAFING - TYP.
3
A-3801
℄ MULL.
700
TYP
1250 350
2700
1600
4300 4300
4300
FLOOR LEVEL
T.O.F.F.
FLOOR LEVEL
T.O.F.F.
5
TYPICAL ELEVATION
Scale: 1:25
3
SECTION @ X-BRACE
Scale: 1:25
1
TYPICAL SECTION
Scale: 1:25
PF, NEW YORK OFFICE
HYUNDAI AMCO TOWER
SEOUL, KOREA
OPTION 3 - 3 X 125 MM / 717MM SPACING
OPTION 2 - 5 X 100 MM / 430MM SPACING
SOUTH EXTIEROR VIEW WITH PV SCREEN OPTION
OPTION 1 - 7 X 75 MM / 307MM SPACING
KPF, NEW YORK OFFICE
HYUNDAI AMCO TOWER
SEOUL, KOREA
INTERIOR VIEW FROM CIRCULATION SPACE - LOOKING TOWARD PV INTEGRATED SCREEN SOUTH FACADE
KPF, NEW YORK OFFICE
HYUNDAI AMCO TOWER
SEOUL, KOREA
BRIDGE OPTION STUDIES FOR FLOATING CONFERENCE ROOM
INTERIOR VIEW OF BRIDGE OPTIONS
KPF, NEW YORK OFFICE
HYUNDAI AMCO TOWER
SEOUL, KOREA
KPF, NEW YORK OFFICE
HYUNDAI AMCO TOWER
SEOUL, KOREA
EXTERIOR VIEW OF THE TOWER
INTERIOR VIEW OF LOBBY
KPF, NEW YORK OFFICE
PIER OFFICE TOWER
NEW JERSEY, NEW YORK, USA
KPF, LONDON OFFICE
MGM COTAI HOTEL
COTAI, MACAU
BIRD’S EYE VIEW OF PUBLIC ATRIUM
KPF, LONDON OFFICE
MGM COTAI HOTEL
COTAI, MACAU
BASEMENT LV1 PLAN - PARKING / MECHANICAL
KPF, LONDON OFFICE
MGM COTAI HOTEL
COTAI, MACAU
Proposed Atrium - Diagrammatic Sections
Proposed Atrium & Mansion Design - Bird’s Eye Perpsective View
KPF, LONDON OFFICE
MGM COTAI HOTEL
COTAI, MACAU
Proposed Mansion - Fritted Facade Design Option
KPF, LONDON OFFICE
MGM COTAI HOTEL
COTAI, MACAU
VIEW OF EXISITING PARK AVENUE ENTRANCE
VIEW OF PROPOSED PARK AVENUE ENTRANCE
RENDERED FLOLOR PLAN WITH PROPOSED GALLERY OPTION
RENDERED FLOOR PLAN WITH PROPOSED GALLERY SPACE
STRUCTURAL PLAN OF KEY CIRCULATION SPACE
LOBBY
WINNING COMPETITION ENTRY
KPF, NEW YORK OFFICE
280 PARK AVENUE LOBBY RENOVATION
MANHATTAN, NEW YORK, USA
Proposed Section with Canopy Option
Proposed Floor Plan - Level 02
Proposed Section with Gallery Option
Proposed Floor Plan - Level 01
Proposed - Conceptual Diagrams
WINNING COMPETITION ENTRY
KPF, NEW YORK OFFICE
280 PARK AVENUE LOBBY RENOVATION
MANHATTAN, NEW YORK, USA
PHYSICAL MODEL
SECTIONAL PERSPECTIVE
VIEW OF ATRIUIM
PERKINS + WILL, NEW YORK OFFICE
SMART CITY HEADQUARTER
CAIRO, EGYPT
RENDERING OF THE COMPLEX
IN COLLABORATION WITH SEAPLAN ARCHITECTS, KOREA
PERKINS + WILL, NEW YORK OFFICE
GOVERNMENT MASTERPLAN COMPETITION
KYUNGSANGBOOKDO, KOREA
RENDERED VIEW
PHYSICAL MODEL
PERKINS + WILL, NEW YORK OFFICE
SCHOOL OF BUSINESS, UNIVERSITY OF ALBANY
ALBANY, NEW YORK, USA
STREET VIEW OF 45 STORIES ZONING OPTION FROM MADISON AVENUE
SITE PLAN
3. ZONING OFFICE OPTION 2
15 FAR - 21 STORIES
21.6 FAR - 36 STORIES
24 FAR - 45 STORIES
2. ZONING OFFICE OPTION 1
15 FAR - 21 STORIES
21.6 FAR - 36 STORIES
24 FAR - 45 STORIES
1. EXISITING SITE PLAN
19.5 FAR - 24 STORIES
FXFOWLE, NEW YORK OFFICE
MADISON SQUARE ZONING PROPOSAL
MANHATTAN,NY,USA
42nd Street - Proposed Wall Sections
42nd Street - Rendered Elevations
FXFOWLE, NEW YORK OFFICE
4 TIMES SQUARE RENOVATION
MANHATTAN, NEW YORK, USA
One Retail Tenant: LV-03 Plan
One Retail Tenant: LV-02 Plan
One Retail Tenant: LV-03 Plan
Rendered Perspective View- Proposed Storefront
FXFOWLE, NEW YORK OFFICE
4 TIMES SQUARE RENOVATION
MANHATTAN, NEW YORK, USA
WINNING PROPOSAL ENTRY
FXFOWLE, NEW YORK OFFICE
285 WEST 110TH STREET
MANHATTAN, NEW YORK, USA
Floor LV-13
Floor LV-12
Floor LV-11
Floor LV2 Floor LV-3-8 Floor LV-9
Basement LV-2 Basement LV-1 Ground Floor
WINNING PROPOSAL ENTRY
FXFOWLE, NEW YORK OFFICE
285 WEST 110TH STREET
MANHATTAN, NEW YORK, USA
OMA, ROTTERDAM OFFICE
PHOENICO-PERSIAN QUARTER ARCHIVE MUSEUM
BEIRUT
CLEAR GLASS
GLASS
ARCHIVE SELF
CLEAR GLASS
LED LIGHTING
STRUCTURE
CLEAR GLASS
EXISTING
BEAM
AA
HERITAGE TRAIL INFO FLEXIBLE DISPLAY AND MEDIA
FIXED STORAGE
IN
OUT
ACTIVE HUMIDITY
CONTROL SYSTEM
HUMIDY
CONTROL SYSTEM
1m
OMA, ROTTERDAM OFFICE
PHOENICO-PERSIAN QUARTER ARCHIVE MUSEUM
BEIRUT
OMA, ROTTERDAM OFFICE
V-ROM
DEN HAAG, NETHERLANDS
Entree
Rijkslobby
Entree
Fietsparkeren
Rijksambtenaren
Entree
IND 1+
Legalisatie 2+
Publieke
Entree
Stadslobby
Entree
Rijkslobby
Expeditie
Restaurant
EXPLODED AXONOMETRIC SHOWING PUBLIC ACCESS AND FUNCTIONS OF THE PODIUM LEVELS
Publieke
Entree
Stadslobby
OMA, ROTTERDAM OFFICE
V-ROM
DEN HAAG, NETHERLANDS
OMA, ROTTERDAM OFFICE
V-ROM
DEN HAAG, NETHERLANDS
OMA, ROTTERDAM OFFICE
EXHIBITION HALL
KUWAIT CITY, KUWAIT
GUIYANG SUPERTALL TOWER
SOM, NEW YORK OFFICE
GUOYANG, CHINA
GUIYANG SUPERTALL TOWER
SOM, NEW YORK OFFICE
GUOYANG, CHINA
GUIYANG SUPERTALL TOWER
SOM, NEW YORK OFFICE
GUOYANG, CHINA
GUIYANG SUPERTALL TOWER
SOM, NEW YORK OFFICE
GUOYANG, CHINA
GUIYANG SUPERTALL TOWER
SOM, NEW YORK OFFICE
GUOYANG, CHINA
GUIYANG SUPERTALL TOWER
SOM, NEW YORK OFFICE
GUOYANG, CHINA
SOM, NEW YORK OFFICE
304 Hudson Street
MANHATTAN, NEW YORK
SOM, NEW YORK OFFICE
304 Hudson Street
MANHATTAN, NEW YORK
SOM, NEW YORK OFFICE
304 Hudson Street
MANHATTAN, NEW YORK
SOM, NEW YORK OFFICE
304 Hudson Street
MANHATTAN, NEW YORK
L
K
J
I
H
G
F
E
D
C
BICYCLE
PARKING
B
A
STAIR
74 m²
CORRIDOR
DN
DN
SHAFT
30 m²
40 BIKE PARKING
29 m²
ZERO GRAVITY RIDE
SUPPORT FOR
MECHANICAL ROOM
STAIR
20 m²
35 m²
16 m²
ELEVATOR LOBBY
ELEV
SHAFT
284 m²
COMMERCIAL SPACE
355 m²
BUMPER CAR
1
115 m²
GAMING LOBBY
31 m²
TIVOLI BANK
ELEV
88 m²
TIVOLI ENTERTAIMENT
1 2
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 37
22 m²
ELEVATOR
67 m²
CORRIDOR
BALLET SCHOOL
LOBBY
93 m²
STAIR
32 m²
EXISTING
RESTAURANT
759 m²
8 m²
STAIR
1189mm X 841mm
ROOM & AREA CHART (OCCUPANCY BY FLOOR) -
Level 0
ROOM & AREA TABLE (TOTAL OCCUPANCY)
Occupancy
AREA
OCCUPANCY
AREA
ADMIN 31 m²
BALLET 159 m²
COMMERCIAL SPACE 284 m²
SHARED 238 m²
TIVOLI ENTERTAINMENT 587 m²
Grand total 1299 m²
ADMIN 2378 m²
BALLET 929 m²
BOYS GUARD 619 m²
CLIMATE WALL 81 m²
COMMERCIAL SPACE 284 m²
ROOFTOP 1722 m²
SHARED 2280 m²
TERRACE 354 m²
TIVOLI ENTERTAINMENT 945 m²
Grand total 9591 m²
EXISTING
CONCERT HALL
1
2
3
4
2
3
4
A-303
A-303
A-303
A-303
A-304
A-304
A-304
A-304
TIVOLI BOY'S GUARD /
BOY'S GUARD ENTRY
3000
3000
3470
( SLAB
ELEVATION)
1
3000
A-301
3000
3000
3000
3000
2
A-301
3000
3000
1
A-302
3000
3000
+ 4.829
+ 4.14
MEAN GRADE
3860
( SLAB ELEVATION)
BICYCLE STORAGE
ENTRY
TIVOLI BOY'S GUARD /
BALLET SCHOOL STREET ENTRY
+ 3.45
TIETGENSGADE
3000 3000 3000 3000 3000 3000 3000 6000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000
3000 3000
Axon - SW
TIVOLI HUSET
TIVOLI
Vesterbrogade 3, 1620 København, Denmark
DESIGN ARCHITECT
Consultants
Consultants
No. Date Revision
No. Date Revision
Date
9/19/2016 1:46:20 PM
Scale
1 : 100
Project No. & Title
TIVOLI HUSET
Project Status
Drawn By
Author
Checked By
Checker
Drawing Title
Drawing No.
A-100
Floor Plan - Ground
PEI COBB FREED & PARTNERS, NEW YORK OFFICE
Tivoli Gardens / Ballet School
COPENHAGEN, DENMARK
88 PINE STREET
NEW YORK, NY 10005 USA
1-212-751-3122
Concept Design
Level 1 - Floor Plan
Level 4 - Floor Plan
Level 0 - Floor Plan
Level 3 - Floor Plan
Cellar - Floor Plan
Level 2 - Floor Plan
PEI COBB FREED & PARTNERS, NEW YORK OFFICE
Tivoli Gardens / Ballet School
COPENHAGEN, DENMARK
PEI COBB FREED & PARTNERS, NEW YORK OFFICE
Tivoli Edge / Mixed-use
COPENHAGEN, DENMARK
1189mm X 841mm
4,650
LEVEL 00
6,000
1189mm X 841mm
1
NORTH ELEVATION
1 : 125
1
NORTH ELEVATION
1 : 125
K
J
I
H
G
F
E
D
C
B
A
1 2 3 4 5 5,000 4,800 1,270 63,000 1,900 2,241 3,154 73,390 2,225 4,340 8 9 10
11
1 2 3 4 5 6 7
8 9 10
11
105,500
105,500
10,550
10,550
10,550
10,550
10,550
10,550
10,550
10,550
10,550
10,550
1
10,550
2
10,550
3
10,550
4
10,550
5
10,550
6
10,550
7
10,550
8
10,550
9
10,550
10
10,550
11
1 2 3 4 5 6 7
8 9 10
11
105,500
10,550
10,550
10,550
10,550
10,550
10,550
10,550
10,550
10,550
10,550
105,500
10,550
10,550
10,550
10,550
10,550
10,550
3,850
ROOF
PAVILION 10,550
22,900
ROOF
22,550
10,550
PARAPET
20,100
10,550
10,550
PAVILION ROOF
22,550
1
WEST ELEVATION 1
2
WEST ELEVATION
1 : 125
1 : 125
NORTH ELEVATION
1 : 125
2,700
2,700
16,900
4,650
4,200
4,200
16,900
LEVEL 03
19,050
LEVEL 02
14,850
LEVEL 02 BALCONY
13,850
LEVEL 01
10,650
LEVEL 00
6,000
16,550
16,550
14,100
2,450
14,100
2,450
2,450
4,200 2,450
4,200 3,500
4,200 4,200
4,200 3,500
3,500
16,550
16,550
14,100
14,100
4,650
4,650
4,650 4,200
3,500
4,200
4,200
4,650
PAVILION ROOF
22,550
PARAPET
20,100
PARAPET
PAVILION
LEVEL 20,100
ROOF
03
19,050
22,550
PAVILION LEVEL 03
ROOF
19,050
22,550
PARAPET
LEVEL
20,100
02
PARAPET
14,850
LEVEL 02 BALCONY
20,100
LEVEL 02 03
13,850
14,850 19,050
LEVEL 02 BALCONY
LEVEL 03
13,850
19,050
LEVEL 01
LEVEL
10,650
02
14,850
LEVEL 02 BALCONY LEVEL LEVEL 01
02
13,850 10,650
14,850
LEVEL 02 BALCONY
13,850
LEVEL LEVEL 00 01
6,000 10,650
LEVEL 01
LEVEL 10,650 00
6,000
LEVEL 00
6,000
LEVEL 00
6,000
1
WEST ELEVATION
1 : 125
TIVOLI CORNER
THE CORNER
TIVOLI A/S
Vesterbrogade 3
DK-1630 København V.
DESIGN ARCHITECT
88 PINE STREET
NEW YORK, NY 10005 USA
1-212-751-3122
TIVOLI CORNER
THE CORNER
TIVOLI A/S
Vesterbrogade 3
DK-1630 København V.
DESIGN ARCHITECT
88 PINE STREET
NEW YORK, NY 10005 USA
1-212-751-3122
2
WEST ELEVATION
1 : 125
11 10
9
8
7
6
5
4
3
2
1
Consultants
Consultants
No. Date Revision
1 2 3 4 5 No. Date 6 Revision
7
8 Date
9 Drawn By
Drawing 10 Title
11
8/11/2016 2:59:35 PM
Author
Scale
Checked By
105,500
1 : 125
Checker
11 10
9
8
7
6
5
4 Project No. & Title
3
2
1
10,550
10,550
10,550
10,550
10,550
10,550
10,550
1206 TIVOLI 10,550 CORNER
10,550
10,550
Project Status
Consultants
Consultants
No. Date Revision
No. Date Revision
CONCEPTUAL Date DESIGN
Drawn By
Drawing Title
8/11/2016 2:59:35 PM
Author
Scale
Checked By
1 : 125
Checker
Project No. & Title
1206 TIVOLI CORNER
Project Status
CONCEPTUAL DESIGN
VARIES VARIES 4,200 4,200 4,200 4,200 3,850
3,850
Drawing No.
A-190
BUILDING ELEVATIONS
ROOF
- NORTH & WEST
22,900
Drawing No.
A-190
ROOF
LEVEL 22,900
03
19,050
BUILDING ELEVATIONS
- NORTH & WEST
LEVEL 03
19,050
LEVEL 02
14,850
LEVEL 02
14,850
LEVEL 01
10,650
LEVEL 01
10,650
LEVEL 00
6,000
16,550
2,450
14,100
3,500
4,200
4,200
PAVILION ROOF
22,550
PARAPET
20,100
LEVEL 03
19,050
LEVEL 02
14,850
LEVEL 02 BALCONY
13,850
LEVEL 01
10,650
2,700
LEVEL 00
6,000
4,650
2
EAST ELEVATION_ Copy 5 Copy 1
1 : 125
LEVEL 00
6,000
2
EAST ELEVATION_ Copy 5 Copy 1
1 : 125
2
WEST ELEVATION
1 : 125
TIVOLI CORNER
TIVOLI CORNER THE CORNER
THE CORNER
TIVOLI A/S
Vesterbrogade 3
DK-1630 København V.
DESIGN TIVOLI ARCHITECT CORNER
88 THE PINE STREET CORNER
TIVOLI A/S
Vesterbrogade 3
DK-1630 København V.
DESIGN ARCHITECT
88 PINE STREET
NEW YORK, NY 10005 USA
1-212-751-3122
Consultants
Consultants
Consultants
Consultants
No. Date Revision
No. Date Revision
No. Date Revision
Consultants
No. Date Revision
Consultants No. Date Revision
No. Date Revision
Date
Drawn By
8/11/2016 2:59:35 PM
Author
Date
Drawn By
Drawing Title
Scale
Checked By
8/11/2016 10:28:10 AM
Author
1 : 125
Checker
Scale
Checked By
Project No. & Title
1 : 125
Checker
1206 TIVOLI CORNER
Date
Project No. & Title
Drawn By
Drawing Title
Project Status
8/11/2016 1206 TIVOLI 10:28:10 CORNER AM
Author
CONCEPTUAL DESIGN
Scale
Project Status
Checked By
1 CONCEPTUAL : 125
DESIGN
Checker
PEI COBB FREED & PARTNERS, NEW YORK OFFICE
Tivoli Edge / Mixed-use
Drawing No.
COPENHAGEN, DENMARK
Drawing Title
Drawing No.
A-190
A-191
BUILDING ELEVAT
Drawing No.
BUILDING ELEVATIONS
- NORTH & WEST
- EAST & WEST
Street Perspective Rederning View, Axonometric Section, Detail Sections & Plan of the Exterior Climate Wall
PEI COBB FREED & PARTNERS, NEW YORK OFFICE
Tivoli Edge / Mixed-use
COPENHAGEN, DENMARK
PEI COBB FREED & PARTNERS, NEW YORK OFFICE
Tivoli Edge / Mixed-use
COPENHAGEN, DENMARK
PEI COBB FREED & PARTNERS, NEW YORK OFFICE
Tivoli Edge / Mixed-use
COPENHAGEN, DENMARK
PEI COBB FREED & PARTNERS, NEW YORK OFFICE
Tivoli Edge / Mixed-use
COPENHAGEN, DENMARK
PEI COBB FREED & PARTNERS, NEW YORK OFFICE
COLUMBIA UNIVERSITY, CENTER FOR PRECISION DENTAL MEDICINE
NEW YORK, NY, USA
PEI COBB FREED & PARTNERS, NEW YORK OFFICE
COLUMBIA UNIVERSITY, CENTER FOR PRECISION DENTAL MEDICINE
NEW YORK, NY, USA
PEI COBB FREED & PARTNERS, NEW YORK OFFICE
COLUMBIA UNIVERSITY, CENTER FOR PRECISION DENTAL MEDICINE
NEW YORK, NY, USA
PEI COBB FREED & PARTNERS, NEW YORK OFFICE
COLUMBIA UNIVERSITY, CENTER FOR PRECISION DENTAL MEDICINE
NEW YORK, NY, USA
PEI COBB FREED & PARTNERS, NEW YORK OFFICE
COLUMBIA UNIVERSITY, CENTER FOR PRECISION DENTAL MEDICINE
NEW YORK, NY, USA
PEI COBB FREED & PARTNERS, NEW YORK OFFICE
COLUMBIA UNIVERSITY, CENTER FOR PRECISION DENTAL MEDICINE
NEW YORK, NY, USA
Rendered Perspective Views - Study of operatory partition designs, ceiling & flooring option.
MEP & Structural Coordination - Revit Model Plan View
PEI COBB FREED & PARTNERS, NEW YORK OFFICE
COLUMBIA UNIVERSITY, MEDICAL CENTER
NEW YORK, NY, USA
Bird’s eye perspective view shoing the development of a master plan consoliding school’s footprint of dispered spaces, currently lacking a center - within the New York Presbyterian / Columbia University Medical Center Complex.
PEI COBB FREED & PARTNERS, NEW YORK OFFICE
COLUMBIA UNIVERSITY, MEDICAL CENTER
NEW YORK, NY, USA
1/30/2018 6:19:19 PM
1
1
4
AD4.16
2
SK4.18
2
AD4.68
1
1
SK4.18
1
10
AD4.09
5
AD4.09
PC-01
1
1 1
ST-02
1
1
5
AD4.02
RETAIL LEVEL (+302.50)
-4' - 6"
1 20-EL-WEST
1/16" = 1'-0"
ROBERT A.M. STERN ARCHITECTS, NEW YORK OFFICE
THE GAYLEY AT WILSHIRE - RESIDENTIAL TOWER
LOS ANGELES, CALIFORNIA, USA
LE
NOTE: PRECAS
AND SIMULAT
AD3.20 SERIES
SIMU
PANE
SPAN
FROS
KEY PLAN
T
NOT IS
5 Revision No.1
4 Exterior Design
3 Design Developm
2 Schematic Desig
A 1 CLIENT Progress APPRO Print
No. ISSUE
WILS
109
WIL
10877 W
ROBERT A.M
ONE P
TEL
S
523 WES
WE
LEVEL 20
232' - 4"
LEVEL 19
221' - 8"
LEVEL 18
211' - 0"
LEVEL 17
200' - 4"
LEVEL 16
189' - 8"
LEVEL 15
179' - 0"
LEVEL 14
168' - 4"
LEVEL 13
157' - 8"
LEVEL 12
147' - 0"
LEVEL 11
134' - 0"
LEVEL 10
123' - 4"
LEVEL 09
112' - 8"
LEVEL 08
102' - 0"
LEVEL 07
91' - 4"
LEVEL 06
80' - 8"
LEVEL 05
70' - 0"
LEVEL 05
70' - 0"
LEVEL 04
55' - 0"
LEVEL 03
37' - 0"
LEVEL 02
21' - 0"
LEVEL 01
0' - 0"
RETAIL LEVEL (+302.50)
-4' - 6"
FIRE DEPARTMENT
CONNECTION
HOSE BIB
FIRE DEPARTMENT
CONNECTION
HOSE BIB
ROBERT A.M. STERN ARCHITECTS, NEW YORK OFFICE
THE GAYLEY AT WILSHIRE - RESIDENTIAL TOWER
LOS ANGELES, CALIFORNIA, USA
ROBERT A,M. STERN ARCHITECTS, NEW YORK OFFICE
THE GAYLEY AT WILSHIRE - RESIDENTIAL TOWER
LOS ANGELES, CALIFORNIA, USA
KEY MAP
KEY MAP
TRIM DETAIL
WILSHIRE GAYLEY
LOS ANGELES, CA
WILSHIRE GAYLEY
OPTION 2
LOS ANGELES, CA
ROBERT A.M. STERN ARCHITECTS, LLP
WILSHIRE GAYLEY, LLC
PREVIOUS DESIGN
STEINBERG ARCHITECTS
ROBERT A.M. STERN ARCHITECTS, LLP
WILSHIRE GAYLEY, LLC
STEINBERG ARCHITECTS
ROBERT A,M. STERN ARCHITECTS, NEW YORK OFFICE
THE GAYLEY AT WILSHIRE - RESIDENTIAL TOWER
LOS ANGELES, CALIFORNIA, USA
2
AD4.71
PC-01
MT-01
GL-01
6"
6"
1"
1"
11
AD4.09
10" 4 1/2" 4 1/2" 10"
6'-2" 9'-0" 4'-9" 4'-0" 4'-5 1/2"
10" 4 1/2" 4 1/2" 10"
6'-2" 4'-9" 4'-0" 4'-5 1/2"
9'-0"
1"
1
6"
6"
1"
1
1
4
AD4.12
EQ
MT-01
PC-01
GL-01
EQ
8
AD4.09
LEVEL 13
157' - 8"
7
AD4.09
LEVEL 12
147' - 0"
10"
EQ
EQ
LEVEL 29
337' - 8"
LEVEL 28
324' - 8"
LEVEL 27
311' - 8"
LEVEL 26
298' - 8"
6
AD4.09
4'-0" 1'-11" 2'-8" 2'-11" 1'-8" 4'-8" 1'-8" 6'-2"
4'-0" 1'-11" 2'-8" 4'-5" 5'-0" 9'-3"
4'-0" 1'-11" 2'-8" 2'-11" 8'-0" 6'-10 1/2"
6
AD4.55
Sim
5
AD4.55
Sim
3'-8"
4'-6 1/2"
7
AD4.12
9'-0"
6'-0"
2'-5 3/8"
3'-11 3/8"
6"
6"
2'-8"
2'-8"
10" 4 1/2"
2'-10 5/8"
2'-10 5/8"
5'-0"
5'-0"
1
1
1
MT-01
GL-01
PC-01
MT-05
GL-06
3
AD4.09
2
AD4.09
1
AD4.09
LEVEL 10
123' - 4"
TC-01
4'-7 1/2"
4'-7 1/2"
LEVEL 09
112' - 8"
LEVEL 08
102' - 0"
LEVEL 07
91' - 4"
8
AD4.12
LEVEL 06
80' - 8"
9
AD4.12
LEVEL 05
70' - 0"
7
AD4.09
THIS IS A PRELIMINARY DRAWING
NOT ISSUED FOR CONSTRUCTION PURPOSES
10877 WILSHIRE BLVD, LOS ANGELES, CA 90024
ONE PARK AVENUE, NEW YORK, NY 10016
TEL (212) 967-5100 FAX (212) 967-5588
523 WEST 6th STREET, LOS ANGELES, CA 90014
A16062
A16062
THIS IS A PRELIMINARY DRAWING
NOT ISSUED FOR CONSTRUCTION PURPOSES
10877 WILSHIRE BLVD, LOS ANGELES, CA 90024
ONE PARK AVENUE, NEW YORK, NY 10016
TEL (212) 967-5100 FAX (212) 967-5588
523 WEST 6th STREET, LOS ANGELES, CA 90014
A16062
A16062
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
5
AD4.16
L
LEGEND / NOTES
3'-9"
LEVEL 26
298' - 8"
LEGEND / NOTES
L NOTE: PRECAST PANEL JOINTS, STONE JOINTS
AND SIMULATED JOINTS SHALL FOLLOW THE
AD3.20 SERIES.
L
K
J
I
1
3'-6" 19'-3"
5'-5"
2'-0"
PC-01
3
AD4.15
L
K
J
I
NOTE: PRECAST PANEL JOINTS, STONE JOINTS
AND SIMULATED JOINTS SHALL FOLLOW THE
AD3.20 SERIES.
K
J
I
H
G
F
E
9'-9"
7" 3'-2" 7'-6" 3'-2" 7'-6"
3'-2"
7'-6"
3'-2"
11 SECTION
10 ELEVATION - WINDOW GROUPING
1/4" = 1'-0"
1/4" = 1'-0"
LEVEL 25
285' - 8"
LEVEL 24
275' - 0"
6 SECTION
1/4" = 1'-0"
7'-1" 3'-7" 7'-1" 3'-7" 8'-10" 4'-2" 7'-1" 3'-7"
5 ELEVATION - WINDOW GROUPING
1/4" = 1'-0"
LEVEL 13
157' - 8"
LEVEL 12
147' - 0"
LEVEL 11
134' - 0"
LEVEL 09
112' - 8"
K
J
I
H
G
F
E
KEY PLAN
N
5 Revision No.1 2018-01-26
4 Exterior Design Development 2017-12-21
3 Design Development - Progress Print 2017-11-10
2 Schematic Design 2017-06-30
1 Progress Print 2017-06-09
No. ISSUE DATE
GL-01
D
3 PLAN LEVEL 12
1/4" = 1'-0"
D
WILSHIRE & GAYLEY
10955 WILSHIRE BOULEVARD
LOS ANGELES, CA 90024
H
MT-01
2
AD4.16
H
C
8 PLAN LEVEL 24
1/4" = 1'-0"
C
WILSHIRE GAYLEY, LLC.
ROBERT A.M. STERN ARCHITECTS, LLP.
B
2 PLAN LEVEL 11
1/4" = 1'-0"
B
STEINBERG ARCHITECTS
TOWER WINDOWS (WEST)
G
1
AD4.16
G
1/25/2018 11:27:20 PM
A
KEY PLAN
12 3D VIEW
7 PLAN LEVEL 12
4 3D VIEW
1 PLAN LEVEL 10
1/4" = 1'-0"
1/4" = 1'-0"
1 2 3 4 5 6 7 8 9 10 11 12
A
Project No.
CAD File No.
AD4.09
Drawing No.
Copyright (c) 2017 Robert A.M. Stern Architects
MT-05
GL-06
1 2 3 4 5 6 7 8 9 10 11 12
F
F
L
N
LEGEND / NOTES
L NOTE: PRECAST PANEL JOINTS, STONE JOINTS
AND SIMULATED JOINTS SHALL FOLLOW THE
AD3.20 SERIES.
THIS IS A PRELIMINARY DRAWING
NOT ISSUED FOR CONSTRUCTION PURPOSES
7'-5 1/4"
3'-2"
K
3'-11 3/4"
7'-6"
K
3'-2"
E
6 3D VIEW
5 SECTION
1/4" = 1'-0"
4 ELEVATION - WEST CROWN DETAILS
1/4" = 1'-0"
AD4.66
1
E
J
5 Revision No.1 2018-02-06
4 Exterior Design Development 2017-12-21
3 Design I Development - Progress Print 2017-11-10
2 Schematic Design 2017-06-30
A CLIENT Progress APPROVAL Print XX.XX.XXXX
2017-06-09
1
No. ISSUE DATE
3'-8 3/4"
9'-3"
3'-9"
7'-6"
3'-2"
7'-6"
D
7 1/2" 3"
D
WILSHIRE & GAYLEY
9'-3"
1'-11" 1'-9 1/2" 3'-0" 3'-0" 1'-9 1/2" 1'-9 1/2" 6'-0" 1'-9 1/2" 1'-9 1/2" 3'-0" 3'-0" 1'-9 1/2" 1'-11"
10955 WILSHIRE BOULEVARD
LOS ANGELES, CA 90024
3'-9"
3'-2"
J
I
H
7'-1"
H
G
5'-11 3/8"
G
KEY PLAN
3'-1" 8" 4'-0" 8" 3'-1" 1'-2" 3'-8" 1'-2" 5'-9 1/2" 8" 8'-0" 8" 5'-9 1/2" 1'-2" 3'-8" 1'-2 1/2" 3'-1" 8" 4'-0" 8" 3'-1"
WILSHIRE GAYLEY, LLC.
C
10'-6"
10'-6"
2 PLAN LEVEL 30
1/4" = 1'-0"
C
F
10877 WILSHIRE BLVD, LOS ANGELES, CA 90024
4 SECTION
2 ELEVATION - CURVED CORNER
1/4" = 1'-0"
ROBERT A.M. STERN ARCHITECTS, LLP.
E ONE PARK AVENUE, NEW YORK, NY 10016
TEL (212) 967-5100 FAX (212) 967-5588
1/4" = 1'-0"
7 SECTION B
1/4" = 1'-0"
5 WINDOW GROUPING - ELEVATION
1/4" = 1'-0"
F
E
N
STEINBERG HART
4 Exterior Design Development 2017-12-21
3 Design Development - Progress Print 2017-11-10
2 Schematic Design 2017-06-30
1 Progress Print 2017-06-09
No. ISSUE DATE
B
B
D 523 WEST 6th STREET, LOS ANGELES, CA 90014
CROWN DETAILS - WEST
10"
EQ
8 PLAN LEVEL 06
D
WILSHIRE & GAYLEY
10955 WILSHIRE BOULEVARD
LOS ANGELES, CA 90024
WILSHIRE GAYLEY, LLC.
C
1/4" = 1'-0"
C
ROBERT A.M. STERN ARCHITECTS, LLP.
11'-6" 1'-2" 3'-8" 1'-2" 20'-11" 1'-2" 3'-8" 1'-2" 12'-1"
Project No.
STEINBERG ARCHITECTS
2/6/2018 3:38:27 PM
A
3 PLAN LEVEL SKYDECK
1 PLAN LEVEL 29
11'-6" 1'-2" 3'-8" 1'-2" 20'-11 1/2" 1'-2" 3'-8" 1'-2 1/2" 11'-5 1/2"
1/4" = 1'-0"
1/4" = 1'-0"
1 2 3 4 5 6 7 8 9 10 11 12
A
12/21/2017 6:55:44 PM
B
A
1 3D VIEW
CAD File No.
AD4.16
Drawing No.
1/4" = 1'-0"
10"
EQ
10"
EQ
EQ
3 PLAN LEVEL 28
6 3D VIEW
9 PLAN LEVEL 05
1 2 3 4 5 6 7 8 9 10 11 12
Copyright (c) 2017 Robert A.M. Stern Architects
1/4" = 1'-0"
B
A
TOWER WINDOWS &
CURVED CORNER
DETAILS - EAST
Project No.
CAD File No.
AD4.12
Drawing No.
Copyright (c) 2017 Robert A.M. Stern Architects
ROBERT A.M. STERN ARCHITECTS, NEW YORK OFFICE
THE GAYLEY AT WILSHIRE - RESIDENTIAL TOWER
LOS ANGELES, CALIFORNIA, USA
1"
AD4.15
3
PC-01
MT-01
GL-01
MT-01
GL-01
1"
6" 8" 8" 8" 8" 6"
2'- 8" = 4 EQ DIVISIONS @ 8"
1'-6" 1'-6" 2'-0" 3'-6" 2'-0" 4'-8"
1
AD4.71
9
AD4.11
MAIN ROOF
388' - 3"
AD4.69
1
10" EQ EQ EQ 10" 1'-11" 10"
1"
8" 8"
11"
EQ
AD4.15
3
LEVEL 29
337' - 8"
MT-01
GL-01
PC-01
MT-01
GL-01
3
AD4.11
PC-01
LEVEL 28
324' - 8"
GL-01
MT-01
LEVEL 27
311' - 8"
LEVEL 26
298' - 8"
EQ
EQ
1'-11"
PC-01
PC-01
MT-01
PC-01
1'-9 1/2"
3
AD4.70
7
AD4.70
3/4"
GL-01
3'-0"
5"
3'-0"
1" 1"
EQ
EQ
1'-9 1/2"
EQ
2'- 8" = 4 EQ DIVISIONS @ 8"
1'-9 1/2"
EQ
5"
3'-0"
PC-01
ST-02
TC-02
2'-8"
3'-0"
2'-7"
PC-01
PC-01
PC-01
1'-9 1/2"
4'-3"
1'-9 1/2"
7
AD4.11
8'-0"
3'-0"
3'-8"
3'-0"
5'-7"
1'-9 1/2"
EQ
1'-11"
6
ADA4.11
6-
AD4.11 ---
11"
PC-01
LEVEL 12
147' - 0"
MT-01
GL-01
LEVEL 13
157' - 8"
LEVEL 11
134' - 0"
LEVEL 06
80' - 8"
LEVEL 05
70' - 0"
LEVEL 04
55' - 0"
EQ
EQ
1
AD4.11
THIS IS A PRELIMINARY DRAWING
NOT ISSUED FOR CONSTRUCTION PURPOSES
10877 WILSHIRE BLVD, LOS ANGELES, CA 90024
ONE PARK AVENUE, NEW YORK, NY 10016
TEL (212) 967-5100 FAX (212) 967-5588
523 WEST 6th STREET, LOS ANGELES, CA 90014
A16062
A16062
THIS IS A PRELIMINARY DRAWING
NOT ISSUED FOR CONSTRUCTION PURPOSES
10877 WILSHIRE BLVD, LOS ANGELES, CA 90024
ONE PARK AVENUE, NEW YORK, NY 10016
TEL (212) 967-5100 FAX (212) 967-5588
523 WEST 6th STREET, LOS ANGELES, CA 90014
A16062
A16062
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
L
K
J
I
H
G
F
12'-1" 3'-5" 10'-6" 3'-6" 9'-7 1/2" 9'-7 1/2" 5'-5" 2'-0"
2'-0" 1'-11"
1'-9" 10'-3" 3'-6" 10'-6" 3'-6" 9'-7 1/2" 9'-7 1/2" 5'-5" 2'-0"
3'-11"
6
AD4.17
5
AD4.17
PC-01
MT-01
GL-01
MT-05
GL-06
PARAPET
393' - 10"
MAIN ROOF
388' - 3"
2
AD4.17
LEVEL 31
365' - 8"
LEVEL 30
351' - 8"
1
AD4.17
LEVEL 29
337' - 8"
L
K
J
I
H
G
F
12/21/2017 7:10:01 PM
L
K
J
H
G
F
E
D
C
B
A
1'-0"
KEY P
I
L
1 ENLARGED DETAIL - CROWN REEDS - PLAN
1" = 1'-0"
MAIN ROOF
388' - 3"
LEVEL 31
365' - 8"
R 0' - 8 1/2"
6 ENLARGED DETAILS - TERRACE WINDOW ELEVATION - SKYDECK
1/2" = 1'-0"
N
1'-1" 1'-9"
3 3/8"
2 ENLARGED DETAIL - CROWN REEDS ELEVATION
1" = 1'-0"
2'-0"
9'-6"
1'-8 3/8"
6'-11 5/8"
1'-6"
R 1' - 4 1/2"
MAIN ROOF
388' - 3"
LEVEL 31
365' - 8"
1/2" = 1'-0"
1 2 3 4 5 6 7 8 9 10 11 12
PARAPET
393' - 10"
2 1/4"
1'-9"
3'-7"
MAIN ROOF
388' - 3"
3 ENLARGED DETAIL - CROWN RETURN ELEVATION
1" = 1'-0"
7 ENLARGED DETAILS - TERRACE DOOR ELEVATION - SKYDECK
4 3D VIEW
5 3D VIEW
1 2 3 4 5 6 7 8 9 10 11 12
3' - 7"
3'-0"
7'-10 1/4"
1'-9 3/4"
9'-0"
L
K
J
I
H
G
F
E
D
C
B
A
L
KEY PLAN
LEGEND / NOTES
NOTE: PRECAST PANEL JOINTS, STONE JOINTS
AND SIMULATED JOINTS SHALL FOLLOW THE
AD3.20 SERIES.
4 Exterior Design Development 2017-12-21
3 Design Development - Progress Print 2017-11-10
2 Schematic Design 2017-06-30
1 Progress Print 2017-06-09
No. ISSUE DATE
WILSHIRE & GAYLEY
10955 WILSHIRE BOULEVARD
LOS ANGELES, CA 90024
WILSHIRE GAYLEY, LLC.
ROBERT A.M. STERN ARCHITECTS, LLP.
STEINBERG ARCHITECTS
TYPICAL WINDOW
DETAILS 4
Project No.
CAD File No.
AD4.69
Drawing No.
Copyright (c) 2017 Robert A.M. Stern Architects
LEGEND / NOTES
NOTE: PRECAST PANEL JOINTS, STONE JOINTS
AND SIMULATED JOINTS SHALL FOLLOW THE
AD3.20 SERIES.
N
7' - 1"
E
6 SECTION
1/4" = 1'-0"
5 SECTION
1/4" = 1'-0"
4 ELEVATION - CROWN DETAILS
1/4" = 1'-0"
E
K
J
1' - 11"
4' - 2"
2' - 0"
4' - 1 1/2"
8' - 10"
K
J
3' - 8 1/2"
3'-7"
3' - 7"
I
I
9' - 3"
D
C
2 PLAN LEVEL SKYDECK
1/4" = 1'-0"
5'-9 1/2"
9'-5"
4'-10 1/2"
9'-5"
4'-10 1/2"
9'-5"
4'-10 1/2"
9'-5"
D
C
H
G
F
3' - 9"
9' - 3"
3' - 9"
9' - 0" 6' - 0" 7' - 1 1/2" 3' - 2 1/2"
9' - 0" 6' - 0" 7' - 1 1/2" 3' - 2 1/2"
H
G
KEY PLAN
F
N
E
9 SECTION C
1/4" = 1'-0"
8 ELEVATION - CURVED CORNER
1/4" = 1'-0"
7 SECTION B
1/4" = 1'-0"
6 SECTION A
1/4" = 1'-0"
5 ELEVATION - CURVED CORNER
1/4" = 1'-0"
E
4 Exterior Design Development 2017-12-21
3 Design Development - Progress Print 2017-11-10
2 Schematic Design 2017-06-30
1 Progress Print 2017-06-09
10" EQ EQ 10" 1'-11" 10"
7'-0" 3'-2 1/2" 2'-0"
No. ISSUE DATE
B
5'-10"
6'-8"
5'-8"
4'-0"
3'-0"
4'-0"
5'-8"
4'-0"
7'-0"
5'-8"
6'-8"
B
D
5' 7 3/4".
D
WILSHIRE & GAYLEY
10955 WILSHIRE BOULEVARD
LOS ANGELES, CA 90024
17'-8 1/2"
WILSHIRE GAYLEY, LLC.
C
C
ROBERT A.M. STERN ARCHITECTS, LLP.
STEINBERG ARCHITECTS
12/21/2017 7:48:57 PM
A
3 3D VIEW
1 PLAN LEVEL 29
1/4" = 1'-0"
1 2 3 4 5 6 7 8 9 10 11 12
A
12/21/2017 7:16:32 PM
B
A
5' 7 3/4".
EQ
4 3D VIEW
3 PLAN LEVEL 28 2 3D VIEW
1 PLAN LEVEL 5
1 2 3 4 5 6 7 8 9 10 11 12
EQ
EQ
B
A
TOWER WINDOWS
(NORTHEAST CORNERS)
Project No.
CAD File No.
AD4.11
Drawing No.
Copyright (c) 2017 Robert A.M. Stern Architects
ROBERT A.M. STERN ARCHITECTS, NEW YORK OFFICE
THE GAYLEY AT WILSHIRE - RESIDENTIAL TOWER
LOS ANGELES, CALIFORNIA, USA
L
K
J
I
H
G
F
E
D
C
B
A
1/4" = 1'-0"
MT-02
1 2 3 4 5 6 7 8 9 10 11 12
GL-04
ST-03
1
AA-415
EXISTING BUILDING
TO REMAIN
EXISTING BUILDING
TO REMAIN
ST-03
BR-04
1 2 3 4 5 6 7 8 9 10 11 12
3
AA-415
1
AA-417
4
AA-415
3
AA-417
GL-04
MT-02
MT-02
GUTTER LEADS
TO INTERNAL DRAIN
L
K
J
I
F
E
D
C
B
A
BC-01 CUSTOM BRICK SHAPES,
NUMBER OF TYPES AND COLORS TO BE DEVELOPED
BR-01 WATSONTOWN BRICK WATSONTOWN BRICK BLEND OPTION 2:
BLEND, OPTION 1: 40% KEUKA MUDBOX TYPE 2 SMOOTH
45% KEUKA MUDBOX 20% MUDBOX SMOOTH
TYPE 2 SMOOTH
GEORGETOWNE TYPE 2 SMOOTH
55% CAYUGA MUDBOX 35% CAYUGA MUDBOX TYPE 2 SMOOTH
TYPE 2 SMOOTH
5% MANHATTAN COAL SMOOTH
CUSTOM MORTAR COLOR WITH STONE AGGREGATE
BR-03 YANKEE HILL BRICK BLEND:
65% DARK IRON SPOT SMOOTH
20% CAPITAL IRONSPOT SMOOTH
15% CHARCOAL SMOOTH
CUSTOM MORTAR COLOR
BR-04
GL-01
GL-01A
GL-02
GL-03
GL-04
LV-01
MT-01
MT-02
PA-01
RA-01
RA-02
RA-03
WN-01
WN-02
ST-01
ST-02
ST-03
BRICK BLEND BR-01 WITH DARK BRICKS ELIMINATED,
CUSTOM MORTAR COLOR
VISION GLASS
SPANDREL GLASS, CUSTOM COLOR
MARINE GLASS
CUSTOM LOUVERS WITH CUSTOM DECORATIVE GRILLES,
CUSTOM COLOR
BLACKENED METAL TRIM, CUSTOM FINISH
CUSTOM SCALLOPED PARAPET, GRANITE COPING WITH BR-03
SCALLOPS AND PAINTED METAL SILL
PV-01 GRANITE COBBLESTONE PAVERS, 7 5/8" X 3 5/8" X 3" THICK (MIN.),
SAWN FLAT TOP WITH MEDIUM FLAMED TEXTURE, FOUR SPLIT
EDGES (SIDES)
PV-02
PV-03
PV-04
WN-03
ST-04
VISION GLASS, FIRE RATED
CANOPY GLASS
BLACKENED BRONZE METAL, CUSTOM FINISH
RED GRANITE PAVERS, FLAMED FINISH
WATSONTOWN CUSTOM BRICK PAVERS TO MATCH BRICK BLEND
BR-01, MODULAR SIZED BRICK
GRANITE PAVERS ON PEDESTALS AT TERRACES, FLAMED FINISH
CUSTOM DECORATIVE BLACKENED STEEL RAILING WITH
CLEAR GLASS
CUSTOM PAINTED ALUMINUM WINDOW SYSTEM WITH BEVEL
PROFILE, SIMILAR TO 70 VESTRY STREET SYSTEM
CLEAR MARINE GLASS WINDOW SYSTEM WITH APPLIED
CUSTOM BLACKENED STEEL MUNTINS AND TRIM
CUSTOM BLACKENED STEEL WINDOW SYSTEM WITH BEVEL
PROFILE AND BLACKENED STEEL MUNTINS
STONE WATERTABLE, NORDIC BLACK GRANITE, HONED
DIMENSIONAL STONE SHAPES, NORDIC BLACK GRANITE, HONED
RED SANDSTONE, BUFF FINISH
STONE WINDOW SILL, NORDIC BLACK GRANITE, HONED
GENERAL NOTES:
1. THESE DRAWINGS ARE FOR PRELIMINARY PRICING AND ARE NOT FOR
CONSTRUCTION.
2. ADDITIONAL BRICK BLENDS, MIXES, BRICK PATTERNS, AND DIMENSIONAL
H BRICK DETAILING TO BE ADDED THROUGHOUT BUILDING. WHAT IS SHOWN IN
THIS DRAWING SET ARE PLACEHOLDERS AND WILL BE DESIGNED FURTHER IN
DESIGN DEVELOPMENT. BRICK PATTERNS AND EXTENTS INCLUDE BUT ARE NOT
LIMITED TO SOLDIER COURSES, DOGTOOTH, SAWTOOTH, KLINKER BRICKS, AND
DIAPER PATTERNS.
3. SPECIAL BRICK SHAPES REQUIRED AT ALL TYPICAL WINDOW JAMBS AND
HEADS.
4. EXTENT OF OPERABLE WINDOWS TO BE DETERMINED BY AOR.
5. LOUVERS AND SPANDREL GLASS LOCATIONS SUBJECT TO CHANGE.
LOUVERS TO INCLUDE CUSTOM DECORATIVE SCREEN IN EITHER METAL OR
STONE.
6. TERRACE DOOR DESIGN, EXTENTS, AND LOCATIONS TBD.
7. ALL OCCUPIABLE TERRACES TO HAVE FLAMED GRANITE PAVERS ON
PEDASTALS AT SAME LEVEL AS INTERIOR FINISH FLOOR.
8. CUSTOM DECORATIVE BALCONY DIVIDER DESIGN, EXTENTS, AND LOCATIONS
TBD.
9. ALL EXPOSED UNOCCUPIED ROOFS TO HAVE STONE BALLAST, STONE TYPE
AND COLOR TO BE SELECTED BY ARCHITECT.
10. CUSTOM EXTERIOR LIGHTING, TBD.
G 11. EXTERIOR ELECTRONIC DEVICES, DESIGNER GRADE, CUSTOM FINISH.
12. ALL PROFILES AND PARAPETS TO BE BE SLOPED TO DRAIN.
THIS IS A PRELIMINARY DRAWING
NOT ISSUED FOR CONSTRUCTION PURPOSES
No. ISSUE DATE
New York, NY 10001
460 WEST 34th STREET, NEW YORK, NY 10001
TEL (212) 967-5100 FAX (212) 967-5588
Project No.
CAD File No.
Drawing No.
A16032
A16032
Copyright (c) 2018 Robert A.M. Stern Architects
LEGEND / NOTES
AA-418
555 West 22nd Street
THE RELATED COMPANIES
ROBERT A.M. STERN ARCHITECTS, LLP.
ENLARGED RCP PLAN -
MOTORCOURT
1
CEILING PLAN
STAMP
AA-414
ROBERT A.M. STERN ARCHITECTS, NEW YORK OFFICE
555 West 22nd Street / High-End Residential Tower
NEW YORK, NEW YORK
BEYER BLINDER BELLE ARCHITECTS & PLANNERS, NEW YORK OFFICE
828 - 850 Madison Avenue - High-End Retail Storefront & Interior Renovation - Landmark
NEW YORK, NEW YORK
BEYER BLINDER BELLE ARCHITECTS & PLANNERS, NEW YORK OFFICE
828 - 850 Madison Avenue - High-End Retail Storefront & Interior Renovation - Landmark
NEW YORK, NEW YORK
BEYER BLINDER BELLE ARCHITECTS & PLANNERS, NEW YORK OFFICE
828 - 850 Madison Avenue - High-End Retail Storefront & Interior Renovation - Landmark
NEW YORK, NEW YORK
BEYER BLINDER BELLE ARCHITECTS & PLANNERS, NEW YORK OFFICE
Grand Central - Terminal Expansion / Feasibility
NEW YORK, NEW YORK
BEYER BLINDER BELLE ARCHITECTS & PLANNERS, NEW YORK OFFICE
Grand Central - Terminal Expansion / Feasibility
NEW YORK, NEW YORK
BEYER BLINDER BELLE ARCHITECTS & PLANNERS, NEW YORK OFFICE
Metropolitan Museum of Art (MET) - Security Design - Landmark
NEW YORK, NEW YORK
BEYER BLINDER BELLE ARCHITECTS & PLANNERS, NEW YORK OFFICE
Maritime Aquarium & Theater at Norwalk
Norwalk, Connecticut
BEYER BLINDER BELLE ARCHITECTS & PLANNERS, NEW YORK OFFICE
692-694 Broadway - Exterior Retail Entrance - Landmark
NEW YORK, NEW YORK
BEYER BLINDER BELLE ARCHITECTS & PLANNERS, NEW YORK OFFICE
26 W 17th Street - Entrance Alteration & 111 Fifth Avenue - Retail Accessibility Improvement
NEW YORK, NEW YORK
BEYER BLINDER BELLE ARCHITECTS & PLANNERS, NEW YORK OFFICE
689 - 691 Fifth Avenue / Retail Storefront
NEW YORK, NEW YORK
BEYER BLINDER BELLE ARCHITECTS & PLANNERS, NEW YORK OFFICE
680 Madison Avenue / Retail Awning Alteration
NEW YORK, NEW YORK
BEYER BLINDER BELLE ARCHITECTS & PLANNERS, NEW YORK OFFICE
Pattison Place / Office Interior
PHILADELPHIA, PENNSYLVANIA
BEYER BLINDER BELLE ARCHITECTS & PLANNERS, NEW YORK OFFICE
2551 Broadway / Residential Tower
NEW YORK, NEW YORK
BEYER BLINDER BELLE ARCHITECTS & PLANNERS, NEW YORK OFFICE
14 Lecount Place / Residential Tower
NEW YORK, NEW YORK
BEYER BLINDER BELLE ARCHITECTS & PLANNERS, NEW YORK OFFICE
Feasibility Studies - Residential & Mixed Use Development
GREATER NEW YORK, NEW YORK
Located in the heart of downtown Toronto, the site has a strong
architectural potential for public urban develoment. Currently, the
site is domintaed by a series of buildings that only provides front and
back entrances. Accordingly, the site provides a very limited circulation
to the pedestrians. In order to correct this issue, the building
is strategically designed with a series of programmatric stacking
with the main podium raised. The building attemps to makes a
statement that addresses the ciruclation issuses around the site.
ACADEMIC WORK
LARGE MIXED-USE TOWER
TORONTO, CANADA
VIEW OF PUBLIC SQUARE FROM RETAIL STORE
VIEW OF PUBLIC LOBBY AND STAIRCASES
VIEW OF PUBLIC SQUARE ON GROUND FLOOR
VIEW OF MODERN SCULPTURE GALLERY
ACADEMIC WORK
LARGE MIXED-USE TOWER
TORONTO, CANADA
LIVE+WORK / OFFICE PLAN
TYPICAL OFFICE PLAN
ACADEMIC WORK
LARGE MIXED-USE TOWER
TORONTO, CANADA
WEST DETAILED SECTION
EAST SECTION
CONCEPTUAL DIAGRAMS
PROGRAMS
ACADEMIC WORK
LARGE MIXED-USE TOWER
TORONTO, CANADA
STREET ELEVATION FROM YOUNG STREET IN TORONTO
RENDERED SITE PLAN WITH GROUN FLOOR PLAN OF THE TOWER
GROUND LEVEL VIEW OF THE TOWER / YOUNG AND SPADINA ST / DEVELOPMENT OF PUBLIC SPACE WITHIN BUILDING BLOCK
ACADEMIC WORK
LARGE MIXED-USE TOWER
TORONTO, CANADA
SECTIONAL PERSPECTIVE OF THE PODIUM
STACKING DIAGRAMS
ELEVATIONS
ACADEMIC WORK
LARGE MIXED-USE TOWER
TORONTO, CANADA
RETAIL STOREFRONT FACADE - MASONRY (BRICK) FACADE WITH METAL STOREFRONT
RETAIL STOREFRONT FACADE - METAL PANEL SYSTEM WITH FIN DESIGN DETAILS
RETAIL STOREFRONT FACADE - CURTAIN WALL FACADE WITH METAL AND GLASS CANOPY
RETAIL STOREFRONT FACADE - LIMESTONE CLADDING WITH METAL AND GLASS CANOPY
RETAIL STOREFRONT FACADE -TERRACOTTA CLADDING WITH METAL AND GLASS CANOPY
An entrance is not only an important functional part of architectural design, but also serves as a design element that users experience first as they
enter. With evolving application of various materials for podium design, a series of entrance design studies were conducted to explore design and
materiality. Without categorizing a material into a certain type of architectural style or type, masonry, metal, glass, limestone and terracotta cladding
materials were explored, often in mixture, with consideration of user’s experience and functionality that can be applied to various building typologies.
PERSONAL & INDEPENDENT WORK
Podium Envelope - Entrance Facade
FEASIBILITY STUDIES
Tower forms and massing are explored and defined through early design process. General form exploration of tower typology gives designer and
opportunity to examine its relationship to site, skyline and its efficiency on floor plans. Deriving from strong interest in tower forms and envelopes,
conceptual & explorational studies were conducted to explore the massing, form and envelope’s language in relation to their impacts on floor plans.
PERSONAL & INDEPENDENT WORK
Tower Form, Massing & Envelope
FEASIBILITY STUDIES
BRONZE FINISHED PANELS WITH FLUTED DETAILS,
COVE LIGHTING AND TILE FLOORING
WOOD VENEER PANELS WITH GRIDED DETAILS
AND GRANITE FLOORING
CURVED METAL PANELS WITH FLUTED DETAILS
AND TILE FLOORING
PERFORATED METAL PANELS WITH GRATED
FLOORING AND FINISHES
Elevator lobby design is an important design element that is being used consistently by the users of the building. Users experience unique spatial
experience as they enter, use and exit this important intermediate interior space. By exploring different materiality, design language, details and elements,
a series of lobby interior design concepts was explored and developed. Resulting design each shows unique spatial experience and design language.
PERSONAL & INDEPENDENT WORK
Interior - Elevator Lobby Designs
CONCEPTUAL DESIGN WORK
MODULAR EXTERIOR METAL FACADE PANELS WITH GRIDED FRAME DETAILS
TERRACOTTA HORIZONTAL SPANDREL PANELS & VERTICAL METAL EXTERIOR
FINISH PANELS WITH FRAMED FLUTED DETAILS
REEDED TERACOTTA & METAL SPANDRAL PANELS WITH HORIZONTAL
PHOTOVOLTAIC (PV) INTEGRATED GLASS FINS
Exterior facade design in large scale buildings provides a unique opportunity for an architect to design efficient and well thought-out design details.
With various building typologies in mind, a series of conceptual exterior facade envelope design was explored and subsequently developed. Various
exterior building materials were explored to create a unique facade system. Subsequently, modular facade design was developed and visualized with
materials such as terracotta, glass and metal panels. The ideas of framing, horizontality, verticality and fluted design details were incorporated in schemes.
PERSONAL & INDEPENDENT WORK
Exterior Envelope - Facade Designs
CONCEPTUAL DESIGN WORK
This conceptual large-scale interior lobby was designed with a series of defined architectural design elements that emphasize a unique spatial experience.
Among noted design elements are vaulted ceiling, custom-lit aperture around interior columns, large custom-cut stone feature wall, reception desk, railing
and escalator enclosure design, circulation space, security gate, elevator lobby, revolving door and greenery enclosure. Custom white marble tile flooring
with black octagonal joint detailing, brings modern yet classically detailed elements to the lobby. Incorporation of greenary enclosures adds sustainable
features to the lobby. The custom vaulted ceiling conceals MEP and structures above and the featured lobby wall is defined by custom-cut geometric stone.
PERSONAL & INDEPENDENT WORK
Commercial Interior Lobby Design
CONCEPTUAL STUDIES
BRUSHED STEEL DARK GREY FINISH
SEMI-GLOSS WHITE FINISH
LAMINATED CLEAR GLASS RAILING
N
CUSTOM CUT GEOMETRIC STONE
WHITE MARBLE TILE WITH BLACK
OCTAGONAL JOINT DETAILING
Overall material palette of the lobby design includes brushed steel dark grey finishes and semi-gloss white finishes for ceiling, interior enclosures and trims.
Laminated clear glass is used for the railing. The lobby design is accentuated by the grand scale of the design elements, such as futuristic vaulted ceiling and
highly detailed elevator lobby design, which is influenced by the main lobby space. The grand scale of lobby allows for application in various typologies.
Beyond the open-concept reception desk area, the space is designed for various potential functions, such as interior retail frontage, digital information display
wall, circulation connection space to transit or BOH area. The structural columns are enclosed with lighting above that accentuates verticality of the space.
PERSONAL & INDEPENDENT WORK
Commercial Interior Lobby Design
CONCEPTUAL STUDIES
PERSONAL & INDEPENDENT WORK
Commercial Interior Lobby Design
CONCEPTUAL STUDIES
PERSONAL & INDEPENDENT WORK
Commercial Interior Lobby Design
CONCEPTUAL STUDIES
PERSONAL & INDEPENDENT WORK
Retail Display Table
CONCEPTUAL DESIGN WORK
3,525 SQ. FT. (327.4 SQ. M.)
PERSONAL & INDEPENDENT WORK
Residential Layout - Revision Mark-Up
CONFIDENTIAL - NEW YORK CITY
ERIC LEE
EXTENDED PORTFOLIO
LEED AP BD+C, WELL AP & ASSOC. AIA
Contact Information:
1-646-853-6672 / Eric_07091@hotmail.com
151 East 81st Street Apt5a, New York, NY, 10028, USA
Https://www.ericleearch.com
U.S Permanent Resident / Canadian