Irradiation in 2006 is at reach<br />

2 0 0 4 2 0 0 5 2 0 0 6<br />

D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J<br />

License BAG clearance request HRS CGS Inactive Active<br />

NAGRA Waste spec.<br />

HSK Transport spec. Hotlab spec.<br />

Clearance <strong>PSI</strong> Design Manual Update Reports<br />

Beamline Funnel/Geno Integration<br />

Catcher Commissioning<br />

VIMOS Integration Testing<br />

Slit Integration Testing<br />

Transmission<br />

STK/TKE Filters/Ventilation Concept Procurement Assembly Implementation<br />

Inertisation Procurement Implementation<br />

TKE Coolers Design Procurement Implementation<br />

Cables Implementation Implementation<br />

Piping Implementation Implementation<br />

2nd Enclosure Concept Design Procurement Implementation<br />

Shutdown Shutdown Shutdown<br />

SINQ SINQ Beam Diagnostics Tests Beam on<br />

Storage<br />

Control Com Com Test Integration Test Com<br />

MITS System WCL HRS F&D Target CGS Target<br />

HRS IWCL Ship <strong>PSI</strong><br />

ICL Test Ship <strong>PSI</strong><br />

Target Manufacturing Assembly Test Ship<br />

<strong>PSI</strong><br />

EMPS EMPS Assembly Test Ship<br />

EMPS Power/Electronic ATEA Ship<br />

<strong>PSI</strong><br />

F&D Syst ENEA/<strong>PSI</strong> Order Purchase Assembly Ship<br />

CGS Design Procurement Assembly Test Ship<br />

<strong>PSI</strong><br />

IGS Concept Design Procurement Assembly Test<br />

Handling MITS-SINQ Concept Design Wippe Manufacturing Test<br />

SINQ-Storage Design Design Manufacturing<br />

Storage-ZWILAG Concept Design Manufacturing Test<br />

ZWILAG Concept Design Manufacturing Test<br />

ZWILAG-HL Concept Design Design Manufacturing Test<br />

HOTLAB Concept Design Design Manufacturing Test<br />

Disposal Concept and Specification Update of Specs<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/32