BENE Workshop<br />

<strong>The</strong> <strong>PSI</strong>/<strong>MEGAPIE</strong> <strong>target</strong><br />

F. Groeschel<br />

on behalf of the <strong>MEGAPIE</strong> team<br />

Department<br />

of Energy<br />

DESY - November 3, 2004 <strong>MEGAPIE</strong>-TEST<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/1


Department<br />

of Energy<br />

<strong>MEGAPIE</strong>-TEST<br />

Project Participation<br />

Design<br />

Target: SUBATECH; CEA<br />

EMPS: IPUL/RIGA<br />

Ancillary S.: <strong>PSI</strong>, ENEA, Ansaldo<br />

Manufacturing<br />

Target: ATEA, <strong>PSI</strong><br />

EMPS: IPUL<br />

Ancillary S.: <strong>PSI</strong>, CRIOTEC<br />

Testing<br />

Integral Test: <strong>PSI</strong><br />

Irradiation in SINQ<br />

PIE at <strong>PSI</strong>, CEA, SCK, JAERI,<br />

KAERI, LANL, ENEA<br />

Design Support: Safety & Reliability, Neutronics, <strong>The</strong>rmal Hydraulics, <strong>The</strong>rmal<br />

Mechanics, LM Technology, S/L Interface, Materials and Radiation Damage<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/2


<strong>PSI</strong> Accelerator<br />

Facility<br />

590 MeV, 1.8 mA<br />

CW proton<br />

accelerator<br />

575 MeV, 1.25 mA<br />

spallation neutron<br />

source<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/3


SINQ Spallation Neutron Source<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/4


SINQ Target Block with Cold Box and Top Shielding<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/5


<strong>The</strong> SINQ Moderator Tank<br />

Shielding (cooled)<br />

DO<br />

2<br />

Cold Neutron Port<br />

(+1535)<br />

HO<br />

2<br />

<strong>The</strong>rmal Neutron Port<br />

(+1350)<br />

(Intermediate Energy)<br />

Neutron Port<br />

(+1400)<br />

D-Suorce<br />

2<br />

Insertion Port<br />

(+1535)<br />

DO Reflector<br />

2<br />

<strong>The</strong>rmal Neutron Port<br />

(+1585)<br />

Target<br />

D Cold Moderator<br />

2<br />

Central Tube<br />

HO-Scatterer<br />

2<br />

Insertion Port<br />

(+1375)<br />

Neutron Guides<br />

(+1535)<br />

(Intermediate Energy)<br />

Neutron Port<br />

(+1350)<br />

Mod-Tank.cdr /27.9.99/GK87<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/6


SINQ and Target<br />

SINQ Target Block Solid Target<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/7<br />

DY,13.12.99<br />

A<br />

12<br />

9<br />

6<br />

C<br />

1<br />

14<br />

11<br />

8<br />

5<br />

3<br />

13<br />

10<br />

7<br />

4<br />

2<br />

B<br />

Proton Beam<br />

12.8<br />

22.08<br />

Rod Including samples<br />

A Hg Capsules<br />

B Pb-Bi Capsules<br />

C Pb-Bi Capsules<br />

1 Tensile, Fatigue, TEM<br />

2 Tensile, Fatigue, TEM<br />

3 Tensile, Fatigue, TEM<br />

4 Bend bar, Tensile, TEM<br />

5 Tensile, TEM<br />

6 CT, Tal-clad W, SiC SANS<br />

7 Bend bar, Tensile, TEM<br />

8 Fatigue, SANS, TAP<br />

9 Carbon fibre samples<br />

10 Bend bar, Tensile, TEM<br />

11 Charpy samples<br />

12 Charpy samples<br />

13 Charpy samples<br />

14 Charpy samples<br />

Note: <strong>The</strong> materials of the<br />

samples are Steel, Inconel<br />

Zircaloy mainly.<br />

<strong>The</strong>rmocouple


SINQ Target Irradiation Program<br />

Spallation Targets<br />

Fusion Materials<br />

Generation IV reactors<br />

Proton Beam<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/8<br />

DY,13.12.99<br />

A<br />

12<br />

9<br />

6<br />

C<br />

1<br />

14<br />

11<br />

8<br />

5<br />

3<br />

13<br />

10<br />

7<br />

4<br />

2<br />

B<br />

Rod<br />

12.8<br />

22.08<br />

Including samples<br />

A Hg Capsules<br />

B Pb-Bi Capsules<br />

C Pb-Bi Capsules<br />

1 Tensile, Fatigue, TEM<br />

2 Tensile, Fatigue, TEM<br />

3 Tensile, Fatigue, TEM<br />

4 Bend bar, Tensile, TEM<br />

5 Tensile, TEM<br />

6 CT, Tal-clad W, SiC SANS<br />

7 Bend bar, Tensile, TEM<br />

8 Fatigue, SANS, TAP<br />

9 Carbon fibre samples<br />

10 Bend bar, Tensile, TEM<br />

11 Charpy samples<br />

12 Charpy samples<br />

13 Charpy samples<br />

14 Charpy samples<br />

Note: <strong>The</strong> materials of the<br />

samples are Steel, Inconel<br />

Zircaloy mainly.<br />

<strong>The</strong>rmocouple


Exchange flask<br />

positioning base<br />

950<br />

SINQ <strong>target</strong><br />

main dimensions<br />

and clearances<br />

to surroundings<br />

MP_basic conceot.ppt<br />

Target<br />

transport<br />

sleeve<br />

Exchange flask gate valve<br />

Bottom of <strong>target</strong> storage pit<br />

max<br />

420<br />

440<br />

403<br />

212<br />

970<br />

570,5<br />

SINQ Target<br />

Highest hook position<br />

in exchange flask<br />

32<br />

2110,5<br />

4394<br />

103<br />

86,5 219 550,5<br />

4996,5<br />

Top of proton beam collimator<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/9


Gain in Neutron Yield<br />

Total<br />

Target Int.<br />

Cladding<br />

D2O<br />

Container<br />

-0.248<br />

- 1.23<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/10<br />

Net<br />

Neutrons per Proton<br />

Increase of >40% compared to current solid lead <strong>target</strong><br />

Pb/steel<br />

7.62<br />

- 0.113<br />

- 1.01<br />

- 0.044<br />

6.17<br />

LBE<br />

10.99<br />

- 0.232<br />

- 0.635<br />

- 0.401<br />

8.49<br />

E. Pitcher et al.: Icans-XVI, 2003


<strong>MEGAPIE</strong> Objectives<br />

An experiment to to be carried out in the SINQ <strong>target</strong><br />

location to demonstrate the safe operation of a liquid<br />

metal (LBE) spallation <strong>target</strong> of<br />

about 1 MW beam power.<br />

�Demonstration of feasibility for<br />

future ADS development<br />

�Increase neutron flux for SINQ<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/11


<strong>MEGAPIE</strong> Target<br />

Dimensions<br />

Length: 5.35.m Weight: 1.5 t<br />

LBE volume: 82 l Gas Volume: 2 l<br />

Design pressure: 16/10 bar Operating pressure: 0-3.2 bar<br />

Design Temperature: 400ºC Insulation Gas: 0.5 bar He<br />

Materials<br />

Lower Liquid Metal Container: T91<br />

Upper Container: 316L<br />

Lower Target Enclosure: AlMg3<br />

Heat Removal and Beam Window Cooling<br />

Deposited Heat: 650 kW<br />

Forced convection assisted by buoyancy<br />

Main pump: EM in-line pump (4l/sec)<br />

Bypass pump: EM in-line pump (0.35l/sec)<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/12


<strong>MEGAPIE</strong> Target Concept<br />

Liquid Metal Container<br />

• Upper Container (316L, Body of THX)<br />

• Lower Container with beam entrance window (T91)<br />

LBE Flow Control<br />

• Main Flow and Bypass Flow Guide Tubes<br />

• EMPS with inline Main Pump and Bypass Pump<br />

• Target Heat Exchanger<br />

Temperature Control<br />

• Central Rod with 20 kW Heater<br />

Outer Enclosure (2nd barrier)<br />

Target Head<br />

Upper <strong>target</strong> enclosure<br />

Lower <strong>target</strong> enclosure with beam entrance window (AlMg3)<br />

Large differential thermal expansion and high stresses due to thermal<br />

gradients (static and dynamic during beam trips)<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/13


Nuclear Assessment<br />

10 14<br />

Proton Flux, 1.74 mA <strong>The</strong>rmal Neutron Flux<br />

1400 10 11<br />

E


Heat Exchanger (Oil)<br />

10 i/s, 5.5 m/s<br />

140-175°C inside<br />

Mass Flow and Temperatures<br />

Main Pump<br />

4 l/s, 1.2 m/s<br />

380°C<br />

Guide Tube<br />

4 l/s, 0.33 m/s<br />

380°C<br />

Downcomer<br />

3.75 l/s, 0.33<br />

m/s<br />

230-240°C<br />

Beam Window<br />

380°C outside<br />

330°C inside<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/15<br />

L<br />

F<br />

F<br />

Heat Exchanger<br />

4 l/s, 0.33 l/s/pin<br />

0.46 m/s<br />

LBE 380-230°C<br />

Bypass Pump<br />

0.25 l/s, 0.2 m/s<br />

230°C<br />

Bypass Tube<br />

0.25 l/s, 1m/s<br />

230-240°C<br />

Nozzle 1.2 m/s<br />

Beam Window 1 m/s


Heat Deposition [MW/m**3]<br />

1000<br />

900<br />

800<br />

700<br />

600<br />

500<br />

400<br />

300<br />

200<br />

100<br />

0<br />

<strong>The</strong>rmohydraulics – CFD simulations<br />

0 0.05 0.1 0.15 0.2 0.25 0.3 0.35<br />

Material<br />

LBE<br />

Window<br />

T91 Hull<br />

Guide tube<br />

Total<br />

FLUKA<br />

[kW]<br />

705.8<br />

5.56<br />

2.68<br />

5.55<br />

719.6<br />

Height [m]<br />

CFX-4.3<br />

[kW]<br />

709.9<br />

5.28<br />

1.21<br />

6.03<br />

722.4<br />

1.74 mA<br />

FLUKA<br />

CFX-4.3<br />

Beam<br />

1.74 mA<br />

1.4 mA<br />

Maj. Axis<br />

= Bypass<br />

⊥ Bypass<br />

= Bypass<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/16<br />

LBE<br />

422.7<br />

424.1<br />

384.4<br />

T peak [C]<br />

Guide T.<br />

368.2<br />

363.1<br />

339.4<br />

C. Rod<br />

386.8<br />

389.5<br />

355.7<br />

Window<br />

370.2<br />

360.3<br />

342.5<br />

T. Dury, <strong>PSI</strong>, 2003


A. Zucchini, ENEA<br />

Stress Analysis<br />

63 MPa<br />

52 MPa<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/17


Rectangular<br />

Elliptical<br />

Robust Nozzle Geometry<br />

Velocity vectors in symmetry plane<br />

Extended<br />

Round<br />

Offset<br />

Vertical<br />

Verification in KILOPIE experiment (Infrared and HETSS)<br />

P. Roubin, CEA<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/18


Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/19


Electromagnetic Pump System<br />

Main Pump Prototype Test<br />

� Confirmation of calculated peformance<br />

� No cavitation up to 8 l/s at 450ºC<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/20<br />

pressure, bar<br />

0.4<br />

0.3<br />

0.2<br />

0.1<br />

0.0<br />

Test Sect<br />

hydr resist<br />

calculation<br />

Test<br />

15A<br />

20A<br />

25A<br />

0 2 4 6 8 10<br />

LBE flowrate, l/s<br />

37A<br />

30A<br />

EMP,<br />

pressure<br />

calculation


Electromagnetic Pump System<br />

Strong distortions and corresponding<br />

Stresses due to differential thermal expansion<br />

of pump housing require complete redesign<br />

� Uncoupling of shells by bellows<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/21


Ancillary Systems and 2 nd Containment in TKE<br />

Second containment for<br />

ancillary systems with<br />

radioactive inventory<br />

He puffer gas < 0.9 bar<br />

Continuous monitoring<br />

Target with second enclosure<br />

Ar/He insulation gas


Diphyl THT Oil Loop<br />

• Design by Ansaldo<br />

• Manufacture and Assembly<br />

at CRIOTEC<br />

Intermediate Water Loop<br />

• Design by LIER<br />

• Manufacture and Assembly by<br />

Simulation by RELAP M/<br />

SIMULINK<br />

Heat Removal System<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/23


Coolant<br />

Flow rate, kg/s<br />

Simulation of Main-Pump Trip<br />

Main<br />

Flow<br />

LBE<br />

23.2<br />

New Steady State<br />

Reached at ~150 sec.<br />

Bypass<br />

EMP<br />

LBE<br />

2.43<br />

Oil<br />

Pump<br />

DTHT<br />

8.0<br />

Equilibrium Conditions after Transient:<br />

Coolant<br />

T Inlet , °C<br />

T Outlet , °C<br />

Water<br />

Pump<br />

Water<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/24<br />

8.0<br />

Hot<br />

LBE<br />

397.<br />

230.<br />

THX<br />

Cold<br />

DTHT<br />

161.<br />

197.<br />

W. Leung, <strong>PSI</strong><br />

Hot<br />

DTHT<br />

197.<br />

113.<br />

IHX<br />

Cold<br />

Water<br />

49.5<br />

67.1<br />

Hot<br />

Water<br />

67.5<br />

46.0<br />

SHX<br />

Cold<br />

Water<br />

30.0<br />

47.7


Integral Test<br />

Temperature transients of the a protected<br />

beam trip (a) nominal (b) 200kW<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/25


Cover Gas System<br />

Design completed by Ansaldo<br />

Manufacturing by Criotec<br />

Gas sampling<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/26


Inactive Fill&Drain System<br />

P&ID for<br />

test stand<br />

Designed by ENEA<br />

Manufacturing by<br />

Criotec<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/27


View of TKE<br />

HEAT REMOVAL<br />

SYSTEM<br />

TARGET HEAD<br />

SMALL BOX<br />

IGS:<br />

STEAM CONDENSER<br />

FILL & DRAIN<br />

SYSTEM<br />

COVER GAS<br />

SYSTEM<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/28


Beam Diagnostics<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/29


Licensing Process<br />

PSAR and Request for Licensing submitted Jun 2002<br />

Licensing Statement Nov 2004<br />

Clearance required for<br />

� Operation of Heat Removal System (HRS)<br />

� Operation of Gas System (CGS)<br />

� Inactive Operation and Testing of Target System<br />

� Dismantling and Transport to SINQ<br />

� Active Operation in SINQ<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/30


BAG Statement and Requirements<br />

Radiologic impact of operation according to PSAR is<br />

acceptable<br />

Definition of a enveloping reference accident case<br />

� Breach of <strong>target</strong>, oil circuit and moderator tank<br />

� Oil fire in STK � inertisation<br />

� Damage of <strong>target</strong> creates link between TKE and<br />

STK<br />

49 Prerequisites<br />

� Gas tight upgrade of TKE and STK as final barrier<br />

�Reduced source term<br />

�Reference dose < 1 mSv<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/31


Irradiation in 2006 is at reach<br />

2 0 0 4 2 0 0 5 2 0 0 6<br />

D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J<br />

License BAG clearance request HRS CGS Inactive Active<br />

NAGRA Waste spec.<br />

HSK Transport spec. Hotlab spec.<br />

Clearance <strong>PSI</strong> Design Manual Update Reports<br />

Beamline Funnel/Geno Integration<br />

Catcher Commissioning<br />

VIMOS Integration Testing<br />

Slit Integration Testing<br />

Transmission<br />

STK/TKE Filters/Ventilation Concept Procurement Assembly Implementation<br />

Inertisation Procurement Implementation<br />

TKE Coolers Design Procurement Implementation<br />

Cables Implementation Implementation<br />

Piping Implementation Implementation<br />

2nd Enclosure Concept Design Procurement Implementation<br />

Shutdown Shutdown Shutdown<br />

SINQ SINQ Beam Diagnostics Tests Beam on<br />

Storage<br />

Control Com Com Test Integration Test Com<br />

MITS System WCL HRS F&D Target CGS Target<br />

HRS IWCL Ship <strong>PSI</strong><br />

ICL Test Ship <strong>PSI</strong><br />

Target Manufacturing Assembly Test Ship<br />

<strong>PSI</strong><br />

EMPS EMPS Assembly Test Ship<br />

EMPS Power/Electronic ATEA Ship<br />

<strong>PSI</strong><br />

F&D Syst ENEA/<strong>PSI</strong> Order Purchase Assembly Ship<br />

CGS Design Procurement Assembly Test Ship<br />

<strong>PSI</strong><br />

IGS Concept Design Procurement Assembly Test<br />

Handling MITS-SINQ Concept Design Wippe Manufacturing Test<br />

SINQ-Storage Design Design Manufacturing<br />

Storage-ZWILAG Concept Design Manufacturing Test<br />

ZWILAG Concept Design Manufacturing Test<br />

ZWILAG-HL Concept Design Design Manufacturing Test<br />

HOTLAB Concept Design Design Manufacturing Test<br />

Disposal Concept and Specification Update of Specs<br />

Paul Scherrer Institut • 5232 Villigen <strong>PSI</strong> BENE Workshop, DESY Nov. 2004 GF34/32