CATENARY.<br />
STILL ON TRACK FOR SUCCESS:<br />
SOUTH KOREA AND <strong>THE</strong> UNITED KINGDOM<br />
Under Michael's direction and together with his wife Astrid, senior boss Fritz (until 2021) and since<br />
2016 also with his nephew Nikolas Weitz as representative of the fourth generation, success continues<br />
to follow success. Therefore, only a selection of milestones and flagship projects from the past<br />
three decades since the start of production in Burgellern follows:<br />
<strong>ZECK</strong>'s machines were sold through SIEMENS with great success. Since 1995, this is also done directly.<br />
An important milestone was <strong>ZECK</strong>'s entry into the catenary business. In 1996, the first major<br />
project was the electrification of the TGV line from Seoul to Busan. In cooperation with WINDHOFF<br />
railway and infrastructure construction, the high-speed line was rebuilt and electrified.<br />
A second beacon project in this area was West Coast Main Line in the UK in 2000/2001. This involved<br />
replacing the existing catenary during ongoing operations within time frames of just five<br />
hours. The skills acquired here are being incorporated into a project involving eight catenary installation<br />
units for the Swiss Federal Railways SBB.<br />
Das Joint Venture mit WINDHOFF für die TGV-Strecke in Südkorea<br />