CATENARY.<br />

STILL ON TRACK FOR SUCCESS:<br />

SOUTH KOREA AND <strong>THE</strong> UNITED KINGDOM<br />

Under Michael's direction and together with his wife Astrid, senior boss Fritz (until 2021) and since<br />

2016 also with his nephew Nikolas Weitz as representative of the fourth generation, success continues<br />

to follow success. Therefore, only a selection of milestones and flagship projects from the past<br />

three decades since the start of production in Burgellern follows:<br />

<strong>ZECK</strong>'s machines were sold through SIEMENS with great success. Since 1995, this is also done directly.<br />

An important milestone was <strong>ZECK</strong>'s entry into the catenary business. In 1996, the first major<br />

project was the electrification of the TGV line from Seoul to Busan. In cooperation with WINDHOFF<br />

railway and infrastructure construction, the high-speed line was rebuilt and electrified.<br />

A second beacon project in this area was West Coast Main Line in the UK in 2000/2001. This involved<br />

replacing the existing catenary during ongoing operations within time frames of just five<br />

hours. The skills acquired here are being incorporated into a project involving eight catenary installation<br />

units for the Swiss Federal Railways SBB.<br />