ELEKTROCIEPŁOWNIA „ZIELONA GÓRA” S.A.
ELEKTROCIEPŁOWNIA „ZIELONA GÓRA” S.A.
ELEKTROCIEPŁOWNIA „ZIELONA GÓRA” S.A.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Raport Roczny<br />
Annual Report 2009<br />
<strong>ELEKTROCIEPŁOWNIA</strong><br />
<strong>„ZIELONA</strong> <strong>GÓRA”</strong> S.A.<br />
Grupa EDF<br />
2009
2 0 0 9<br />
Raport Roczny<br />
Annual Report<br />
Spis treści<br />
Table of contents<br />
<strong>ELEKTROCIEPŁOWNIA</strong><br />
<strong>„ZIELONA</strong> <strong>GÓRA”</strong> S.A.<br />
List Prezesa 3<br />
The Letter of the President<br />
Informacje ogólne o Spółce 4<br />
General information about the Company<br />
Schemat organizacyjny 5<br />
Organization of the Company<br />
Organy Spółki 6<br />
Company Authorities<br />
Zatrudnienie / Szkolenia 8<br />
Employment / Training<br />
Zagadnienia BHP 9<br />
Work safety<br />
Produkcja energii 10<br />
Energy production<br />
Sprzedaż energii 11<br />
Energy sale<br />
Eksploatacja 12<br />
Operation and maintenance<br />
Ochrona środowiska 14<br />
Environment protection<br />
Projekty EC ZG 17<br />
EC ZG Projects<br />
Rozwijanie rynku ciepła sieciowego w Zielonej Górze 18<br />
Developing network heat market in Zielona Góra<br />
Grupa kapitałowa EC „Zielona Góra” S A 20<br />
EC “Zielona Góra” S A capital group<br />
Kształtowanie wizerunku Spółki 22<br />
Developing Company’s image<br />
Raport ekonomiczno-finansowy 24<br />
Financial report
Elektrociepłownia stanowi dla miejskiego<br />
systemu ciepłowniczego Zielonej Góry<br />
jedyne źródło pokrycia potrzeb w zakresie<br />
ogrzewania i ciepłej wody użytkowej.<br />
Po połączeniu z ZEC jest również właścicielem<br />
sieci ciepłowniczej miasta oraz dystrybutorem<br />
i dostawcą ciepła.<br />
Elektrociepłownia is the only provider of heat and hot water<br />
for the municipal heat distribution system in Zielona Góra<br />
and the Company fully meets the city’s demand.<br />
After the merger with ZEC the Company became the owner<br />
of the heat distribution system and hence at present<br />
is also responsible for the supply.<br />
Szanowni Państwo!<br />
Pomimo światowej recesji gospodarczej w 2009 r. Elektrociepłownia „Zielona Góra”<br />
osiągnęła dobry wynik finansowy. Złożyły się na to większe przychody wynikające<br />
z optymalizacji oraz poprawy efektywności.<br />
Podobnie jak i w poprzednich latach Spółka realizowała zadania związane z unowocześnianiem<br />
i rozwojem przedsiębiorstwa.<br />
Od kwietnia 2009 r., po połączeniu z Zielonogórską Energetyką Cieplną Sp. z o.o.,<br />
Elektrociepłownia jest właścicielem sieci ciepłowniczej, dystrybutorem i bezpośrednim<br />
dostawcą ciepła do odbiorców. Na miejskim rynku ciepła EC ZG jest niekwestionowanym<br />
liderem.<br />
Połączenie spółek umożliwiło realizację projektu związanego z rozbudową i modernizacją<br />
sieci ciepłowniczej. Efekty w postaci zwiększenia bezpieczeństwa dostaw<br />
ciepła, a przede wszystkim znacznego ograniczenia strat przesyłowych, dają Spółce<br />
możliwość uzyskania unijnej dotacji poprzez Narodowy Fundusz Ochrony Środowiska<br />
i Gospodarki Wodnej.<br />
Elektrociepłownia rozpoczęła również proces inwestycyjny związany z modernizacją<br />
Bloku Węglowego. Dzięki wymianie kotłów węglowych na olejowo - gazowe już<br />
w 2012 r. Spółka zrezygnuje całkowicie ze spalania węgla. Zniknie wiele uciążliwości<br />
dla środowiska naturalnego, poprawią się warunki pracy. Również na realizację tego<br />
projektu Elektrociepłownia ubiega się o dotację z NFOŚiGW.<br />
Zrealizowanie obu projektów modernizacyjnych przyczyni się do stworzenia najnowocześniejszego<br />
w Polsce systemu ciepłowniczego, zasilanego gazem ze złóż krajowych<br />
(EC ZG posiada kontrakt na dostawę gazu z Polskim Górnictwem Naftowym i Gazownictwem<br />
do 2024 r.), spełniającego wszystkie najostrzejsze normy środowiskowe UE,<br />
które będą obowiązywać od 2016 r.<br />
Więcej informacji dotyczących działalności Spółki w 2009 r. znajdą Państwo na kolejnych<br />
stronach. Serdecznie zapraszam do lektury Raportu.<br />
Ladies and gentleman,<br />
Despite recession in the world economy Elektrociepłownia “Zielona Góra” obtained<br />
a good financial result in 2009. This was possible thanks to higher income resulting<br />
from optimization and improvement of efficiency.<br />
As it had been the case in the previous years, the Company continued to realize modernization<br />
and development tasks.<br />
In April 2009, in result of the merger with Zielonogórska Energetyka Cieplna Sp. z o.o.,<br />
Elektrociepłownia became the owner of the heat distribution network, a distributor<br />
and a direct provider of heat to end users. EC ZG is the unquestionable leader on the<br />
city’s heat engineering market.<br />
The merger of the companies enabled the realization of the project of extension and<br />
modernization of the heat distribution network. The results of the project consisting in<br />
higher heat supply security and above all lower transmission losses give the Company<br />
the opportunity to take advantage of the EU subsidies granted by the National Fund for<br />
Environment Protection and Water Management.<br />
Elektrociepłownia has also started another investment project consisting in modernization<br />
of the Coal Unit. The replacement of old coal boilers by the new ones supplied<br />
by gas and oil will allow for the elimination of combustion of coal in 2012. This will<br />
significantly reduce negative impact on the natural environment and improve work<br />
conditions. Elektrociepłownia has applied to the National fund for Environment Protection<br />
and Water Management for subsidizing this project.<br />
The realization of both modernization projects will contribute to the establishment<br />
of the most modern heat engineering and distribution systems in Poland supplied by<br />
natural gas from local resources (EC ZG has signed a contract with Polskie Górnictwo<br />
Naftowe i Gazownictwo for the supply of gas until 2024) which will meet all the EU<br />
environmental standards operating from 2016.<br />
Further information concerning the Company’s activity in 2009 can be found on the<br />
following pages.<br />
You are cordially welcome to read the Report.<br />
Prezes Zarządu, Dyrektor Generalny<br />
President of the Board, CEO<br />
Marian Babiuch<br />
- -
Elektrociepłownia „Zielona Góra” S.A. jest przedsiębiorstwem energetyki zawodowej<br />
prowadzącym działalność gospodarczą w zakresie skojarzonego wytwarzania<br />
ciepła i energii elektrycznej oraz dystrybucji i dostaw ciepła.<br />
Jako spółka akcyjna powstała 10 sierpnia 199 r. w wyniku przekształcenia<br />
przedsiębiorstwa państwowego w jednoosobową spółkę Skarbu Państwa.<br />
Została zarejestrowana w Krajowym Rejestrze Sądowym przez Sąd Rejonowy<br />
w Zielonej Górze VIII Wydział Gospodarczy pod Nr KRS 00000040284.<br />
W dniu 7 września 2001 r. Spółka została sprywatyzowana. Minister Skarbu Państwa<br />
sprzedał 45% akcji Zespołowi Elektrociepłowni Wrocławskich KOGENERA-<br />
CJA S.A. i Dalkii Termika S.A. Skarb Państwa przekazał nieodpłatnie 15% akcji<br />
Spółki uprawnionym pracownikom. Na mocy umowy z dnia 10 czerwca 200 r.<br />
KOGENERACJA odkupiła od Dalkii Termiki akcje EC ZG.<br />
1 kwietnia 2009 r. doszło do połączenia Elektrociepłowni z Zielonogórską Energetyką<br />
Cieplną Sp. z o.o. Połączenie nastąpiło w drodze przeniesienia całego<br />
majątku ZEC na EC ZG w zamian za akcje utworzone w podwyższonym kapitale<br />
Spółki przejmującej.<br />
Po połączeniu spółek kapitał zakładowy EC ZG wynosi 1 85 150 zł, dzieli<br />
się łącznie na 554 126 akcji. Akcjonariuszami Spółki są KOGENERACJA S.A.<br />
(98,40% akcji EC ZG); gmina Zielona Góra o statusie miejskim (1,47%) oraz 12<br />
osób (0,1 %). Poprzez KOGENERACJĘ Spółka należy do Grupy EDF, światowego<br />
lidera na rynku produkcji i dystrybucji energii.<br />
Odbiorcą produkowanej energii elektrycznej o napięciu 220 kV jest EVE-<br />
REN Sp. z o.o. z siedzibą w Rybniku. Odbiorcą energii elektrycznej o napięciu 6 kV<br />
(z Bloku Węglowego) wytwarzanej w skojarzeniu z produkcją ciepła jest ENEA S.A.<br />
w Poznaniu.<br />
Elektrociepłownia stanowi dla miejskiego systemu ciepłowniczego Zielonej Góry<br />
jedyne źródło pokrycia potrzeb w zakresie ogrzewania i ciepłej wody użytkowej.<br />
Po połączeniu z ZEC jest również właścicielem sieci ciepłowniczej miasta<br />
oraz dystrybutorem i dostawcą ciepła. Struktury dawnego ZEC funkcjonują<br />
w Spółce jako pion pn. Zakład Dystrybucji Ciepła.<br />
W związku z przyłączeniem spółki dystrybucyjnej EC ZG przejęła koncesje<br />
udzielone ZEC na wytwarzanie ciepła w kotłowniach lokalnych, na przesyłanie<br />
i dystrybucję ciepła oraz na obrót ciepłem.<br />
Elektrociepłownia posiada koncesje:<br />
- na wytwarzanie ciepła w urządzeniach wytwórczych ciepła o łącznej mocy<br />
zainstalowanej 22 MW, przy czym 187 MW przypada na Blok Węglowy,<br />
a 1 5 MW na Blok Gazowo - Parowy;<br />
- na wytwarzanie ciepła w 29 kotłowniach lokalnych, opalanych gazem ziemnym,<br />
o łącznej mocy zainstalowanej ,789 MW. Termin ważności koncesji do<br />
1 grudnia 2024 r.;<br />
- na przesyłanie i dystrybucję ciepła z terminem ważności do 1 grudnia 2020 r.<br />
Ponadto EC ZG posiada koncesję na wytwarzanie energii elektrycznej w urządzeniach<br />
o łącznej mocy zainstalowanej 221,4 MW, z czego 2 ,4 MW przypada na<br />
turbogeneratory Bloku Węglowego, a 198 MW na generatory Bloku Gazowo - Parowego.<br />
Koncesja jest ważna do 1 grudnia 2024 r.<br />
Od 1 kwietnia 2008 r. EC „Zielona Góra” korzysta z pomocy publicznej w postaci<br />
otrzymywanych i co roku rozliczanych rekompensat na pokrycie kosztów osieroconych<br />
powstałych po rozwiązaniu KDT. Ma również możliwość korzystania<br />
z dopłat gazowych wynikających z wyższych kosztów gazu w stosunku do kosztów<br />
węgla poniesionych na produkcję energii elektrycznej. Przychody i koszty<br />
EC ZG są ustawowo pod ścisłą kontrolą Urzędu Regulacji Energetyki i stanowią<br />
podstawę wypłat zaliczek na rekompensaty i rozliczeń rekompensat.<br />
- 4 -<br />
<strong>ELEKTROCIEPŁOWNIA</strong><br />
<strong>„ZIELONA</strong> <strong>GÓRA”</strong> S.A. Raport Roczny / Annual Report 2 0 0 9<br />
Elektrociepłownia “Zielona Góra” S.A. is a power engineering company which<br />
conducts business activity in the areas of combined production of heat and electric<br />
energy as well as heat distribution and supply.<br />
Elektrociepłownia “Zielona Góra” S.A. was established as a joint stock company<br />
on August 10th , 199 in result of restructuring of a state company into a sole<br />
shareholder company of the State Treasury. It was registered in the State Court<br />
Register of Companies under the entry KRS 00000040284 in front the 7th Economic<br />
Division of the Zielona Góra District Court.<br />
On September 07th , 2001 the Company was privatized. The Minister of the State<br />
Treasury sold 45% of the shares to Zespół Elektrociepłowni Wrocławskich KO-<br />
GENERACJA S.A. and Dalkia Termika S.A. The State Treasury transferred 15%<br />
of the shares of the Company to authorized employees free of any charges.<br />
On the basis of the agreement of June 10th , 200 , KOGENERACJA purchased the<br />
shares of EC ZG from Dalkia Termika.<br />
On April 01st , 2009 Elektrociepłownia and Zielonogórska Energetyka Cieplna<br />
Sp. z o.o. were combined by transferring all ZEC assets to EC ZG in exchange for<br />
the shares in the increased capital of the overtaking Company.<br />
After the merger the company capital of EC ZG amounts at 1 ,85 ,150 PLN in<br />
554,126 shares. Among the shareholders of the Company there are KOGENER-<br />
ACJA S.A. (98.40% of shares), Zielona Góra district (1.47% of shares) and 12<br />
individual persons (0.1 % of shares). Due to the membership of KOGENERACJA<br />
S.A. in the shareholding structure, the Company is a member of the EDF Group,<br />
a world leader on the markets of energy production and distribution.<br />
EVEREN Sp. z o.o. from Rybnik is the sole receiver of the 220 kV electric energy,<br />
whereas ENEA S.A. from Poznań is the receiver of 6 kV electric energy form the<br />
Coal Unit, produced in combination with heat.<br />
Elektrociepłownia is the only provider of heat and hot water for the municipal<br />
heat distribution system in Zielona Góra and the Company fully meets the city’s<br />
demand. After the merger with ZEC the Company became the owner of the heat<br />
distribution system and hence at present is also responsible for the supply. Form<br />
the organizational point of view the structures of previous ZEC at present function<br />
as the Heat Distribution Department.<br />
In result of the merger of EC ZG and ZEC, EC ZG took over the concessions for<br />
heat production in the local boiler house as well as for the heat transmission<br />
distribution and trade granted to ZEC.<br />
Thus at the moment Elektrociepłownia has concessions for:<br />
- the production of heat in the facilities of the total power of 22 MW, out<br />
of which 187 MW in the Coal Unit and 187 MW and 1 5 MW in CCGT,<br />
- the production of heat in 29 local gas boiler houses of the total power<br />
of .789 MW, valid until December 1st , 2024,<br />
- the transmission and distribution of heat, valid until December 1st , 2020.<br />
Furthermore, EC ZG has the concession for the production of electric energy<br />
in the facilities of the total power of 221.4 MW, out of which 2 .4 MW in the<br />
generators of the Coal Unit and 198 MW in CCGT. The concession is valid until<br />
December 1st , 2024.<br />
From April 01st , 2008 EC “Zielona Góra” has been receiving public support in<br />
the form of annually balanced compensation covering the stranded costs which<br />
occurred after the dissolution of KDT. It also receives gas subsidies resulting<br />
from the difference between the cost of gas and coal used for the production<br />
of electric energy. Both intake as well as costs of EC ZG are subject to the statutory<br />
control of the Energy Regulatory Office and form the basis for the advance<br />
payment as well for balancing compensations.<br />
1 kwietnia 2009 r. nastąpiło połączenie Elektrociepłowni z Zielonogórską Energetyką<br />
Cieplną Sp. z o.o. Połączenie nastąpiło w drodze przeniesienia całego majątku<br />
ZEC na EC ZG w zamian za akcje utworzone w podwyższonym kapitale<br />
Spółki przejmującej.<br />
On April 01 st 2009 Elektrociepłownia and Zielonogórska Energetyka Cieplna Sp. z o.o.<br />
were combined by transferring all ZEC assets to EC ZG in exchange for the shares<br />
in the increased capital of the overtaking Company.<br />
Organisation of the Company<br />
(December 31st Schemat organizacyjny (na dzień 31 grudnia 2009 r.)<br />
, 2009)<br />
Dyrektor Projektu Efektywność<br />
Energetyczna<br />
DP<br />
Z-ca Dyrektora<br />
Technicznego<br />
ds Produkcji DTp<br />
Sekcja<br />
Administracyjna<br />
TA<br />
Wydział Bloku<br />
Gazowo - Parowego<br />
TG<br />
Dyżurny Inżynier<br />
Ruchu<br />
TD<br />
Wydział Bloku<br />
Węglowego<br />
TW<br />
Dział Nawęglania,<br />
Odżużlania<br />
i Transportu Technologicznego<br />
WN<br />
Dział Kotłowo<br />
- Maszynowy<br />
WK<br />
Z-ca Dyrektora<br />
Technicznego<br />
ds Remontów<br />
i Inwestycji DTr<br />
Sekcja ds BHP<br />
i ppoż<br />
GB<br />
Stanowisko ds<br />
Ochrony Radiologicznej<br />
GR<br />
Dyrektor<br />
ds Technicznych<br />
DT<br />
Wydział Ekonomiczno<br />
- Logistyczny<br />
RL<br />
Dział Zaopatrzenia<br />
RZ<br />
Wydział Remontów<br />
i Inwestycji<br />
RR<br />
Dział Remontów<br />
Mechanicznych<br />
i Budowlanych RM<br />
Dział Remontów<br />
Elektrycznych<br />
RE<br />
Sekcja ds Planowania<br />
i Rozliczeń<br />
RP<br />
Wydział<br />
Elektryczny i AKPIA<br />
TE<br />
Z-ca Dyrektora<br />
ds Eksploatacji<br />
CE<br />
Wydział<br />
Eksploatacji<br />
EE<br />
Dział<br />
Rejon Eksploatacji 1<br />
ER-1<br />
Dział<br />
Rejon Eksploatacji 2<br />
ER-2<br />
Dział<br />
Rejon Eksploatacji 3<br />
ER-3<br />
Dział Automatyki<br />
Sieci Ciepłowniczej<br />
EA<br />
Referent<br />
ds Logistyki<br />
EL<br />
Wydział<br />
Produkcji Wody<br />
TC<br />
Dyrektor Zakładu<br />
Dystrybucji Ciepła<br />
DC<br />
Zmiany w strukturze organizacyjnej<br />
W 2009 r. realizowano zadania związane z optymalizacją zatrudnienia i organizacji<br />
pracy, jak również rozszerzeniem działalności Spółki. W lutym powołano<br />
stanowisko Zastępcy Dyrektora Technicznego ds. Remontów i Inwestycji oraz<br />
Zastępcy Dyrektora ds. Produkcji. W marcu 2009 r. Zarząd przyjął projekt Porozumienia<br />
o współpracy KOGENERACJI, ZEC i EC ZG przy Projekcie Efektywność<br />
Energetyczna. W strukturze EC ZG od 1 kwietnia 2009 r. zostało powołane stanowisko<br />
Dyrektora Projektu Efektywność Energetyczna.<br />
Od 1 kwietnia przyjęto nowy schemat organizacyjny uwzględniający przyłączenie<br />
ZEC do EC ZG. Dawny ZEC funkcjonuje w strukturze EC ZG jako nowy pion<br />
pod nazwą Zakład Dystrybucji Ciepła. W październiku Sekcję ds. BHP i ppoż.<br />
oraz Stanowisko ds. Ochrony Radiologicznej przeniesiono z pionu Dyrektora ds.<br />
Handlu i Jakości do pionu Dyrektora Generalnego. 1 grudnia 2009 r. utworzone<br />
stanowisko Zastępcy Dyrektora ds. Handlu i Jakości.<br />
Dyrektor Generalny<br />
DG<br />
Z-ca Dyrektora<br />
ds Obsługi klientów<br />
CK<br />
Wydział Biuro<br />
Obsługi Klientów<br />
KO<br />
Wydział Przygotowania<br />
do Realizacji<br />
Przyłączeń KP<br />
Wydział Inżynierii<br />
Sieci Ciepłowniczej<br />
KI<br />
Sekcja<br />
Administracyjna<br />
CA<br />
Wydział Nadzoru<br />
Sieci Ciepłowniczej<br />
EN<br />
Dyspozycja Ruchu<br />
Sieci Ciepłowniczej<br />
ND<br />
Wydział Planowania<br />
i Bilansowania<br />
Produkcji TP<br />
Dyrektor<br />
ds Handlu i Jakości<br />
DH<br />
Zastępca Dyrektora<br />
Handlu i Jakości<br />
HZ<br />
Wydział Marketingu<br />
i Rozwoju<br />
HM<br />
Zespół Sieci<br />
Magistralnej<br />
NS<br />
Wydział Taryf<br />
i Handlu<br />
HT<br />
Wydział Jakości<br />
i Ochrony Środowiska<br />
HJ<br />
Dział<br />
Kontroli Eksploatacji<br />
PK<br />
Laboratorium<br />
Zakładowe<br />
JL<br />
Biuro Spółki<br />
DB<br />
Kontroler<br />
Wewnętrzny<br />
GK<br />
Dyrektor<br />
ds Finansów<br />
DF<br />
Wydział Księgowości<br />
Ogólnej<br />
FK<br />
Wydział Księgowości<br />
Inwestycyjnej<br />
i Gospodarki Materiałowej<br />
FM<br />
Wydział Finansów<br />
FF<br />
Wydział Budżetu<br />
i Controllingu<br />
FB<br />
Wydział<br />
Informatyki<br />
FI<br />
Doradca<br />
Podatkowy<br />
FP<br />
Dyrektor ds Zasobów<br />
Ludzkich i Administracji<br />
DL<br />
Wydział Zasobów<br />
Ludzkich<br />
LL<br />
Dział Kadr<br />
i Płac<br />
LK<br />
Dział Rozwoju<br />
i Szkoleń<br />
LR<br />
Wydział<br />
Administracji<br />
LA<br />
Pełnomocnik<br />
ds Ochrony<br />
i Zarządzania<br />
Kryzysowego LO<br />
Changes in the organizational structure<br />
In 2009 the following tasks related to the optimization of employment, work organization<br />
as well diversification of the Company’s activity were implemented.<br />
In February the positions of the Deputy Technical Director for Maintenance and<br />
Investment as well as the Deputy Director for Production were created. In March<br />
2009 the Managing Board accepted the preliminary cooperation contract between<br />
KOGENERACJA, ZEC, and EC ZG associated with the Energy Efficiency Project.<br />
In view of the merger of ZEC and EC ZG, a new organizational scheme was introduced<br />
on April 01st . At present, previous ZEC functions in the structure of EC ZG<br />
as the Heat Distribution Department. In October the Fire Fighting and Labor Safety<br />
Section as well as the position of the Radiological Protection officer were transferred<br />
from the Department of the Trade and Quality Director the Department of<br />
the Managing Director. The Position of the Deputy Trade and Quality Director was<br />
created on December 01st , 2009.<br />
- 5 -
Raport Roczny<br />
Annual Report<br />
- 6 -<br />
<strong>ELEKTROCIEPŁOWNIA</strong><br />
<strong>„ZIELONA</strong> <strong>GÓRA”</strong> S.A. Raport Roczny / Annual Report 2 0 0 9<br />
Marian Babiuch<br />
Prezes Zarządu<br />
President of the Board<br />
Roman Traczyk<br />
Członek Zarządu<br />
Board Member<br />
Organy Spółki<br />
Organami Spółki są:<br />
- Zarząd<br />
- Rada Nadzorcza<br />
- Walne Zgromadzenie<br />
Company Authorities<br />
Company Authorities include:<br />
- the Managing Board<br />
- the Supervisory Board<br />
- the General Assembly<br />
Christian Berger<br />
Członek Zarządu (do 10.07.2009 r.)<br />
Board Member (until 10.07.2009)<br />
Zarząd<br />
Zarząd prowadzi sprawy Spółki i reprezentuje ją na zewnątrz.<br />
Do 10 lipca 2009 roku skład Zarządu przedstawiał się następująco:<br />
- Marian Babiuch - Prezes Zarządu, Dyrektor Generalny,<br />
- Roman Traczyk - Członek Zarządu, Dyrektor ds. Handlu i Jakości,<br />
- Christian Berger - Członek Zarządu.<br />
W związku ze złożeniem 10 lipca 2009 r. przez Christiana Bergera rezygnacji<br />
z pełnienia funkcji członka Zarządu Rada Nadzorcza ustaliła, że Zarząd Spółki<br />
składa się z dwóch osób i przedstawia się następująco:<br />
- Marian Babiuch - Prezes Zarządu, Dyrektor Generalny,<br />
- Roman Traczyk - Członek Zarządu, Dyrektor ds. Handlu i Jakości (od 8 października<br />
2009 r. Roman Traczyk jest również członkiem Zarządu KOGENE-<br />
RACJI S.A.).<br />
Prokurentem Spółki jest Piotr Olejniczak - Dyrektor ds. Technicznych.<br />
W 2009 r. odbyły się 5 posiedzenia Zarządu, na których podjęto 127 uchwał.<br />
Rada Nadzorcza<br />
Rada Nadzorcza sprawuje stały nadzór nad działalnością Spółki.<br />
Do 9 czerwca 2009 r. Rada Nadzorcza VI kadencji działała w 5-osobowym składzie:<br />
- Philippe Castanet - Przewodniczący (przedstawiciel KOGENERACJI),<br />
- Krzysztof Wrzesiński - Zastępca Przewodniczącego (przedstawiciel KOGENE-<br />
RACJI),<br />
- Michael Kowalik - Członek Rady (przedstawiciel KOGENERACJI),<br />
- Henryk Peitler - Sekretarz (przedstawiciel pracowników EC ZG),<br />
- Grażyna Sawicka - Członek Rady (przedstawiciel pracowników EC ZG).<br />
W dniu 9 czerwca 2009 r., z chwilą odbycia Zwyczajnego Walnego Zgromadzenia<br />
Spółki zatwierdzającego sprawozdanie finansowe za 2008 r., wygasły mandaty<br />
członków Rady Nadzorczej VI kadencji. 5 lutego 2009 r. Rada Nadzorcza zarządziła<br />
przeprowadzenie wyborów członków Rady Nadzorczej wybieranych przez<br />
pracowników na VII kadencję. Procedura wyborów rozpoczęła się po 1 kwietnia<br />
2009 r.<br />
Zwyczajne Walne Zgromadzenie w dniu 9 czerwca 2009 r. powołało Radę Nadzorczą<br />
na VII kadencję w następującym składzie:<br />
- Philippe Castanet - Przewodniczący (przedstawiciel KOGENERACJI),<br />
- Krzysztof Wrzesiński - Zastępca Przewodniczącego (przedstawiciel KOGENE-<br />
RACJI),<br />
- Michael Kowalik - Członek Rady (przedstawiciel KOGENERACJI),<br />
- Mariusz Guz - Członek Rady (przedstawiciel pracowników EC ZG),<br />
- Henryk Peitler - Sekretarz Rady (przedstawiciel pracowników EC ZG).<br />
1 grudnia 2009 r. z członkostwa w Radzie Nadzorczej zrezygnował Michael Kowalik<br />
- w związku z przejściem na emeryturę. NZW EC ZG, które odbyło się 29<br />
stycznia 2010 r., powołało na członka Rady Haralda Minknera.<br />
Rada odbyła 4 posiedzenia, podjęła 4 uchwały.<br />
Walne Zgromadzenie<br />
Akcjonariuszami Spółki w 2009 r. byli: Zespół Elektrociepłowni Wrocławskich<br />
KOGENERACJA S.A., Gmina Zielona Góra o statusie miejskim oraz krajowe osoby<br />
fizyczne.<br />
W 2009 r. odbyły się dwa Walne Zgromadzenia:<br />
1) 20 lutego 2009 r. Nadzwyczajne Walne Zgromadzenie podjęło uchwałę w sprawie<br />
połączenia ze spółką Zielonogórska Energetyka Cieplna Spółka z ograniczoną<br />
odpowiedzialnością z siedzibą w Zielonej Górze,<br />
2) 9 czerwca 2009 r. Zwyczajne Walne Zgromadzenie zatwierdziło sprawozdanie<br />
Zarządu z działalności Spółki w 2008 r., sprawozdanie finansowe za 2008 r.,<br />
dokonało podziału zysku za 2008 r., zatwierdziło sprawozdanie z działalności<br />
Rady Nadzorczej jako organu Spółki w 2008 r., udzieliło absolutorium członkom<br />
organów Spółki z wykonania przez nich obowiązków w 2008 r. oraz powołało<br />
Radę Nadzorczą Elektrociepłowni „Zielona Góra” na VII kadencję.<br />
Managing Board<br />
The Managing Board runs the Company and represents it outside.<br />
On July 10th , 2009 the Managing Board consisted of the following persons:<br />
- Marian Babiuch - the President of Board, the Managing Director,<br />
- Roman Traczyk - Board Member, Trade and Quality Director,<br />
- Christian Berger - Board Member.<br />
Since on July 10th , 2009 Christian Berger resigned from the function of the Board<br />
Member, the Supervisory Board decided that the Managing Board would consist<br />
of two persons only:<br />
- Marian Babiuch - the President of Board, Managing Director,<br />
- Roman Traczyk - Board Member, Trade and Quality director (and from October<br />
08th , 2009 a Board Member in the Managing Board of KOGENERACJA S.A.).<br />
Piotr Olejniczak - Technical Director performed the function of the Proxy.<br />
In 2009 5 meetings of the Managing Board took place during which 127 resolutions<br />
were passed.<br />
Supervisory Board<br />
The Supervisory Board controls the Company’s activity on a permanent basis.<br />
Until June 09th , 2009, the Supervisory Board of the 6th term of office, consisted<br />
of 5 persons:<br />
- Philippe Castanet - Board Chairman (a representative of KOGENERACJA),<br />
- Krzysztof Wrzesiński - Deputy Chairman (a representative of KOGENERACJA),<br />
- Michael Kowalik - Board Member, (a represenative of KOGENERACJA),<br />
- Henryk Peitler - Secretary (a represenative of EC ZG staff),<br />
- Grażyna Sawicka - Board Member (a representative of EC ZG staff).<br />
On June 09th , 2009 after the Meeting of the General Assembly during which<br />
the financial report for 2008 was approved, the mandates of the members of the<br />
Supervisory Board of the 6th term of office expired. On February 05th , 2009 the<br />
Supervisory Board order a vote for the members of the Supervisory Board of the<br />
7th term of office. The elections started on April 01st , 2009.<br />
On June 09th , 2009 the Ordinary General Assembly appointed the following persons<br />
as members of the Supervisory Board of the 7th term of office:<br />
- Philippe Castanet - Chairman (a representative of KOGENERACJA),<br />
- Krzysztof Wrzesiński - Deputy Chairman (a representative of KOGENERACJA),<br />
- Michael Kowalik - Board Member (a representative of KOGENERACJA),<br />
- Mariusz Guz - Board Member (a representative of EC ZG staff),<br />
- Henryk Peitler - Secretary (a representative of EC ZG staff).<br />
On December 1st , 2009, Michael Kowalik resigned from the position of the member<br />
of the Supervisory Board in view of his retirement. On January 29th , 2010<br />
Harald Minkner was appointed for the position of the Board Member during the<br />
Extraordinary Meeting of the General Assembly.<br />
The Board had 4 meetings during which 4 resolutions were passed.<br />
General Assembly<br />
In 2009 the company had the following shareholders: Zespół Elektrociepłowni<br />
Wrocławskich KOGENERACJA S.A., Zielona Góra Municipal District and a number<br />
of individual persons, Polish citizens.<br />
In 2009 the Assembly held two General Meetings:<br />
1) On February 20th , 2009, during the Extraordinary Meeting of the General Assembly<br />
a resolution concerning the merger with Zielonogórska Energetyka<br />
Cieplna Sp. z o.o.,<br />
2) On June 09th , 2009 the Ordinary Meeting of the General Assembly approved<br />
the report of the Managing Board on the Company’s activity in 2008, the financial<br />
report for 2008, divided the profit for 2008, approved the report on the<br />
activity of the Supervisory Board in 2008, expressed approval of the activity<br />
of the Company’s authorities in 2008 and appointed the Supervisory Board of<br />
Elektrociepłownia “Zielona Góra” for the 7th term of office.<br />
- 7 -
Zatrudnienie<br />
Średnioroczne zatrudnienie w Elektrociepłowni w 2009 roku wyniosło 281 etatów,<br />
natomiast zatrudnienie na koniec 2009 roku wyniosło 298 osób.<br />
W 2009 roku Spółka rozwiązała umowę o pracę z trzema pracownikami, a zatrudniła<br />
68 osób - z tego 66 osób przejęła z ZEC w trybie art. 2 1 Kodeksu Pracy.<br />
Szkolenia<br />
W 2009 roku ogółem przeszkolono w Spółce 290 osób (96% załogi). W szkoleniach<br />
uczestniczyli pracownicy ze wszystkich pionów.<br />
Pracownicy uczestniczyli również w obowiązkowych szkoleniach z zakresu BHP,<br />
w szkoleniach wynikających ze Zintegrowanego Systemu Zarządzania oraz<br />
w szkoleniach językowych (j. angielski).<br />
Wielu pracowników skorzystało z oferowanego przez firmę dofinansowania studiów<br />
na uczelniach wyższych.<br />
Szkolenia ogólnorozwojowe i menedżerskie były w 2009 roku realizowane<br />
w ramach projektu szkoleniowego dofinansowanego ze środków Europejskiego<br />
Funduszu Społecznego (EFS) pod nazwą „Wspólne kompetencje siłą spółek<br />
Grupy EDF w Polsce”. Projekt jest realizowany wspólnie z pozostałymi spółkami<br />
z Grupy EDF w Polsce i ma na celu rozwijanie u pracowników kompetencji zgodnie<br />
ze wspólnymi dla całej Grupy profilami kompetencyjnymi.<br />
Struktura zatrudnienia na dzień 31.12.2009 r.<br />
Structure of employment as of December 31 st 2009<br />
- 8 -<br />
według poziomu wykształcenia<br />
by education<br />
wyższe<br />
higher<br />
<strong>ELEKTROCIEPŁOWNIA</strong><br />
<strong>„ZIELONA</strong> <strong>GÓRA”</strong> S.A. Raport Roczny / Annual Report 2 0 0 9<br />
110<br />
5<br />
podstawowe<br />
primary<br />
125<br />
58<br />
zasadnicze<br />
vocational<br />
średnie / secondary<br />
Employment<br />
powyżej 51 lat<br />
over 51 years<br />
według wieku<br />
by age<br />
111<br />
In 2009 the average employment in Elektrociepłownia totaled at 281 persons,<br />
whereas at the end of 2009 the Company employed 298 workers.<br />
In 2009 the Company terminated contracts with persons and 68 new workers<br />
were employed out of whom 66 were transferred from ZEC on the basis of the<br />
regulations of Article 2 1 of the Labor Code.<br />
Training<br />
On the whole 290 employees (96% of the staff) from all departments underwent<br />
various forms of training.<br />
Furthermore the employees underwent training in labor safety, Integrated Management<br />
system and foreign languages (English).<br />
Many workers took advantage of the Company’s system of co-financing university<br />
courses.<br />
In 2009 both general and managerial training was realized by the EDF Group as<br />
part of the training Project co-financed from the means of the European Social<br />
Fund. The project is run jointly with other companies of the EDF Group and its<br />
aim is to improve the competence of the staff members in accordance with the<br />
profiles followed by the entire Group.<br />
do 0 lat<br />
up to 0 years<br />
95<br />
18<br />
74<br />
1-40<br />
lat/years<br />
41-50 lat/years<br />
207<br />
mężczyźni / men<br />
według płci<br />
by gender<br />
91<br />
kobiety<br />
women<br />
Zagadnienia BHP<br />
Sprawy bezpieczeństwa i higieny pracy są traktowane w Spółce priorytetowo.<br />
Elektrociepłownia posiada certyfikaty poświadczające funkcjonowanie w ramach<br />
Zintegrowanego Systemu Zarządzania systemu BHP zgodnego z normą<br />
PN-N 180001:2004/OHSAS 18001:2007.<br />
W styczniu 2009 r. Zarząd przyjął Zintegrowaną Politykę Jakości, Środowiska<br />
i BHP Elektrociepłowni „Zielona Góra”. Nowa polityka uwzględnia prowadzenie<br />
działalności związanej z dystrybucją ciepła oraz wymagania Grupy EDF w zakresie<br />
polityki zrównoważonego rozwoju.<br />
Przez cały 2009 r. trwał w Spółce konkurs BHP „Pracuj bezpiecznie”, z udziałem<br />
dyrekcji, kierowników i pracowników. Co tydzień kontrolowano przestrzeganie<br />
zasad BHP, stan urządzeń na poszczególnych obiektach EC ZG.<br />
W czerwcu, w EC ZG odbyły się ćwiczenia z udziałem Państwowej Straży Pożarnej<br />
w zakresie ewakuacji osób z płonącego budynku administracyjnego. Działania<br />
ratowniczo-ewakuacyjne przebiegły sprawnie.<br />
W sierpniu Zarząd zaktualizował plan poprawy warunków BHP na 2009 r.<br />
We wrześniu, członkowie Zarządu EC ZG oraz inspektor BHP uczestniczyli w seminarium<br />
BHP organizowanym przez Dyrekcję Europy Środkowej i Wschodniej<br />
EDF we Wiedniu.<br />
W październiku, przeprowadzono zakładowy konkurs wiedzy o bezpieczeństwie<br />
pracy. Trzech najlepszych pracowników uczestniczyło w zorganizowanym w Elektrowni<br />
Dolna Odra ogólnopolskim konkursie wiedzy o bezpieczeństwie pracy.<br />
Work safety<br />
Work safety is given priority in the Company. Elektrociepłownia has received all<br />
the certificates confirming its functioning within the Integrated System of Health<br />
and Safety Management System in accordance with the PN-N 180001:2004/<br />
OHSAS 18001:2007 standard.<br />
In January 2009, the Managing Board accepted the Integrated Quality, Environment<br />
and Work Safety Policy of Elektrociepłownia “Zielona Góra”. This new policy<br />
assumes conducting business activity in the area of heat distribution as well the<br />
requirements of the EDF Group in terms of the policy of balanced development.<br />
Throughout the year 2009, the Company conducted a work safety competition<br />
which involved both the management and junior staff. Conformity with Work<br />
Safety regulations and the condition of all the EC ZG facilities were controlled<br />
on a weekly basis.<br />
In June, EC ZG along with the local fire brigade, organized a training involving<br />
evacuation of staff from the administration building. The rescue action was performed<br />
efficiently and competently.<br />
In August the Managing Board updated the plan of the improvement of labor<br />
safety conditions in 2009.<br />
In September the members of the Management Board of EC ZG and the Work<br />
Safety Inspector took part in a labor safety seminar organized in Vienna by the<br />
management of the Central and East European Division of EDF.<br />
In October a competition concerning the knowledge of labor safety regulations<br />
was conducted in the Company. Three best employees took part in the national<br />
level competition organized by the “Dolna Odra” power plant.<br />
- 9 -
Produkcja energii Energy production<br />
Zużycie surowców<br />
W roku 2009 do produkcji energii elektrycznej i ciepła zużyto 19 86<br />
tys. Nm gazu ziemnego GZ 41,5 oraz 17 626 t węgla energetycznego w klasie<br />
24 000 kJ/kg. Zużyto również 1 006 092 m wody, odprowadzono 280 8 m<br />
ścieków.<br />
Produkcja energii elektrycznej i ciepła<br />
Energia elektryczna i cieplna produkowane były w Bloku Gazowo - Parowym (podstawowa<br />
produkcja) oraz w Bloku Węglowym. Większe obciążenie produkcją<br />
ciepła BGP wynika z nastawienia się na uzyskanie jak największej ilości „żółtych”<br />
certyfikatów.<br />
- 10 -<br />
<strong>ELEKTROCIEPŁOWNIA</strong><br />
<strong>„ZIELONA</strong> <strong>GÓRA”</strong> S.A. Raport Roczny / Annual Report 2 0 0 9<br />
Produkcja energii elektrycznej i ciepła / Production of electricity and heat<br />
Łączna produkcja wykonana Bloków Gazowo - Parowego i Węglowego<br />
Total production of the CCGT and the Coal Block<br />
Material consumption<br />
In 2009 19,86 thousand Nm of GZ 41.5 natural gas and 17,626 t of<br />
24,000 kJ/kg power coal were for the production of electric energy and heat.<br />
The production involved the consumption of 1,006,092 m of water and<br />
280, 8 m of waste was disposed.<br />
Heat and electric energy production<br />
Electric and heat energy were produced in CCGT (Basic production) and in the<br />
Coal Unit. The higher intensity of the exploitation of CCGT is motivated by the will<br />
to acquire the maximum number of “yellow” certificates.<br />
Wyszczególnienie / Item 2008 r 2009 r Dynamika/Dynamics<br />
2009/2008<br />
Produkcja energii elektrycznej brutto / Gross production of electric power [MWh] 1 206 980 1 228 887 101,82%<br />
Produkcja energii elektrycznej netto / Net production of electric power [MWh] 1 164 980 1 188 358 102,01%<br />
Produkcja energii cieplnej brutto / Gross production of thermal energy [GJ] 1 691 110 1 749 490 103,45%<br />
Produkcja energii cieplnej netto / Net production of thermal energy [GJ] 1 558 170 1 610 834 103,38%<br />
Energia chemiczna węgla i gazu / Chemical energy of coal and gas [GJ] 9 318 480 9 565 826 102,65%<br />
Sprawność brutto / Gross efficiency [%] 64,78 64,54 99,63%<br />
Sprawność netto / Net efficiency [%] 61,73 61,56 99,72%<br />
Sprzedaż energii Energy sale<br />
Sprzedaż ciepła oraz energii elektrycznej / Sale of heat and electricity<br />
Dynamika /Dynamics<br />
Wyszczególnienie / Item J m 2007 r 2008 r 2009 r 2009/2008<br />
Sprzedaż ciepła / Sale of heat GJ 1 519 179 1 558 170 1 610 834* 103,4%<br />
Sprzedaż energii elektrycznej / Sale of electric energy MWh 1 216 273 1 166 430 1 188 635 101,9%<br />
w tym do / including for:<br />
PSE (w ramach KDT) / PSE (PPA contract) MWh 1 181 819 350 956 - -<br />
EVEREN MWh - 801 489 1 185 190 147,9%<br />
PSE (na rynek bilansujący) / PSE (balancing market) MWh 8 543 2 991 3 094 103,4%<br />
ENEA MWh 24 490 10 954 8 447 77,1%<br />
Odbiorca końcowy / End user MWh - 40 277 692,5%<br />
* do sieci miejskiej dostarczono 1 610 8 4 GJ ciepła przy planowanych 1 699 000 GJ z czego 1 95 700 GJ pochodziło z wymienników ciepłowniczych BGP, a 5 000 GJ z Bloku Węglowego.<br />
W porównaniu do analogicznego okresu roku ubiegłego ilość ciepła dostarczanego do sieci była wyższa o 5 000 GJ.<br />
* out of 1,699,000 GJ planned, 1,610,8 4 GJ was supplied to the municipal Network, 1, 95,700 GJ from the CCGT heat exchangers and 5 ,000 GJ from the Coal Unit. In comparison to<br />
the analogical period last year the amount of the supplied heat was higher by 5 ,000 GJ.<br />
Sprzedaż energii elektrycznej z BGP prowadzona jest przez spółkę EVEREN.<br />
W 2009 r. sprzedaż energii elektrycznej z tego Bloku była wyższa w stosunku do<br />
założeń przyjętych w budżecie o 4 940 MWh w związku z dodatkową sprzedażą<br />
energii w sierpniu 2009 r.<br />
Sprzedaż energii elektrycznej z Bloku Węglowego wyniosła 8 447 500 MWh<br />
wobec planowanych 14 05 MWh. Zmniejszenie sprzedaży energii z Bloku Węglowego<br />
związane było z mniejszą produkcją ciepła ze względu na większe obciążenie<br />
produkcją ciepła BGP.<br />
Electric energy from CCGT is sold by EVEREN. In 2009 the sale of electric energy<br />
the unit was higher by 4 ,940 MWh compared to the amount planned in the<br />
budget in result of additional sale in August 2009.<br />
The sale of electric energy from the Coal Unit amounted at 8,447,500 MWh compared<br />
to 14,05 MWh planned initially. The lower level of sale of energy from<br />
the Coal Unit resulted from lower production of heat due to higher production<br />
of heat in CCGT.<br />
- 11 -
Eksploatacja Operation and maintenance<br />
Eksploatacja Bloku Gazowo - Parowego (BGP)<br />
Blok Gazowo - Parowy o mocy elektrycznej 198 MW oraz mocy cieplnej 1 5 MW,<br />
zasilany krajowym gazem ziemnym, jest podstawowym źródłem wytwórczym<br />
energii elektrycznej i ciepła Elektrociepłowni. W roku 2009 około 85% całkowitej<br />
ilości ciepła oraz 99% całkowitej ilości energii elektrycznej zostało wyprodukowane<br />
w tym Bloku. W 2009 r. Blok Gazowo - Parowy pracował z dyspozycyjnością<br />
98,86%.<br />
BGP był wyłączany na krótko z powodu wymiany filtrów dokładnych w czerpni<br />
powietrza do sprężarki, usunięcia nieszczelności w kotle odzyskowym, wymiany<br />
dysz w układzie wtrysku wody do schładzacza pary świeżej kotła. Ponadto<br />
w lipcu przeszedł remont CI turbozespołu gazowego oraz pozostałych urządzeń<br />
towarzyszących.<br />
Eksploatacja Bloku Węglowego<br />
Blok Węglowy stanowi rezerwowe i szczytowe źródło ciepła. W sezonie grzewczym<br />
2008/2009 Blok pracował od 21 listopada 2008 do 2 kwietnia 2009 r.<br />
Dłużej Blok pracował w lipcu i sierpniu 2009 r. w okresie postoju remontowego<br />
BGP. Kolejne uruchomienie związane z sezonem grzewczym nastąpiło 11 grudnia<br />
2009 r. W Bloku Węglowym pracującymi urządzeniami wytwórczymi są kocioł<br />
parowy OR- 2 oraz turbozespół parowy o mocy 12,8 MW.<br />
Eksploatacja miejskiej sieci cieplnej i kotłowni<br />
lokalnych<br />
Zakład Dystrybucji Ciepła prowadzi działalność na bazie majątku ciepłowniczego,<br />
będącego własnością EC ZG, a także wykorzystując majątek dzierżawiony od<br />
spółki Zastal S.A. (sieć „zakładowa”). Ogółem majątek produkcyjny stanowiły:<br />
- sieci cieplne ogółem 10 ,78 km<br />
w tym: magistralne 4,59 km<br />
rozdzielcze 49,22 km (w tym 1, 8 km sieć Zastalu)<br />
przyłącza 19,97 km<br />
- węzły cieplne własne - 589<br />
- węzły cieplne „obce” w eksploatacji zleconej - 22<br />
- kotłownie lokalne (gazowe) - 28 o łącznej wydajności 2,04 MW<br />
W wyniku budowy nowych obiektów w roku 2009 odnotowano następujące przyrosty:<br />
sieci cieplnej o 4,1 km (z uwzględnieniem likwidacji starych odcinków sieci);<br />
węzłów cieplnych o 14 sztuk.<br />
Dostawa ciepła do odbiorców poprzez miejską sieć cieplną odbywała się przez<br />
926 węzłów cieplnych.<br />
- 12 -<br />
<strong>ELEKTROCIEPŁOWNIA</strong><br />
<strong>„ZIELONA</strong> <strong>GÓRA”</strong> S.A. Raport Roczny / Annual Report 2 0 0 9<br />
CCGT: operation and maintenance<br />
CCGT of 198 MW electric power and 1 5 MW heat power is supplied by local<br />
resources of natural gas and constitutes the basic energy and heat production<br />
facility in Elektrociepłownia. In 2009 approximately 85% of heat and 99% of<br />
electric energy was produced in CCGT. In 2009 the unit functioned with 98.86%<br />
availability.<br />
Short shut down periods resulted from the need to carry out maintenance work:<br />
replacement of fine filters in the compressor’s air intake, removing leakages in<br />
the waste heat boiler and replacement of nozzles in the system of water injection<br />
to the attemperator of fresh steam. The gas turbine unit as well as accompanying<br />
facilities underwent the CI overhaul in July.<br />
The Coal Unit: operations and maintenance<br />
The Coal Unit functions as a reserve and peak source of heat. During the heating<br />
season 2008/2009 the unit operated from November 21 st 2008 to April<br />
2 nd 2009. It was also used for longer periods in July and August 2009 during the<br />
shutdown period of CCGT. It was started again at the beginning of the following<br />
heating season on December 11 th , 2009. The main elements of the unit include<br />
the OR- 2 steam boiler and 12.8 MW steam turbine.<br />
The municipal heat distribution network and<br />
local boiler houses<br />
For the purpose of conducting its activity, the Department of Heat distribution<br />
uses the property of EC ZG as well as property leased from Zastal S.A. (company<br />
network). In general the production facilities include:<br />
- heat distribution networks total 10 .78 km<br />
including: arterial 4.59 km<br />
distributing 49.22 km (including 1. 8<br />
of Zastal network)<br />
terminal 19.97 km<br />
- company’s heat transfer stations - 589<br />
- leased heat transfer stations - 22<br />
- local boiler house (gas) - 28 of 2.04 MW total efficiency<br />
In result of construction work in 2009 growth could be observed in the following<br />
areas: 4.1 km of heat distribution network (including the liquidation of old sections)<br />
and 14 heat transfer stations.<br />
Heat was supplied by means of the municipal network and 926 heat transfer<br />
stations.<br />
- 1 -
<strong>ELEKTROCIEPŁOWNIA</strong><br />
<strong>„ZIELONA</strong> <strong>GÓRA”</strong> S.A. Raport Roczny / Annual Report 2 0 0 9<br />
Ochrona środowiska Environment protection<br />
Stan prawny<br />
Eksploatacja instalacji podlegającej wymaganiom Dyrektywy 96/61/WE w sprawie<br />
zintegrowanego zapobiegania zanieczyszczeniom i ograniczania ich emisji,<br />
zwana popularnie Dyrektywą IPPC (ang. Integrated Pollution Prevention and Control),<br />
wymaga uzyskania pozwolenia zintegrowanego. Elektrociepłownia „Zielona<br />
Góra“ S.A. podlega wymaganiom Dyrektywy IPPC, dlatego też posiada Pozwolenie<br />
Zintegrowane wydane przez Wojewodę Lubuskiego w grudniu 200 r. Pozwolenie<br />
Zintegrowane określa dopuszczalne standardy w zakresie oddziaływań środowiskowych<br />
w poszczególnych komponentach: powietrze, woda, ścieki, hałas,<br />
odpady, promieniowanie pól magnetycznych. Przeprowadzane kontrole Wojewódzkiego<br />
Inspektoratu Ochrony Środowiska nie wykazują przekroczeń dopuszczalnych<br />
wielkości określonych w PZ dla naszej instalacji. W 2009 r., w związku<br />
z rozszerzeniem działalności o przesył i dystrybucję ciepła, EC ZG otrzymała wszystkie<br />
konieczne decyzje administracyjne regulujące oddziaływanie na środowisko<br />
w zakresie ochrony powietrza i gospodarki odpadami.<br />
Realizowane zadania zmniejszające<br />
oddziaływanie na środowisko<br />
W naszych działaniach zobowiązujemy się do stosowania założeń Polityki Jakości,<br />
Środowiska i BHP: prowadzenia skutecznego i efektywnego monitoringu<br />
procesów produkcyjnych i zarządczych, praktycznego stosowania zasad zrównoważonego<br />
rozwoju, stosowania najlepszych dostępnych technik, eliminowania<br />
wysokoemisyjnego węgla oraz minimalizowania ilości wytwarzanych odpadów.<br />
Efekty ekologiczne osiągamy poprzez ciągłe doskonalenie procesów produkcyjnych<br />
oraz realizowane inwestycje.<br />
Ochrona powietrza<br />
W związku z realizacją projektu modernizacji Bloku Węglowego polegającego na<br />
budowie olejowo-gazowych kotłów wodnych wraz z towarzyszącą infrastrukturą<br />
przeprowadzony został na podstawie Raportu Oddziaływania na Środowisko proces<br />
oceny oddziaływania na środowisko, w wyniku której EC ZG uzyskała decyzję<br />
o środowiskowych uwarunkowaniach zgody na realizację przedsięwzięcia.<br />
Przewidywany efekt ekologiczny realizowanego przedsięwzięcia dotyczy ograniczenia,<br />
występujących podczas spalania węgla kamiennego, zanieczyszczeń<br />
gazowych i pyłowych emitowanych do atmosfery oraz wytwarzanych obecnie<br />
odpadów paleniskowych.<br />
Redukcje emisji zanieczyszczeń<br />
The impact on the environment<br />
Emisje do powietrza w latach 2004 - 2009<br />
i planowane do 2013<br />
Indexes of emission into the air 2004 - 2009<br />
and planned indexes until 2013<br />
0,150<br />
0,100<br />
Jednostkowy wskaźnik emisji<br />
kg/GJ (dla CO Mg/GJ)<br />
2<br />
Emission index per unit<br />
kg/GJ (for Co Mg/GJ)<br />
2<br />
0,050<br />
Zadania zmniejszające oddziaływanie w obszarze ochrony powietrza realizujemy<br />
także w zakresie przesyłu i dystrybucji ciepła. Projekt modernizacji miejskiej<br />
sieci ciepłowniczej, który realizowany będzie w latach 2009 - 201 , wpłynie pozytywnie<br />
na jakość środowiska. Oczekiwany efekt ekologiczny, związany z realizacją<br />
inwestycji, wpłynie na poprawę stanu jakości powietrza atmosferycznego<br />
poprzez redukcję emisji zanieczyszczeń:<br />
Zanieczyszczenie Redukcja emisji w [Mg]<br />
Dwutlenek węgla CO 2 1 979, 7<br />
Dwutlenek azotu NO 2 1,55<br />
Dwutlenek siarki SO 2 0,27<br />
Pył 0,11<br />
Legal status<br />
The operation and use of installations whose functioning is governed by the Directive<br />
96/61/WE on the integrated prevention and minimization of pollution,<br />
commonly referred to as IPPC Directive (Integrated Pollution Prevention and Control)<br />
requires the Integrated Permission. Elektrociepłownia “Zielona Góra” S. A. is<br />
subject to the requirements of the IPPC Directive and has obtained the Integrated<br />
Permission granted by the Governor of the Lubuskie Province in December 200 .<br />
The Integrated Permission specifies the permissible standards of the impact on<br />
the environment in terms of the following components: air, water, sewage, noise,<br />
waste and magnetic radiation. The audits conducted by the Provincial Inspectorate<br />
for Environment Protection showed that all installations of Elektrociepłownia<br />
meet the standards defined in the Integrated Permission. In 2009 in view of the<br />
extension of the Company’s activity by heat transfer and distribution, EC ZG obtained<br />
all relevant administrative decisions regulating the impact on the environment<br />
in respect of protection of air and waste management.<br />
The tasks reducing the impact<br />
on the environment<br />
While conducting our activity we are obliged to observe the Policy of Quality, Environment<br />
Protection and Labor Safety, and among others: efficient monitoring of<br />
production and management processes, practical application of the principles of<br />
balanced development, implementation of modern developments in technology,<br />
elimination of high emission coal, minimization of the amount of waste. Our ecological<br />
goals are achieved by means of the constant improvement of production<br />
processes and investment.<br />
Air protection<br />
In view of the realization of the Project of Modernization of the Coal Unit consisting<br />
in the construction of oil and gas boilers along with the accompanying infrastructure,<br />
the assessment of the impact on the environment was conducted on<br />
the basis of the Report on the Impact on the Environment and EC ZG received the<br />
decision concerning the approval of environmental aspects of the investment.<br />
The ecological result of the Project consists in the reduction of gas and dust<br />
pollution emitted to the atmosphere during combustion of coal and the amount<br />
of furnace waste.<br />
Planowane wskaźniki emisji<br />
Planned emission indexes<br />
0,000<br />
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013<br />
GJ - jednostka przeliczeniowa (MW ex ,6 + GJ ciepła) / GJ - conversion unit (MW ex .6 + GJ heat)<br />
dwutlenek węgla CO 2<br />
carbon dioxide CO 2<br />
dwutlenek azotu NO 2<br />
nitrogen dioxide NO 2<br />
dwutlenek siarki SO 2<br />
sulfur dioxide NO 2<br />
pył / dust<br />
Uruchomienie nowych kotłów<br />
Start-up of new boilers<br />
The tasks aimed at the reduction of the impact on the environment in the sphere<br />
of air protection apply also to heat transfer and distribution. The Project of the<br />
modernization of heat distribution network will be realized in the years 2009-<br />
201 and will exert a positive impact on the quality of the environment. The expected<br />
ecological effect related to the investment will improve the quality of air<br />
by the reduction of the emission of pollution:<br />
Pollution Reduction of emission [Mg]<br />
Carbon dioxide CO 2 1 979, 7<br />
Nitrogen dioxide NO 2 1,55<br />
Sulfur dioxide SO 2 0,27<br />
Dust 0,11<br />
Gospodarka wodno-ściekowa<br />
Pod koniec 2009 r. rozpoczęto realizacje projektu „Modernizacja gospodarki<br />
wodno-ściekowej”. Celem projektu jest dostosowanie układu technologicznego<br />
istniejącej instalacji wodno-ściekowej do pracy Bloku Gazowo - Parowego oraz<br />
kotłów olejowo-gazowych.<br />
Realizacja projektu obejmuje modernizację stacji demineralizacji oraz dekarbonizacji<br />
wody. Zakłada się, że w wyniku modernizacji zostaną osiągnięte efekty:<br />
- pełna kontrola procesów technologicznych,<br />
- większa niezawodność pracy urządzeń,<br />
- zmniejszenie zużycia surowców pomocniczych (kwasu solnego o<br />
ługu sodowego o 5%),<br />
0% oraz<br />
- zmniejszenie wody na potrzeby własne o 8%.<br />
Gospodarka odpadami<br />
Wytworzone uboczne produkty spalania paliw spełniają standardy jakości, co<br />
umożliwia ich przekazywanie uprawnionym podmiotom zewnętrznym do produkcji<br />
materiałów budowlanych. Wskaźnik zagospodarowania odpadów wynosi<br />
100%. Określony sposób postępowania z odpadami zobowiązuje Elektrociepłownię<br />
„Zielona Góra” S.A. do wypełnienia obowiązków wynikających z Rozporządzenia<br />
(WE) NR 1907/2006 Parlamentu Europejskiego i Rady z dnia 18<br />
grudnia 2006 r. w sprawie rejestracji, oceny, udzielania zezwoleń i stosowanych<br />
ograniczeń w zakresie chemikaliów (REACH).<br />
W 2009 r. podjęte zostały działania w celu przeprowadzenia pełnej rejestracji<br />
ubocznych produktów spalania w Europejskiej Agencji Chemikaliów (ECHA).<br />
W 2009 r. EC ZG przystąpiła do Konsorcjum ds. Rejestracji Ubocznych Produktów<br />
Spalania, zrzeszającego przedsiębiorstwa będące producentami oraz firmy<br />
zajmujące się odzyskiem odpadów paleniskowych.<br />
Wymogiem, niezbędnym do przeprowadzenia pełnej rejestracji w systemie RE-<br />
ACH, jest wykonanie badań reprezentatywnych prób żużla i popiołów, na podstawie<br />
których opracowane zostanie dossier rejestracyjne, które będzie podstawą<br />
pełnej rejestracji odpadów paleniskowych w Europejskiej Agencji Chemikaliów<br />
w obowiązkowym terminie do 0 listopada 2010 r.<br />
Ilość wytworzonych odpadów paleniskowych<br />
Amount of furnace waste<br />
Żużle i popioły Mg/rok<br />
Slag and ash Mg/year<br />
Bioróżnorodność<br />
Różnorodność biologiczna jest szczególną wartością całej żywej przyrody - można<br />
ją określić jako:<br />
- wszystkie formy istnienia żywej materii,<br />
- wszystkie stworzenia wraz ze wszystkimi ich cechami i przystosowaniami<br />
oraz oddziaływaniami między nimi.<br />
W roku 2009 Elektrociepłownia „Zielona Góra” S.A. podjęła zobowiązania do<br />
wprowadzenia przedsięwzięć zmierzających do monitorowania i ograniczania<br />
negatywnego wpływu działalności Spółki na różnorodność gatunków roślin<br />
i zwierząt.<br />
Nasze działania mają na celu:<br />
- podtrzymać mechanizmy działania żywej przyrody,<br />
- zachować jej zdolność do przetrwania zmian środowiska,<br />
- nie tracić tych wartości, których jeszcze nie umiemy odkryć i wykorzystać,<br />
a które mogą być podstawą rozwoju i gwarancją przeżycia przyszłych ludzkich<br />
pokoleń.<br />
Wymieranie gatunków jest procesem naturalnym, do którego dochodzi na skutek<br />
nieustannych zmian zachodzących w środowisku i dotyczy każdego gatunku.<br />
Człowiek szybko i na wielką skalę przekształca środowisko przyrodnicze, co<br />
zwiększa tempo wymierania gatunków.<br />
Water and sewage management<br />
At the end of 2009 the Project of the Modernization of Water and Sewage Management<br />
was started. The aim of the Project is adapt the technological system of<br />
the existing water and sewage installations to the requirements of CCGT as well<br />
as oil and gas boilers.<br />
The realization of the Project includes the modernization of the water demineralization<br />
and decarbonization station. The following effects are expected in result<br />
of the modernization:<br />
- full control of the technological processes,<br />
- higher reliability of facilities,<br />
- lower materials consumption (hydrochloric acid by 0% and soda lye by 5%),<br />
- lower water consumption - by 8%.<br />
Waste management<br />
Side products of fuel combustion meet the quality standards and hence they can<br />
be delivered to external subject for the purpose of production construction materials.<br />
The index of waste management amounts to 100%. The specific way of<br />
waste management obliges Elektrociepłownia “Zielona Gora” S. A. to fulfill the<br />
obligations resulting from the Resolution (WE) No. 1907/2006 of the Council of<br />
Europe and the European Parliament of December 18th , 2006 concerning the<br />
registration, assessment, permissions and limits imposed on chemical substances<br />
(REACH).<br />
In 2009 the Company undertook the activity aimed at complete registration of<br />
combustion waste in the European Chemicals Agency (ECHA).<br />
In 2009 EC ZG has joined the Consortium for Registration of Side Products of<br />
Combustion associating producers specializing in the recovery of furnace waste.<br />
Full registration in the REACH system has to be preceded by tests of representative<br />
samples of slag and ash on the basis of which the registration dossier can<br />
be compiled, which in turn will constitute the basis of the complete registration of<br />
furnace waste in ECHA in due time that is before November 0th , 2010.<br />
2001 2002 2003 2004 2005 2006 2007 2008 2009<br />
25 8 0 25 607 24 625 17 297 7 865 7 610 6 292 4 6 115<br />
Bio-diversity<br />
Biological diversity constitutes a specific value of natural life which can be defined<br />
as:<br />
- all forms of living matter,<br />
- fauna and flora with all its features, adaptations and inter-relations.<br />
In 2009 Elektrociepłownia “Zielona Góra” S. A. obliged itself to introduce actions<br />
aimed at reduction and monitoring the impact of the Company on various species<br />
of plants and animals occurring on the area of our activity.<br />
The actions aim at:<br />
- maintaining the mechanisms of the functioning of nature,<br />
- preserving the ability to survive changes in the environment,<br />
- maintaining those values which we are still not able to discover and use and<br />
which may function as the basis of development and the guarantee of survival<br />
of future generations of people.<br />
Extinction of species is a natural phenomenon which results from changes in the<br />
environment and affects all species. People fairly rapidly and to a large extent<br />
transform the natural environment, which in turn intensifies the tempo of the extinction<br />
of particular species.<br />
- 14 - - 15 -
<strong>ELEKTROCIEPŁOWNIA</strong><br />
<strong>„ZIELONA</strong> <strong>GÓRA”</strong> S.A. Raport Roczny / Annual Report 2 0 0 9<br />
Zintegrowany System Zarządzania<br />
Warunkiem zapewnienia wysokiego poziomu jakości oraz skutecznego minimalizowania<br />
oddziaływań środowiskowych i zagrożeń w zakresie BHP jest efektywnie<br />
wdrożony i certyfikowany w EC ZG Zintegrowany Systemu Zarządzania.<br />
System ma na celu wspomaganie Spółki w zapobieganiu i zarządzaniu ryzykiem<br />
związanym z jakością, ochroną środowiska i BHP w oparciu o wymagania zawarte<br />
w normach PN-EN ISO 9001:2009, PN-EN ISO 14001:2005 oraz PN-N<br />
-18001:2004 i BS OHSAS 18001:2007.<br />
Certyfikat Zintegrowanego Systemu Zarządzania Jakością, Systemu Środowiskowego<br />
oraz Zarządzania Bezpieczeństwem i Higieną Pracy w zakresie wytwarzania<br />
energii elektry cznej i ciepła oraz przesyłu i dystrybucji ciepła EC ZG otrzymała<br />
w sierpniu 2009 r.<br />
Laboratorium Zakładowe<br />
Laboratorium Zakładowe posiada Certyfikat Akredytacji na zgodność z wymaganiami<br />
normy PN-EN ISO/IEC 17025:2005. W 2009 r. rozszerzono zakres<br />
akredytacji o wprowadzenie badań dotyczących zawartości węgla całkowitego<br />
w odpadach paleniskowych.<br />
Laboratorium uczestniczy w międzylaboratoryjnych badaniach porównawczych<br />
organizowanych przez akredytowane Laboratorium Paliw Stałych i Płynnych<br />
SGS Polska, dotyczących badań jakościowych węgla kamiennego. Wyniki badań<br />
przeprowadzonych w 2009 r. spełniły wymagania założone w sterowaniu jakością<br />
badań i potwierdziły prawidłowe wykonanie analiz przez Laboratorium Spółki.<br />
The Integrated System of Management<br />
High level of quality and efficient minimization of the impact on the environment<br />
as well as threats in terms of labor safety is conditioned by effective implementation<br />
of the certified EC ZG Integrated System of Management.<br />
The aim of the system is to support the Company in the prevention and management<br />
of risk related to quality, environment protection and labor safety on<br />
the basis of the requirements specified in PN-EN ISO 9001:2009, PN-EN ISO<br />
14001:2005, PN-N-18001:2004 and BS OHSAS 18001:2007 norms.<br />
In August 2009, EC ZG received the Certificate of the Integrated System of Quality,<br />
Environment and Labor Safety Management in the area of production of electric<br />
energy and heat as well as transfer and distribution of heat.<br />
Company Laboratory<br />
The Company Laboratory has obtained the Accreditation Certificate confirming<br />
the conformity with the requirements of the PN-EN ISO/IEC 17025:2005 norm.<br />
In 2009 the scope of the accreditation was expanded by tests of coal contents<br />
in furnace waste.<br />
The Laboratory participates in the inter-laboratory comparative tests organized<br />
by the accredited Laboratory of Solid and Liquid Fuels SGS Polska and concerning<br />
the qualitative analysis of hard coal. The results of tests conducted in 2009<br />
met the requirements assumed in the system of test quality management and confirmed<br />
that the tests conducted in the Company Laboratory were performed well.<br />
Projekty EC ZG<br />
Przyłączenie Zielonogórskiej Energetyki<br />
Cieplnej do EC ZG<br />
20 lutego 2009 r. Nadzwyczajne Walne Zgromadzenie EC ZG oraz Nadzwyczajne<br />
Zgromadzenie wspólników ZEC podjęły uchwały o połączeniu Spółek EC ZG<br />
i ZEC. NWZ EC ZG wyraziło zgodę na plan połączenia, proponowane zmiany Statutu<br />
Spółki przejmującej oraz podwyższenie kapitału zakładowego w związku<br />
z połączeniem.<br />
W dniu 1 kwietnia 2009 r. Sąd Rejonowy w Zielonej Górze postanowił wpisać do<br />
KRS informacje dotyczące połączenia Spółek. Połączenie nastąpiło na podstawie<br />
art. 492 § 1 pkt.1 K.s.h. w drodze przeniesienia całego majątku ZEC na EC ZG<br />
w zamian za akcje utworzone w podwyższonym kapitale Spółki przejmującej.<br />
Postanowienie Sądu stało się prawomocne 9 kwietnia 2009 r.<br />
Po połączeniu kapitał zakładowy EC ZG wzrósł o 65 250 zł. Wyemitowano<br />
26 1 0 akcji imiennych, zwykłych serii „D”, które objęła KOGENERACJA S.A.<br />
(17 978 akcji) oraz gmina Zielona Góra o statusie miejskim (8 152 akcje).<br />
Projekt modernizacji miejskiej sieci<br />
ciepłowniczej<br />
Realizacja projektu rozłożona jest na kilka zadań realizowanych w latach 2009<br />
- 201 . Łączna długość sieci modernizowanych (budowanych w nowej technologii,<br />
przebudowywanych i likwidowanych) wynosi 7,14 km. Przy jednym z zadań<br />
zmiana technologii i średnicy DN 700 na DN 500 pozwoli ograniczyć straty ciepła<br />
na modernizowanym odcinku o 77%.<br />
Projekt modernizacji Bloku Węglowego<br />
W sierpniu 2008 r. Zarząd EC ZG wybrał wstępny wariant modernizacji Bloku<br />
Węglowego, w maju 2009 r. przyjął „Studium wykonalności budowy kotłów olejowo-gazowych<br />
w EC ZG”. Rada Nadzorcza EC ZG wyraziła zgodę na rozpoczęcie<br />
procesu inwestycyjnego.<br />
Przeprowadzono procedurę wyboru wykonawcy modernizacji. Najkorzystniejszą<br />
ofertę złożyło konsorcjum firm Mostostal Warszawa S.A. i Comax Katowice<br />
Sp. z o.o., z którymi podpisano w marcu 2010 r. kontrakt obejmujący projekt, budowę,<br />
dostawę urządzeń i wyposażenia, montaż na placu budowy, uruchomienie<br />
i przekazanie do eksploatacji układu kotłów olejowo-gazowych w formule realizacji<br />
„pod klucz”, z terminem oddania kotłów do eksploatacji na 0 czerwca 2012 r.<br />
W miejsce czterech kotłów wodnych węglowych wybudowanych zostanie pięć<br />
nowych kotłów wodnych olejowo-gazowych o mocy 2 MWt każdy, jeden kocioł<br />
parowy o wydajności 9t/h oraz układ zasilania w gaz i olej wraz z dwoma zbiornikami<br />
oleju o pojemności około 000 t.<br />
Modernizacja gospodarki wodno-ściekowej<br />
15 października 2009 r. rozpoczęto prace przygotowawcze do realizacji zadania<br />
inwestycyjnego „Modernizacja gospodarki wodno - ściekowej” w celu dostosowania<br />
techniki tej gospodarki do standardów stosowanych na instalacjach Bloku<br />
Gazowo - Parowego oraz nowo budowanej kotłowni olejowo-gazowej. Zakończenie<br />
prac modernizacyjnych nastąpi w 2012 r.<br />
Projekt „Efektywność Energetyczna”<br />
24 marca 2009 r., Zarządy EC ZG i KOGENERACJI S.A. podpisały porozumienie<br />
w sprawie współpracy przy Projekcie „Efektywność Energetyczna”. Celem projektu<br />
jest wypracowanie i wdrożenie w Spółkach nowego produktu oferowanego<br />
odbiorcom energii - kompleksowej usługi poprawy efektywności energetycznej.<br />
EC ZG projects<br />
Zielonogórska Energetyka Cieplna and EC ZG<br />
merger<br />
On February 20th , 2009 during the Extraordinary Meeting of the General Assemblies<br />
of EC ZG and ZEC resolutions were passed concerning the merger of both<br />
companies. The plan of the merger, changes in the Company’s Statute as well as<br />
increase of the Company’s capital were agreed.<br />
On April 01st , 2009 the District Court in Zielona Góra decided to enter the information<br />
concerning the merger into the State Register of Companies. The merger<br />
was conducted in accordance with the provisions art. 492 § 1.1 of the Company<br />
Code and the entire property of ZEC was assumed by EC ZG in exchange for<br />
shares in the increased capital of the Company. The decision of the Court became<br />
effective on April 09th , 2009.<br />
After the merger the company capital of EC ZG was increased by 65 ,250 PLN.<br />
26,1 0 “D” series registered shares were issued assumed by KOGENERACJA S.A.<br />
(17,978 shares) and the Zielona Góra municipal district (8,152 shares).<br />
Modernization of the municipal heat<br />
distribution network<br />
The realization of the Project is divided into several tasks implemented in the<br />
years 2009 - 201 . The total length of the modernized network (constructed with<br />
the use of modern technology, reconstructed or liquidated) amounts at 7.14 km.<br />
One of the tasks involving technological change and the diameter from DN 700<br />
to DN 500 will result in the 77% reduction of the loss of heat in the modernized<br />
section.<br />
Modernization of the Coal Unit<br />
In August 2008 the Managing Board of EC ZG decided on the preliminary variant<br />
of the modernization of the Coal Unit and in May, 2009 it approved “The realizability<br />
report on the construction of oil and gas boilers in EC ZG”. The supervisory<br />
Board agreed to start the investment process.<br />
The contractor was selected. The best offer was submitted by the consortium<br />
of Mostostal Warszawa S.A. and Comax Katowice Sp. z o.o., and the contract for<br />
the turnkey project realization, construction, delivery of facilities and equipment,<br />
assembling on the construction site, start-up and technical acceptance of the<br />
system of oil and gas boilers with the deadline agreed for June 0th , 2012 was<br />
signed. Four coal boilers will be replaced by five new oil and gas boilers of the<br />
total power 2 MWt each, one steam boiler of the 9t/h efficiency and the gas and<br />
oil supply system including two ,000 t oil containers.<br />
Modernization of the sewage and waste<br />
management system<br />
On October 15 th , 2009 the preliminary work concerning the realization of the<br />
“Water-sewage management” project was started whose aim is to adapt technology<br />
to the standards followed in the facilities of CCGT and the newly constructed<br />
oil and gas boiler house. The project will be completed in 2012.<br />
“Energy efficiency” project<br />
On March 24 th , 2009 the Managing Boards of EC ZG and KOGENERACJA S.A.<br />
signed an agreement on cooperation in the realization of the “Energy efficiency”<br />
Project. The aim of the project is to elaborate and implement new products offered<br />
to end users - a complex service in terms of the efficient use of energy.<br />
- 16 - - 17 -
Rozwijanie rynku ciepła sieciowego<br />
w Zielonej Górze<br />
Development of the heat distribution market in Zielona Góra<br />
Elektrociepłownia „Zielona Góra” zaspokaja około 50% potrzeb cieplnych Zielonej<br />
Góry, przy czym nieco ponad 49% zaopatrzenia w ciepło realizuje z miejskiej<br />
sieci cieplnej, a 0,6% z 28 gazowych kotłowni lokalnych. Dostawa ciepła przeznaczona<br />
jest głównie dla zasobów budownictwa mieszkaniowego wielorodzinnego.<br />
Grupa tych odbiorców stanowi 62,8% mocy zamówionej. Pozostałe grupy<br />
odbiorców to obiekty użyteczności publicznej 19,6% (w tym szkolnictwo 10,4%),<br />
przemysł i usługi 16,9% oraz budownictwo jednorodzinne 0,7%.<br />
Elektrociepłownia planuje w latach 2009 - 2011 przyłączenie do miejskiego systemu<br />
ciepłowniczego nowych obiektów, jak też obiektów istniejących (rozwój sieci<br />
w Śródmieściu w rejonie Starego Rynku, rozwój sieci w kierunku osiedli: Czarkowo,<br />
Mazurskie oraz Leśny Dwór) o mocy cieplnej około 16 MW.<br />
Głównym celem strategii rozwoju rynku ciepła w Zielonej Górze jest zatrzymanie<br />
tendencji spadkowej sprzedaży ciepła sieciowego w latach 2008 - 2010 i osiągnięcie<br />
tendencji wzrostowej w latach 2011 - 2016.<br />
W latach 2012 - 2016 realne wydaje się pozyskanie około 18 MW nowych przyłączeń,<br />
przy założeniu utrzymania się aktualnego wysokiego tempa rozwoju miasta<br />
i sieci cieplnej. Związane to jest z koniecznością rozwoju sieci cieplnej w obszarach<br />
rozwojowych i terenach o największej gęstości cieplnej.<br />
40<br />
5<br />
0<br />
25<br />
2003 2004 2005 2006 2007 2008 2009<br />
ciepło gazu ziemnego GZ 41,5 / natural gas heat GZ 41.5<br />
ciepło z msc A1 / A1 network heat<br />
ciepło z msc A2 / A2 network heat<br />
Z wykresu na rysunku widać, że w roku 2009 została osiągnięta niewielka przewaga<br />
cenowa ciepła sieciowego nad ciepłem pozyskiwanym z gazu.<br />
- 18 -<br />
<strong>ELEKTROCIEPŁOWNIA</strong><br />
<strong>„ZIELONA</strong> <strong>GÓRA”</strong> S.A. Raport Roczny / Annual Report 2 0 0 9<br />
Elektrociepłownia “Zielona Góra” satisfies 50% of the heat demand of the city<br />
of Zielona Góra, out of which 49% is realized by means of the supply through<br />
the municipal heat distribution network and 0.6% by 28 local gas boiler houses.<br />
The supply of heat is directed mainly to housing estates. This group constitutes<br />
62.8% of the ordered power. The remaining groups include public facilities -<br />
19.6% (including schools - 10.4%), industry and services - 16.9% and individual<br />
houses - 0.7%.<br />
Elektrociepłownia is planning to connect the municipal heating system to both<br />
new and existing objects in the years 2009 - 2011 (network extension in the town<br />
center and the districts of Czarkowo, Mazurskie and Leśny Dwór) of the total heat<br />
power of approx. 16 MW.<br />
The major aim of the strategy of the development of the heat market in Zielona<br />
Góra aims at stopping the decrease trend in the sale of network heat in the years<br />
2008 - 2010 and assuming growth in the years 2011 - 2016.<br />
Assuming further 18 MW of new connections in the years 2012 - 2016 seems<br />
realistic in view of the current dynamic development of the town and the spread of<br />
the heat distribution network. The process requires investment in new development<br />
areas as well as in the areas of the highest heat demand density.<br />
Porównanie ceny jednostkowej ciepła sieciowego i ciepła pochodzącego ze spalania gazu dla obiektu<br />
modelowego (uwzględniono zmiany cen i taryf do końca roku 2009)<br />
The comparison of the unit price of network heat and gas heat for model objects<br />
(including the changes in prices and tariffs in 2009)<br />
zł (PLN) / GJ<br />
50<br />
47,8<br />
47,6<br />
46,8<br />
45<br />
The diagram shows the slight price advantage of network heat over the heat obtained<br />
from gas supply in 2009.<br />
- 19 -
Grupa kapitałowa<br />
EC „Zielona Góra” S.A.<br />
EC ZG’s subsidiary companies<br />
Elektrociepłownia w 2009 r. była powiązana kapitałowo z trzema podmiotami<br />
gospodarczymi:<br />
- do 0 września 2009 r. z ECeAuto Sp. z o.o.,<br />
- do 1 marca 2009 r. z Zielonogórską Energetyką Cieplną Sp. z o.o.,<br />
- do stycznia 2009 r. z Infrastrukturą Gminną - Grupą Zachód Spółką w likwidacji.<br />
Na dzień 1 grudnia 2009 r. EC ZG nie posiadała już grupy kapitałowej.<br />
ECeAuto Sp. z o.o. w Zielonej Górze<br />
Spółka, której podstawową działalnością była sprzedaż samochodów Skoda,<br />
została zarejestrowana w KRS 9 lutego 2009 r. Powstała w wyniku zmiany<br />
nazwy dotychczasowej spółki ECeRemont. 27 stycznia 2009 r. Nadzwyczajne<br />
Zgromadzenie Wspólników PRE „ECeRemont” postanowiło zmienić nazwę spółki<br />
na „ECeAuto” Sp. z o.o. i zakres jej działalności.<br />
Dotychczasowa Spółka PRE „ECeRemont” Sp. z o.o., wyodrębniona w 1995 r.<br />
w ramach programu restrukturyzacji Elektrociepłowni, realizowała usługi<br />
remontowe oraz prowadziła salon samochodowy Skoda. W grudniu 2008 r.<br />
Nadzwyczajne Zgromadzenie Wspólników spółki ECeRemont podjęło uchwałę<br />
w sprawie zbycia zorganizowanej części przedsiębiorstwa ECeRemont,<br />
dotyczącej działalności remontowej, na rzecz spółki Polimex-Energo Sp. z o.o.<br />
z siedzibą w Warszawie. 0 grudnia 2008 r. podpisano umowę sprzedaży części<br />
przedsiębiorstwa ECeRemont.<br />
0 września 2009 r. EC ZG podpisała z dwoma wspólnikami spółki „ECeAuto”<br />
umowę sprzedaży posiadanych przez EC ZG udziałów.<br />
Zielonogórska Energetyka Cieplna Sp. z o.o.<br />
w Zielonej Górze<br />
ZEC zajmowała się przesyłem i dystrybucją ciepła wytworzonego przez EC ZG.<br />
Była również producentem ciepła w 29 lokalnych kotłowniach gazowych.<br />
Zarządzała ponad 100 km sieci ciepłowniczych (miejski system ciepłowniczy)<br />
i węzłami ciepłowniczymi. W czerwcu 2008 r. zapadły decyzje Zarządów EC ZG<br />
i KOGENERACJI dotyczące przyłączenia Zielonogórskiej Energetyki Cieplnej do<br />
EC ZG. 20 października 2008 r. Zarządy EC ZG i ZEC przyjęły Plan połączenia<br />
Spółek. Połączenie nastąpiło 1 kwietnia 2009 r.<br />
Infrastruktura Gminna - Grupa Zachód Sp. z o.o.<br />
w likwidacji z siedzibą w Zielonej Górze.<br />
Spółka powołana w 2001 r. przez przedsiębiorstwa energetyki zawodowej działające<br />
w ramach Lubuskiego Towarzystwa na Rzecz Rozwoju Energetyki. W jej<br />
programie było uczestnictwo w realizacji projektów w następujących obszarach<br />
energetyki: przedsiębiorstwa multienergetyczne i infrastrukturalne, energetyka<br />
rozproszona, energetyka ze źródeł odnawialnych.<br />
0 czerwca 2006 r. Zgromadzenie Wspólników IGGZ podjęło uchwałę w sprawie<br />
rozwiązania i likwidacji spółki. Po sprzedaży majątku przedsiębiorstwa<br />
w styczniu 2009 r. nastąpiło wykreślenie Spółki przez Sąd Rejestrowy.<br />
- 20 -<br />
<strong>ELEKTROCIEPŁOWNIA</strong><br />
<strong>„ZIELONA</strong> <strong>GÓRA”</strong> S.A. Raport Roczny / Annual Report 2 0 0 9<br />
In 2009 Elektrociepłownia was in equity relations with three business entities:<br />
- until September 0th , 2009 with ECeAuto Sp. z o.o.,<br />
- until March 1st 2009 with Zielonogórska Energetyka Cieplna Sp. z o.o.,<br />
- until January 2009 with Infrastruktura Gminna - Grupa Zachód in liquidation.<br />
On December 1st , 2009 EC ZG’s subsidiary companies no longer existed.<br />
ECeAuto Sp. z o.o. in Zielona Góra<br />
The basic business activity of the Company involved the sale of Skoda cars.<br />
The company was registered in the State Register of Companies on February<br />
09th , 2009. It was founded in result of the change of the name of the previous<br />
ECeRemont company. The Extraordinary Meeting of the Partners of “ECeRemont”<br />
decided to change the name of the company into “ECeAuto” Sp. z o.o. and<br />
the scope of business activity.<br />
PRE “ECeRemont” Sp. z o.o. registered in 1995 as part of the project of restructuring<br />
Elektrociepłownia, offered overhaul services and the sale of Skoda cars.<br />
In December 2008 the Extraordinary Meeting of the Partners of ECeRemont<br />
decided to sell the part of the company specializing in overhauls to Plimex-Energo<br />
Sp. z o. o. with headquarters in Warsaw. On December 0th , 2008 the sales<br />
contract was signed.<br />
On September 0th , 2009 EC ZG signed a contract with two partners of “ECeAuto”<br />
concerning the sale of EC ZG shares.<br />
Zielonogórska Energetyka Cieplna Sp. z o.o.<br />
in Zielona Góra<br />
The business activity of ZEC involved the transfer and distribution of heat produced<br />
by EC ZG. Additional production of heat was generated in 29 local gas<br />
boiler houses. The company managed 100 km of the distribution network (the<br />
municipal heat distribution system) and heat transfer stations. In June 2008 the<br />
Managing Boards of EC ZG and ZEC accepted the plan of the merger of both Companies.<br />
The merger took place on April 01 st , 2009.<br />
Infrastruktura Gminna - Grupa Zachód Sp. z o.o.<br />
in liquidation with headquarters<br />
in Zielona Góra.<br />
The company was established in 2001 by the Professional energy production<br />
companies associated in the Lubuskie Association for Energy Production Development.<br />
Its aims included the realization of energy oriented projects: multi-energy<br />
companies, infrastructure, dispersed energy or renewable energy.<br />
On June 0th 2006, the Assembly of IGGZ Partnerts decided to dissolve and liquidate<br />
the company. After the sale of the company’s property in January 2009, the<br />
company was removed from the State Register of Companies by the competent<br />
Court.<br />
- 21 -
<strong>ELEKTROCIEPŁOWNIA</strong><br />
<strong>„ZIELONA</strong> <strong>GÓRA”</strong> S.A. Raport Roczny / Annual Report 2 0 0 9<br />
Kształtowanie wizerunku Spółki<br />
Developing the Company image<br />
Działalność sponsoringowa i promocyjna<br />
Spółka buduje dobre relacje z otoczeniem oraz kształtuje pozytywny wizerunek<br />
poprzez angażowanie się w wybrane, ważne z punktu widzenia interesów społeczności<br />
lokalne inicjatywy. Spółka promowała ciepło sieciowe EC ZG i ochronę<br />
środowiska. Wspierała działalność charytatywną, ochronę zdrowia, naukę<br />
i oświatę, kulturę oraz sport, w tym sportowców niepełnosprawnych. Dotowała<br />
działalność organizacji działających przy EC ZG. Podtrzymywała dobre relacje<br />
z władzami administracyjnymi i samorządowymi w regionie oraz odbiorcami<br />
ciepła w Zielonej Górze.<br />
22 kwietnia 2009 r., w siedzibie EC ZG, odbyła się uroczystość wręczenia „czeków”<br />
- darowizn wypracowanych w ramach konkursu BHP „Pracuj bezpiecznie”<br />
przedstawicielom instytucji charytatywnych - Stowarzyszeniu Osób Niepełnosprawnych<br />
„PROMYK” oraz Ośrodkowi Integracji Społecznej w Zielonej Górze.<br />
Łącznie przekazano darowizny na kwotę 1 275 zł.<br />
26 października w zielonogórskim Ratuszu członkowie Zarządu EC ZG podpisali<br />
z Prezydentem Zielonej Góry porozumienie w sprawie pomocy społecznej mieszkańcom<br />
Zielonej Góry znajdującym się w trudnej sytuacji materialnej. EC ZG przekazało<br />
w formie darowizny 80 tys. zł. Pomoc finansowa dotyczy opłat za ogrzewanie<br />
mieszkań i korzystanie z ciepłej wody z miejskiego systemu ciepłowniczego.<br />
Kilkaset rodzin uzyskało pomoc poprzez Miejski Ośrodek Pomocy Społecznej.<br />
9 października 2009 r. w Zielonej Górze odbyło się coroczne, tradycyjne spotkanie<br />
przedstawicieli EC ZG z odbiorcami ciepła sieciowego. Podczas zwyczajowej<br />
prezentacji poinformowano odbiorców m.in. o planach rozwojowych Spółki.<br />
EC ZG udostępniała do zwiedzania obiekty produkcyjne (szczególnie BGP) oraz<br />
schron Obrony Cywilnej. W 2009 r. odwiedziło te obiekty kilkaset osób, głównie<br />
polscy i zagraniczni goście Spółki, uczniowie, studenci, naukowcy oraz pracownicy<br />
branży elektroenergetycznej.<br />
Nagrody<br />
W maju 2009 r., EC „Zielona Góra” została uhonorowana tytułem: „SOLIDNY<br />
PRACODAWCA ZIEMI LUBUSKIEJ 2008”. Projekt „Solidny Pracodawca Roku”<br />
jest prowadzony przez Grupę Media Partner z Katowic pod honorowym patronatem<br />
Ministra Pracy i Polityki Społecznej oraz patronatem Konfederacji Pracodawców<br />
Polskich.<br />
We wrześniu została tegorocznym, regionalnym laureatem konkursu „Firma dobrze<br />
widziana” organizowanego przez Business Centre Club, Akademię Rozwoju<br />
Filantropii w Polsce, Forum Związków Zawodowych oraz tygodnik Newsweek.<br />
Zajęła czwarte miejsce w kategorii duże firmy w I edycji konkursu „Lubuski Lider<br />
Biznesu” organizowanego przez Zachodnią Izbę Przemysłowo - Handlową w Gorzowie<br />
Wlkp. oraz Media Regionalne Zielona Góra.<br />
Zajęła drugie miejsce wśród dużych przedsiębiorstw, zatrudniających powyżej<br />
250 osób w XVI edycji konkursu „Pracodawca - organizator pracy bezpiecznej”<br />
organizowanego przez Okręgowego Inspektora Pracy w Zielonej Górze.<br />
W listopadzie 2009 r. otrzymała w konkursie Laur Białego Tygrysa Energia 2009,<br />
organizowanym przez Agencję Promocji Energii, nagrodę za kompleksową modernizację<br />
organizacyjno- technologiczną systemu ciepłowniczego Zielonej Góry<br />
(od źródła do odbiorcy).<br />
Sponsoring and promotion<br />
The Company develops good relations with the local community and shapes its<br />
positive image by supporting local initiatives. The Company promoted EC ZG heat<br />
distribution network and environment protection. It supported charity, health protection,<br />
science, education, culture, sport and disabled sportsmen. The Company<br />
sponsored organizations attached to EC ZG. It maintained good relations with administrative<br />
and local government authorities as well as its end users in Zielona<br />
Góra.<br />
On April 22nd , 2009 EC ZG granted checks or “donations” worked out as part of<br />
the labor safety contest to the representatives of charity organizations - “PRO-<br />
MYK” the Association of the Disabled Persons and the center of Social Integration<br />
in Zielona Góra. On the whole the total of 1 ,275 PLN was donated.<br />
On October 26th , the members of the EC ZG Managing Board concluded an agreement<br />
with the Mayor of Zielona Góra concerning the social aid directed at the<br />
Zielona Góra citizens suffering from a difficult financial situation. EC ZG donated<br />
80 thousand PLN. The financial aid covered the fees for heating and the use of<br />
hot water from the municipal heat and hot water distribution system. Several<br />
families received aid through the City’s Social Aid Center.<br />
On October 09th 2009 an annual traditional meeting of the representatives of<br />
EC ZG and its customers was held. During the meeting the information concerning<br />
the future developments of the Company was presented.<br />
EC ZG organized the viewing of the production facilities (in particular CCGT) and<br />
the Civil Defense bunker. In 2009 several hundred of persons visited the objects,<br />
most of whom were Polish or foreign guests of the Company, pupils, students,<br />
scientists or specialists in energy production industry.<br />
Awards<br />
In May 2009 EC “Zielona Góra” was honored with the title of “Reliable Employer<br />
in the Lubuskie province in 2008”. The Project is run by the Media Center Group<br />
from Katowice with the honorary patronage of the Minister of Labor and Social<br />
Security Policy and the Confederation of Polish Employers.<br />
In September the company was announced the regional laureate of the “Appreciated<br />
Company” competition organized by the Business Center Club, The Academy<br />
for the Development of Philanthropy in Poland, the Forum of Trade Unions<br />
and Newsweek.<br />
The Company was granted the fourth position in the category of major companies<br />
in the first edition of the “Lubuskie Business Leader” competition organized<br />
by the Western Industry and Trade Chamber in Gorzów Wielkopolski and regional<br />
media.<br />
The Company was granted the second position in the 16th edition of the competition<br />
for “Employers guaranteeing safe labor” in the category of companies<br />
employing more than 250 workers organized by the District Labor Inspectorate<br />
in Zielona Góra.<br />
In November 2009, the Company was granted the laureate position in the 2009<br />
White Tiger Energy Producer contest organized by the Agency for Energy Promotion<br />
in the category of complex organizational and technological modernizations<br />
of the heat distribution system in Zielona Góra (from the source to the end user).<br />
- 22 - - 2 -
Raport Financial Report<br />
ekonomiczno-finansowy<br />
- 24 - - 25 -
BILANS NA DZIEń 31 GRUDNIA 2009 (w tys. zł)<br />
BALANCE SHEET ON DECEMBER 31 st 2009 (in PLN thousand)<br />
- 26 -<br />
<strong>ELEKTROCIEPŁOWNIA</strong><br />
<strong>„ZIELONA</strong> <strong>GÓRA”</strong> S.A. Raport Roczny / Annual Report 2 0 0 9<br />
AKTYWA / ASSETS 31.12.2009 r. 31.12.2008 r.<br />
Aktywa trwałe / Fixed assets 453 931,6 443 488,1<br />
Wartości niematerialne i prawne / Intangible assets 1 011,6 440,8<br />
Rzeczowe aktywa trwałe / Tangible fixed assets 44 119,5 401 028,1<br />
Należności długoterminowe / Long-term receivables - -<br />
Inwestycje długoterminowe / Long-term investments 6 5,6 0 26,7<br />
Długoterminowe rozliczenia międzyokresowe<br />
Long-term prepayments and deffered costs 9 164,9 11 692,5<br />
Aktywa obrotowe / Current assets 247 009,9 144 972,0<br />
Zapasy / Inventories 18 656,7 14 50 ,2<br />
Należności krótkoterminowe / Current receivables 55 4 9,7 50 67,2<br />
Inwestycje krótkoterminowe / Current investments 170 748,0 78 788,9<br />
Krótkoterminowe rozliczenia międzyokresowe<br />
Current prepeyments and deferred costs 2 165,5 1 12,7<br />
SUMA AKTYWÓW / TOTAL ASSETS 700 941,5 588 460,1<br />
PASYWA / LIABILITIES 31.12.2009 r. 31.12.2008 r.<br />
Kapitał (fundusz) własny / Owner’s (fund) Equity 222 253,9 144 359,0<br />
Kapitał (fundusz) podstawowy / Share (fund) capital 1 85 ,2 1 199,9<br />
Kapitał (fundusz) zapasowy / Supplementary (fund) capital 72 848,0 6 812,1<br />
Kapitał (fundusz) rezerwowy z aktualizacji wyceny<br />
Revaluation reserve 15 950,5 15 95 ,<br />
Pozostałe kapitały (fundusze) rezerwowe / Other reserve 45 4 1,8 0 4 1,8<br />
Zysk (strata) z lat ubiegłych<br />
Retained profit (loss) (19 126,7) -<br />
Zysk (strata) netto<br />
Retained earnings (acumulated losses) brought forward 9 297,1 20 961,9<br />
Zobowiązania i rezerwy na zobowiązania<br />
Liabilities and provisions for Liabilities 478 687,6 444 101,1<br />
Rezerwy na zobowiązania / Provisions for liabilities 25 045,4 17 701,1<br />
Zobowiązania długoterminowe / Long-term liabilities 04 40 ,8 24 82 ,2<br />
Zobowiązania krótkoterminowe / Current liabilities 110 642,9 69 655,4<br />
Rozliczenia międzyokresowe / Accruals and deferred income 8 595,5 1 921,4<br />
SUMA PASYWÓW / TOTAL LIABILITIES AND EQUITY 700 941,5 588 460,1<br />
RACHUNEK ZYSKÓW I STRAT (w tys. zł)<br />
PROFIT AND LOSS ACCOUNT (in PLN thousand)<br />
2009 r. 2008 r.<br />
PRZYCHODY NETTO ZE SPRZEDAŻY I ZRÓWNANE Z NIMI<br />
NET SALES 384 259,0 302 495,4<br />
KOSZTY DZIAŁALNOŚCI OPERACYJNEJ<br />
OPERATING EXPENSES 255 182,9 258 251,3<br />
Amortyzacja / Amortisation and depreciation 1 958,9 42 871,7<br />
Zużycie materiałów i energii / Materials and energy used 161 448,0 144 221,6<br />
Usługi obce / External services 19 895,4 17 811,0<br />
Podatki i opłaty, w tym: / Taxes and fees 11 471, 27 712,4<br />
- podatek akcyzowy / excise duty 4 690,5 2 10,1<br />
Wynagrodzenia / Salaries 19 540,6 16 774,8<br />
Ubezpieczenia społeczne i inne świadczenia<br />
Social security and other benefis 7 080,1 6 451,8<br />
Pozostałe koszty rodzajowe / Other expenses by nature 672,4 2 201,4<br />
Wartość sprzedanych towarów i materiałów<br />
Value of sold goods and materials 116,2 206,6<br />
ZYSK ZE SPRZEDAŻY / PROFIT ON SALES 129 076,1 44 244,1<br />
POZOSTAŁE PRZYCHODY OPERACYJNE<br />
OTHER OPERATING INCOME 3 520,0 4 320,5<br />
POZOSTAŁE KOSZTY OPERACYJNE<br />
OTHER OPERATING EXPENSES 1 095,8 1 230,0<br />
ZYSK Z DZIAŁALNOŚCI OPERACYJNEJ<br />
OPERATING PROFIT 131 500,3 47 334,6<br />
PRZYCHODY FINANSOWE / FINANCIAL INCOME 6 060,7 6 456,6<br />
KOSZTY FINANSOWE / FINANCIAL COSTS 22 218,7 27 828,7<br />
ZYSK BRUTTO / PROFIT BEFORE TAX 115 342,3 25 962,5<br />
PODATEK DOCHODOWY / INCOME TAX 22 045,2 5 000,6<br />
ZYSK NETTO / PROFIT NET 93 297,1 20 961,9<br />
ZESTAWIENIE ZMIAN W KAPITALE WŁASNYM (w tys. zł)<br />
STATEMENT OF CHANGES IN EQUITY (in PLN thousand)<br />
2009 r. 2008 r.<br />
I. Kapitał własny na początek okresu<br />
Equity at the beginning of the period 144 359,0 139 765,2<br />
1. Kapitał zakładowy na początek okresu<br />
Share capital at the beginning of the period 13 199,9 13 199,9<br />
a) zwiększenie (z tytułu) / increase (due to) 65 , -<br />
- emisja akcji / share issue 65 , -<br />
1.1. Kapitał zakładowy na koniec okresu<br />
Share capital at the end of the period 1 85 ,2 1 199,9<br />
2. Kapitał zapasowy na początek okresu<br />
Supplementary capital at the beginning of the period 63 812,2 63 724,1<br />
2.1. Zmiany kapitału zapasowego / Changes in supplementary capital 9 0 5,8 88,0<br />
a) zwiększenie (z tytułu) / increase (due to) 9 0 5,8 88,0<br />
- emisja akcji powyżej wartości nominalnej<br />
share issue above denominational value 9 024,2 -<br />
- z podziału zysku / profit share 8,8 77,4<br />
- z przeniesienia z kapitału rezerwowego z aktualizacji wyceny<br />
transfer from the revaluation reserve 2,8 10,6<br />
2.2. Kapitał zapasowy na koniec okresu<br />
Supplementary capital at the end of the period 72 848,0 63 812,1<br />
3. Kapitał rezerwowy z aktualizacji wyceny na początek okresu<br />
Revaluation reserve at the beginning of the period 15 953,3 15 964,0<br />
.1. Zmiany kapitału rezerwowego z aktualizacji wyceny<br />
Changes in revaluation reserve 2,8 10,6<br />
a) zmniejszenie (z tytułu) / decrease (due to) 2,8 10,6<br />
- zbycie i likwidacje środków trwałych / sale and liquidation of fixed assets 2,8 10,6<br />
.2. Kapitał rezerwowy z aktualizacji wyceny na koniec okresu<br />
Revaluation reserve at the end of the period 15 950,5 15 953,3<br />
4. Pozostałe kapitały rezerwowe na początek okresu<br />
Other reserve capital at the beginning of the period 30 431,8 21 011,8<br />
4.1. Zmiany pozostałych kapitałów rezerwowych<br />
Changes in other reserve capital 15 000,0 9 420,0<br />
a) zwiększenie (z tytułu) / increase (due to) 15 000,0 9 420,0<br />
- odpis z zysku roku ubiegłego / profit transfer from the previous year 15 000,0 9 420,0<br />
4.2. Pozostałe kapitały rezerwowe na koniec okresu<br />
Other reserve capital at the end of the period 45 4 1,8 0 4 1,8<br />
5. Zysk/(Strata) z lat ubiegłych na początek okresu<br />
Profit/(Loss) from previous years at the beginning of the period 20 961,9 25 865,3<br />
5.1. Zysk z lat ubiegłych na początek okresu<br />
Profit from previous years at the beginning of the period 40 088,6 25 865,<br />
b) zmniejszenie (z tytułu) / decrease (due to) (40 088,6) (25 865, )<br />
- odpis na kapitał rezerwowy / transfer to reserve capital (15 000,0) (9 420,0)<br />
- dywidenda dla akcjonariuszy / dividend for shareholders (25 079,8) (16 67,9)<br />
- odpis na kapitał zapasowy / transfer to the initial capital (8,8) (77,4)<br />
6. Zysk/(Strata) z lat ubiegłych na koniec okres<br />
Profit /(Loss) from previous years at the end of the period (19 126,7) -<br />
7. Wynik netto / Net result 93 297,1 20 961,9<br />
II. Kapitał własny na koniec okresu<br />
Equity and the end of the period 222 253,9 144 359,0<br />
III. Kapitał własny, po uwzględnieniu proponowanego<br />
podziału zysku (pokrycia straty)<br />
Equity after proposed distribution of profit (coverage of loss) 222 253,9 144 359,0<br />
- 27 -
RACHUNEK PRZEPŁYWÓW PIENIĘŻNYCH (w tys. zł)<br />
PROFIT AND LOSS ACCOUNT (in PLN thousand)<br />
A. PRZEPŁYWY ŚRODKÓW PIENIĘŻNYCH Z DZIAŁALNOŚCI OPERACYJNEJ<br />
CASH FLOWS FROM OPERATING ACTIVITIES<br />
2009 r. 2008 r.<br />
I. Zysk (Strata) netto / Net profit (Loss) 93 297,1 20 961,9<br />
II. Korekty razem / Adjustments<br />
1. Amortyzacja / Amortisation and depreciation 1 958,9 42 871,7<br />
2. Odsetki i udziały w zyskach (dywidendy)<br />
Interest and participation in profits (dyvidends) 1 406,9 22 290,9<br />
. (Zysk) / strata z działalności inwestycyjnej<br />
Gains/losses on investing activities ( 4,6) 70,9<br />
4. Zmiana stanu rezerw / Increase/decrease in provisions 609,9 10 699,6<br />
5. Zmiana stanu zapasów / Increase/decrease in inventory (4 105,9) (9 618,7)<br />
6. Zmiana stanu należności / Increase/decrease in receivables (8 772,4) 5 48,<br />
7. Zmiana stanu zobowiązań krótkoterminowych (z wyjątkiem<br />
pożyczek i kredytów) / Increase/decrease<br />
in current liabilities (excluding loans and overdrafts) 60 0 4,0 15 797,<br />
8. Zmiana stanu rozliczeń międzyokresowych<br />
Increase/decrease in prepayments and accruals 4,7 (7 588,2)<br />
9. Inne korekty / Other adjustments (4 2,6) -<br />
III. Przepływy pieniężne netto z działalności operacyjnej (I +/- II)<br />
Net cash from/used in operating activities (I +/- II) 188 996,0 100 833,8<br />
B. PRZEPŁYWY ŚRODKÓW PIENIĘŻNYCH Z DZIAŁALNOŚCI INWESTYCYJNEJ<br />
CASH FLOWS FROM INVESTING ACTIVITIES<br />
I. Wpływy / Cash inflows 6 424,3 5 524,0<br />
- 28 -<br />
<strong>ELEKTROCIEPŁOWNIA</strong><br />
<strong>„ZIELONA</strong> <strong>GÓRA”</strong> S.A. Raport Roczny / Annual Report 2 0 0 9<br />
1. Zbycie wartości niematerialnych i prawnych oraz rzeczowych<br />
aktywów trwałych / Sale of intangible assets<br />
and tangibl fixed assets 11,8 ,7<br />
2. Z aktywów finansowych / From financial assets 5 921, 5 520,<br />
a) w pozostałych jednostkach / in other parties 5 921, 5 520,<br />
- zbycie aktywów finansowych / Sale of financial assets 89,4 -<br />
- spłata udzielonych pożyczek długoterminowych<br />
payment of long-term loans 22,4 54,1<br />
- odsetki / interest 5 809,5 5 466,2<br />
. Inne wpływy inwestycyjne / other cash inflows<br />
from investng activities 491,2 -<br />
2009 r. 2008 r.<br />
II. Wydatki / Cash outflows (14 395,0) (12 051,6)<br />
1. Nabycie wartości niematerialnych i prawnych oraz<br />
rzeczowych aktywów trwałych<br />
Purchase of intangible assets and tangible fixed assets (14 95,0) (12 051,6)<br />
III. Przepływy pieniężne netto z działalności inwestycyjnej (I - II)<br />
Net cash from/used in investing activities (I-II) (7 970,7) (6 527,6)<br />
C. PRZEPŁYWY ŚRODKÓW PIENIĘŻNYCH Z DZIAŁALNOŚCI FINANSOWEJ<br />
NET CASH FROM/USED IN INVESTING ACTIVITIES (I-II)<br />
I. Wydatki / Cash outflows (88 986,1) (101 841,5)<br />
1. Dywidendy i inne wypłaty na rzecz właścicieli / dividends paid (25 079,8) (16 67,9)<br />
2. Spłaty kredytów i pożyczek / Payment of credits and loans (44 15,4) (57 170,1)<br />
. Płatności zobowiązań z tytułu umów leasingu finansowego<br />
Payment of dues resulting from financial leasing contracts (20,1) (17,5)<br />
4. Odsetki / Interest paid (19 570,8) (28 286,0)<br />
III. Przepływy pieniężne netto z działalności finansowej (I - II)<br />
Net cash from /used in financing activities (I - II) (88 986,1) (101 841,5)<br />
D. PRZEPŁYWY PIENIĘŻNE NETTO RAZEM (A.III +/- B.III. +/- C.III.)<br />
NET INCREASE/DECREASE IN CASH AND CASH 92 039,2 (7 535,2)<br />
E. BILANSOWA ZMIANA STANU ŚRODKÓW PIENIĘŻNYCH<br />
CHANGE IN CASH AND CASH EQUIVALENT IN THE BALANCE SHEET 92 039,2 (7 535,2)<br />
F. ŚRODKI PIENIĘŻNE NA POCZĄTEK OKRESU<br />
CASH AND CASH EQUIVALENTS AT START OF YEAR 78 706,9 86 242,1<br />
G. ŚRODKI PIENIĘŻNE NA KONIEC OKRESU (F +/- D), w tym:<br />
CASH AND CASH EQUIVALENTS AT END OF YEAR 170 746,1 78 706,9<br />
- w tym o ograniczonej możliwości dysponowania<br />
restricted cash and cash equivalents 52 798,1 41 107,9
<strong>ELEKTROCIEPŁOWNIA</strong> <strong>„ZIELONA</strong> <strong>GÓRA”</strong> S.A., ul. Zjednoczenia 103, 65-120 Zielona Góra, PL<br />
tel. +48 68 455 94 44, fax. +48 68 327 10 60<br />
kancelaria@ec.zgora.pl, www.ec.zgora.pl<br />
© www.gorscy.com.pl, Foto Piotr Górski