31.12.2012 Views

Peter Engbers - Plenum 3 - Integrated Operations 2013

Peter Engbers - Plenum 3 - Integrated Operations 2013

Peter Engbers - Plenum 3 - Integrated Operations 2013

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5. Improved Integration; 4D Automatic History Matching<br />

Challenge<br />

� Obtain in less time more accurate reservoir models which are consistent<br />

with available production and 4D seismic data<br />

Solution<br />

� Novel methodologies for (semi-)automated “history matching“ of reservoir<br />

models have been developed, demonstrated, and deployed to Assets<br />

Business Impact<br />

� History match performed in less time (5 months<br />

reduction achieved)<br />

� History match led to more realistic models and<br />

improved reservoir understanding<br />

� Technology first � quantitative use of 4D seismic<br />

data<br />

� Workflows adopted in Assets can be easily<br />

replicated<br />

� Successfully handed over to staff in Assets<br />

� Plan for global deployment<br />

initial<br />

Simulation<br />

results<br />

Sat<br />

blue = water<br />

new<br />

Simulation<br />

results with 4D<br />

Sat<br />

blue = water

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!