31.12.2012 Views

Peter Engbers - Plenum 3 - Integrated Operations 2013

Peter Engbers - Plenum 3 - Integrated Operations 2013

Peter Engbers - Plenum 3 - Integrated Operations 2013

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1. The case for Areal Surveillance (value / impact)<br />

Model<br />

uncertainty<br />

reduction<br />

•Drainage patterns<br />

•Fluid front rates<br />

•Compartmentalization<br />

•Improved resolution<br />

•Scenario choice<br />

FDP<br />

$ wells<br />

saved<br />

Avoid:<br />

•Wasted wells<br />

•Disconnected<br />

injectors Producers<br />

watering out<br />

Copyright of Shell International E&P BV<br />

The Netherlands<br />

Model<br />

$ improved<br />

model<br />

•Better forecasts<br />

•Better plans<br />

UR & Production<br />

$ enhanced<br />

recovery<br />

•Increase ultimate<br />

recovery<br />

•Accelerate hydrocarbon<br />

recovery<br />

•See un-drained reserves<br />

•Assist Waterflood/EOR<br />

WRM/FDP<br />

$ improved well<br />

performance<br />

•Better well positions<br />

(producers or injectors).<br />

•Control existing wells to:<br />

Increase rates / UR,<br />

Reduce water/gas cut<br />

HSE<br />

$ Integrity<br />

•Drill safely into<br />

partially depleted reservoir<br />

•Containment monitoring<br />

•Blow-out monitoring<br />

•Out of zone inj. monitoring<br />

•Safe injection monitoring<br />

•Safe disposal monitoring<br />

May 2010<br />

5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!