You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
NUMBER DATBI. TITLB AND CHANGES<br />
SIGNAL-Continued<br />
TB<br />
SIGI32’ 15 Nov. 4.4.1 Digest of Field Reports for Ground<br />
Radar Equipment. C 1, 2.<br />
SIG 133 Nov. 44. Emergency Fuel Tank Support Modification<br />
on Power Units PE-74 and PE-84.<br />
SIG 134 Nov. 44. Dynamotor<br />
ment Plan.<br />
Limited Repairs and Replace-<br />
SIG135 Nov. 44. Watersealing Mast Bases MY48 and<br />
MP-48-A.<br />
SIG 13’7 Nov. 44. Plan for Disposition of Scaled Transmitter<br />
and Receiver Units of Microphones, Telephone<br />
Transmitters, and Receivers.<br />
SIG 138 Nov. 14. Construction of Separator Ring for<br />
Type CR Collapsible Power Reel.<br />
SIG 139 ,Dec. 44. Replacement for Main Bearings in Power<br />
Unit PE-198, Part of Radio Set SCR-588.<br />
SIG 140 Dec. 44. Waterproofing Interphone Equipment<br />
RC-99 Installed in Carriage, Motor, 76-mm Gun<br />
Ml8 (T70).<br />
*SIG 143 Dec. 44. Installation Instructions for Vehicular<br />
Radio Sets.<br />
*SIG 148 Dec. 44. Plan for Maintenance of Photographic<br />
and Projector Equipment used by Army Ground<br />
Forces and Army Service Forces.<br />
*SIG 151 Jan. 45. Tube Puller TL-201 for use with Radic<br />
Sets SCR-694-C and ANITRC-2.<br />
*SIG 152 Jan. 45. Instructions for Installation and use oi<br />
Test Set 1-209-A and B for Monitoring Power Unil<br />
<strong>Us</strong>ed with Radiosonde Receptor ANI<strong>FM</strong>Q-1.<br />
*SIG 153 Jan. 45. Transformer TF-13.<br />
*SIG 154 Jan. 45. General Standards for Vehicular An<br />
tenna Installations.<br />
*SIG 155 Jan. 45. Headset-Microphone Assembly AN!<br />
SIG E2<br />
URA-1.<br />
28 Jan. 44. German Radio Set Torn. Fu. d2.<br />
SIG E3 10 Feb. 44. German Radio Set, Torn. E. b.<br />
SIG E4 25 Feb. 44. German Radio Receiver, Spez 445b BS<br />
SIG E5 8’Mar. 44. German Radio Transmitters and 10 W.<br />
S.c and 10 W. Sh. and German<br />
U k w. E.e and Ukw. E. h.<br />
Radio Receivers<br />
SIG E7 17 Mar. 44. German Radio Set Fusprecb. a.<br />
SIG E8 29 Mar. 44. German Radio Transmitters<br />
and 20 W.S.d.<br />
20 W.S. c<br />
SIG E9 10 Apr. 44. German Radio Transmitter 100 W.S.<br />
SIG El0 15 Apr. 44. German Radio Transmitter 80 W. S. a<br />
SIG El1 10 May 44. German Radio Transmitter 30 W. S. a<br />
SIG El2 15 May 44. German Radio Sets Feldfu. b anC<br />
Feldfu. c.<br />
SIG El3 25 May 44. German Radio Set SE 469 A.<br />
SIGE14 5 Jun. 44. German Radio Receiver Kw. E.A.<br />
SIG El5 26 Jun. 44. Description and <strong>Us</strong>e of Captured En<br />
emy Field Wire and Cable.<br />
SIG El6 12 Aug. 44. German Radio Set Torn. Fu. g.<br />
.SIGE17 25 Oct. 44. Japanese Radio Set, Model 94 Marl<br />
6 Wireless Set Mark 23 Type H. Transmitter.<br />
SIG El8 8 Nov. 44. Japanese Radio Set, Model 9’7 Ligh:<br />
Wireless Set.<br />
*SIG El9 6 Dec. 44. Japanese Radio Set Model 94 Marl<br />
5 Wireless Set Mark 32 Type Transmitter<br />
Type Receiver.<br />
Mark 3:<br />
*.SIG E20 Dec. 44. Power Supplies for German Radio Sets<br />
63<br />
NUMBER DATPl. TITLB AXD CWGIOI<br />
TM<br />
TRANSPORTATION<br />
55-270-l 27 Jul. 44. Transportation Corps General Instrua<br />
tions for Operation and Care of Lo<strong>com</strong>otives and<br />
Lo<strong>com</strong>otive Cranes.<br />
55-270-2 8 Aug. 44. Feedwater Treatment and Wash-Out<br />
Procedure for Lo<strong>com</strong>otive and Lo<strong>com</strong>otive Crane<br />
Boilers.<br />
55-270-3 24 Aug. 44. Echelon Maintenance Schedule For<br />
Lo<strong>com</strong>otives and Lo<strong>com</strong>otive Cranes In Zone of In-<br />
terior and Contiguous Departments and Commands. ’<br />
65-270-4 23 Aug. 44. Preventive Maintenance Schedule For<br />
Internal Combustion Lo<strong>com</strong>otives and Lo<strong>com</strong>otive<br />
Cranes.<br />
55-275-l 1 Apr. 44. Standard Plans Roadway. Track, and<br />
Structures.<br />
55-285-2 24 Aug. 44. Detailed Instructions For First and<br />
Third Echelon Maintenance of Hospital Cars in Zone<br />
of Interior.<br />
TCl 29 Jan. 44. Feedwater Treatment for Lo<strong>com</strong>otive<br />
and Lo<strong>com</strong>otive-Crane Boilers.<br />
TC2 18 Apr. 44. Boiler Wash-out Procedure.<br />
31. TECHNICAL MANUALS. (For description sea<br />
Par. 9)<br />
NUMBER DATE, TITLE AND CHANGES<br />
AIR<br />
TM<br />
l-205 25 Nov. 40. Air Navigation. C1.<br />
l-206 4 Mar. 41. Celestial Air Navigation. %I..<br />
l-208 5 Jun. 42. Air Navigation Tables. CI.<br />
1-<strong>21</strong>9 1 Jul. 41. Basic Photography. C1.<br />
l-220 26 Nov. 42. Aerial Photography. Cl.<br />
l-230 27 May 40. Weather Manual For Pilots,<br />
l-231 10 Feb. 43. Elementary<br />
Trainees.<br />
Weather for Air Crew<br />
l-232 22 Apr. 42. Basic Weather for Pilot Trainees. Cl.<br />
l-233 30 Dec. 43. Elementary<br />
Trainees.<br />
Physics for Air Crew<br />
l-235 29 Jun. 42. The Weather Observer. 45 Supp.<br />
l-240 17 Jan. 44. Arctic Manual.<br />
l-250 15 Jan. 43. Precision Bombing Practice. C I,$$, a,.$: 6.<br />
1-251 31 Mar. 41. Handbook for Bombardiers.<br />
l-252 20 Jul. 43. Bombing Aids.<br />
l-260 14 Dec. 42. Dive Bombing.<br />
l-270 7 May 42. Aerial<br />
ing. Cl,%<br />
Gunnery Practice and Record Firl-273<br />
15 Dec. 42. Fixed Aerial<br />
tative) .<br />
and Ground Gunnery (tenl-282<br />
27 Feb. 43. Tactics and Technique of Air Chemical<br />
Spraymg. C 1,2, S.<br />
l-305 25 Apr. 40. Theory of Ballooning.<br />
1-315 1 Oct. 40. Hydrogen.<br />
l-320 11 Feb. 41. Airship Aerodynamics.<br />
l-325 1 Oct. 40. Aerostatics.<br />
l-350 b Jan. 44% Height Finding with the SCR-5374<br />
IThis Technical Manual ia distributed only to interested beadqrurtm<br />
and to individuals whose duties require that they have it. This Technical<br />
Manual must be safeguarded in accordance with provisions of AR 8804,<br />
’