Operation Description<br />

Market-Based Advanced Coal Power Systems<br />

For the purposes of this conceptual design, limestone will be delivered to the plant by 25-ton<br />

trucks.<br />

The limestone is unloaded onto a storage pile located above vibrating feeders. The limestone is<br />

fed onto belt conveyors via vibrating feeders and then to a day bin equipped with vent filters. The<br />

day bin supplies a 100 percent capacity size ball mill via a weigh feeder. The wet ball mill accepts<br />

the limestone and grinds the limestone to 90 to 95 percent passing 325 mesh (44 microns). Water<br />

is added at the inlet to the ball mill to create a limestone slurry. The reduced limestone slurry is<br />

then discharged into a mill slurry tank. Mill recycle pumps, two per tank, pump the limestone<br />

water slurry to an assembly of hydroclones and distribution boxes. The slurry is classified into<br />

several streams, <strong>based</strong> on suspended solids content and size distribution.<br />

The hydroclone underflow is directed back to the mill for further grinding. The hydroclone<br />

overflow is routed to a reagent storage tank. Reagent distribution pumps direct slurry from the<br />

tank to the absorber module.<br />

Technical Requirements and Design Basis<br />

• Limestone usage rate:<br />

– Maximum limestone usage rate = 30,250 lb/h = 15.15 tph plus 10% margin = 16.6 tph<br />

(<strong>based</strong> on operating at MCR; 155 tph firing rate for design <strong>coal</strong> and 80% CaCO3 in the<br />

limestone)<br />

– Average limestone usage rate = 25,700 lb/h = 13 tph (<strong>based</strong> on maximum limestone usage<br />

rate multiplied by 85% capacity factor)<br />

• Limestone delivered to the plant by 25-ton dump trucks<br />

• Total number of trucks per day = 16<br />

• Total unloading time per day = 4 hours<br />

• Total time, interval per truck = 15 minutes/truck<br />

3.1-13 December 1998