23.09.2012 Views

CABLES AND WIRES - Meinhart Kabel Österreich Gmbh

CABLES AND WIRES - Meinhart Kabel Österreich Gmbh

CABLES AND WIRES - Meinhart Kabel Österreich Gmbh

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table of Contents - General Information<br />

Drum overview Page<br />

Drum conditions 244<br />

Dimensions, weights, prices 245<br />

Capacity of cable drums 246<br />

Drum assignment with reference to the cable or wire diameter and<br />

the smallest admissible drum core diameter 247<br />

Conductor construction for insulated cables and wires<br />

Conductor construction 248<br />

Construction and conductor resistance 249<br />

Conversion table for standard cross sections 250<br />

Capacitance according National Electric Code (NEC) 251<br />

Insulation and sheath materials 252<br />

Mechanical, thermal, electrical and chemical properties of insulation and sheath materials 253<br />

Abbreviation key for<br />

Wires according to harmonized requirements 254<br />

Power Cables 255<br />

Telecommunication cables 256<br />

Core identification for<br />

Cables and wires 257<br />

Core colour-coding of PVC control lines with 6 or more coloured cores 258<br />

Electronic cables 259<br />

Telecommunication cables according to VDE 260<br />

Telecommunication cables according to ÖVE 261<br />

Data transmission cables category 5 262<br />

Laying references<br />

Guidelines fort he laying of cables in cable chains 263<br />

Hints about transport, storage, and laying of data transmission cables Cat.5, Cat.6 and Cat.7 263<br />

Permissible bending radii and Temperatures for laying at harmonized Wires 264<br />

Permissible bending radii and Temperatures for laying at non harmonized Wires 265<br />

Permissible laying temperatures and pull-forces for installation 266<br />

Delivery and payment conditions<br />

General delivery and payment conditions 267 / 268<br />

Metal charges and ground plan<br />

Metal charges 269 / 270<br />

Ground plan 271<br />

243

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!