Patrick Bellew - resource05
Patrick Bellew - resource05
Patrick Bellew - resource05
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
New approaches to sustainable cooling for non domestic buildings<br />
<strong>Patrick</strong> <strong>Bellew</strong><br />
FREng CEng HonFRIBA FRSA FCIBSE FEI<br />
Consulting environmental engineers and designers<br />
London and New York<br />
www.atelierten.com
KIMBERLIN LIBRARY, Leicester - Eva Jiricna Architects<br />
© atelier ten 2005
KIMBERLIN LIBRARY, Leicester - Eva Jiricna Architects<br />
© atelier ten 2005
BRE Building – Feilden Clegg Bradley Architects<br />
© atelier ten 2005
PORTCULLIS HOUSE – Michael Hopkins Architects<br />
© atelier ten 2005
THE BAROSSA TERMITE<br />
© atelier ten 2005
THE BAROSSA TERMITE<br />
© atelier ten 2005
THE BAROSSA TERMITE<br />
© atelier ten 2005
THE BAROSSA TERMITE<br />
© atelier ten 2005
De-Coupled Thermal Storage<br />
© atelier ten 2005
THE EARTH CENTRE<br />
© atelier ten 2005
THE EARTH CENTRE, Doncaster – Feilden Clegg Bradley Architects<br />
© atelier ten 2005
THE EARTH CENTRE – Feilden Clegg Bradley Architects<br />
AIR RUNS THROUGH LABYRINTH AND THROUGH<br />
BY-PASS DUCT TO AVOID OVER-COOLING THE<br />
GALLERY SPACE<br />
AIR IS INPUT TO GALLERY UNTIL DESIGN<br />
TEMPERATURE IS REACHED - THEN DOORS MOVE<br />
TO BY-PASS<br />
© atelier ten 2005
THE EARTH CENTRE – Feilden Clegg Bradley Architects<br />
AIR IS INTRODUCED TO GALLERY THROUGH FLOOR<br />
DISPLACEMENT TERMINALS AT LOW VELOCITY, HEAT<br />
GAINS ARE DISPLACED UPWARDS<br />
AIR RUNS THROUGH THE LABYRINTH AND IS<br />
COOLED BY THE LARGE SURFACE AREA OF<br />
COOLED WALL BEFORE BEING INTRODUCED TO<br />
THE SPACE<br />
© atelier ten 2005
THE EARTH CENTRE – Feilden Clegg Bradley Architects<br />
LABYRINTH, construction 1998<br />
© atelier ten 2005
THE EARTH CENTRE – Feilden Clegg Bradley Architects<br />
LABYRINTH, construction 1998<br />
© atelier ten 2005
THE EARTH CENTRE – Feilden Clegg Bradley Architects<br />
© atelier ten 2005
FEDERATION SQUARE - Lab Architecture Studio<br />
© atelier ten 2005
FEDERATION SQUARE - Lab Architecture Studio<br />
© atelier ten 2005
FEDERATION SQUARE - Lab Architecture Studio<br />
PLAN AT SUB - PLAZA LEVEL<br />
LABYRINTH<br />
© atelier ten 2005
FEDERATION SQUARE - Lab Architecture Studio<br />
© atelier ten 2005
FEDERATION SQUARE - Lab Architecture Studio<br />
• External Air is pushed through the<br />
Labyrinth in Plant 1.<br />
• The BMS controls dampers in the<br />
Labyrinth to either store or discharge<br />
coolth.<br />
• Air is drawn from a common Plenum<br />
into plants 2,3 or 4 from where it is<br />
supplied to the Atria or Cinemedia<br />
Gallery.<br />
SYSTEM FLOW DIAGRAM<br />
FRESH AIR INTO<br />
PLANT<br />
AIR SUPPLY TO<br />
ATRIUM<br />
AIR SUPPLY<br />
TO ATRIUM 2<br />
AND<br />
CINEMEDIA<br />
GALLERY<br />
© atelier ten 2005
FEDERATION SQUARE - Lab Architecture Studio<br />
© atelier ten 2005
FEDERATION SQUARE - Lab Architecture Studio<br />
© atelier ten 2005
FEDERATION SQUARE - Lab Architecture Studio<br />
© atelier ten 2005
FEDERATION SQUARE - Lab Architecture Studio<br />
SUMMER PERFORMANCE – Dynamic Simulation<br />
© atelier ten 2005
FEDERATION SQUARE - Lab Architecture Studio<br />
© atelier ten 2005
FEDERATION SQUARE - Lab Architecture Studio<br />
ENERGY CONSUMPTION<br />
ENERGY CONSUMPTION<br />
© atelier ten 2005
Alpine House,<br />
Royal Botanic Gardens, Kew<br />
Wilkinson Eyre Architects, 2005<br />
© atelier ten 2005
ALPINE HOUSE, KEW GARDENS – Wilkinson Eyre Architects<br />
© atelier ten 2005
ALPINE HOUSE, KEW GARDENS – Wilkinson Eyre Architects<br />
© atelier ten 2005
ALPINE HOUSE, KEW GARDENS – Wilkinson Eyre Architects<br />
© atelier ten 2005
ALPINE HOUSE, KEW GARDENS – Wilkinson Eyre Architects<br />
© atelier ten 2005
ALPINE HOUSE, KEW GARDENS – Wilkinson Eyre Architects<br />
© atelier ten 2005
ALPINE HOUSE, KEW GARDENS – Wilkinson Eyre Architects<br />
© atelier ten 2005
ALPINE HOUSE, KEW GARDENS – Wilkinson Eyre Architects<br />
© atelier ten 2005
EARTH COUPLED COOLING<br />
Butterfield, Luton UK<br />
Hamilton Associates<br />
© atelier ten 2005
BUTTERFIELD, Hamilton Associates<br />
© atelier ten 2005
BUTTERFIELD, Hamilton Associates<br />
© atelier ten 2005
© atelier ten 2005
BUTTERFIELD, Hamilton Associates<br />
Development Center<br />
AUDI<br />
by Transsolar Energietechnik<br />
GmbH<br />
Earth duct<br />
© atelier ten 2005
BUTTERFIELD, Hamilton Associates<br />
Mercedes Forum, Stuttgart<br />
by Transsolar Energietechnik<br />
GmbH<br />
Earth duct<br />
© atelier ten 2005
BUTTERFIELD, Hamilton Associates<br />
© atelier ten 2005
BUTTERFIELD, Hamilton Associates<br />
Thermal Simulation using Trnsys<br />
Temperature (ºC)<br />
30<br />
28<br />
26<br />
24<br />
22<br />
20<br />
18<br />
16<br />
14<br />
12<br />
10<br />
24.Jun 14:00<br />
24.Jun 18:00<br />
24.Jun 22:00<br />
25.Jun 02:00<br />
25.Jun 06:00<br />
25.Jun 10:00<br />
25.Jun 14:00<br />
25.Jun 18:00<br />
Simulated Temperatures in Building 420<br />
Enhanced Ventilation & Heavyweight Roof<br />
External Air Temperature Operative Temperature West Zone Operative Temperature East Zone Ceiling Surface Temp. Supply Air Temperature -Earth Duct<br />
25.Jun 22:00<br />
26.Jun 02:00<br />
26.Jun 06:00<br />
26.Jun 10:00<br />
26.Jun 14:00<br />
26.Jun 18:00<br />
26.Jun 22:00<br />
27.Jun 02:00<br />
27.Jun 06:00<br />
27.Jun 10:00<br />
27.Jun 14:00<br />
27.Jun 18:00<br />
27.Jun 22:00<br />
28.Jun 02:00<br />
© atelier ten 2004<br />
28.Jun 06:00<br />
© atelier ten 2005
BUTTERFIELD, Hamilton Associates<br />
Thermal Simulation using Trnsys<br />
Annual Temperature Distribution<br />
Comfort Temperatures in Building 420 - Heavyweight Roof<br />
Temperature [°C]<br />
28-29<br />
27-28<br />
26-27<br />
25-26<br />
24-25<br />
23-24<br />
22-23<br />
21-22<br />
20-21<br />
18-20<br />
4 hrs<br />
25 hrs<br />
43 hrs<br />
78 hrs<br />
152 hrs<br />
166 hrs<br />
198 hrs<br />
191 hrs<br />
248 hrs<br />
180 hrs<br />
180 hrs<br />
490 hrs<br />
460 hrs<br />
East Zone Operative Temperature<br />
Percentage of occupied hours above 25°C: 1.74%<br />
West Zone Operative<br />
Temperature<br />
Percentage of occupied hours above 25°C: 3.83%<br />
776 hrs<br />
765 hrs<br />
953 hrs<br />
1,000 hrs<br />
0 200 400 600 800 1000 1200<br />
© atelier ten 2005
BUTTERFIELD, Hamilton Associates<br />
Thermal Simulation using Trnsys<br />
Annual Energy Comsumption (Heating and Ventilation)<br />
(excluding lighting and small power)<br />
[kWh/m 2 ]<br />
250<br />
200<br />
150<br />
100<br />
50<br />
0<br />
Fan energy<br />
Gas total<br />
Space heating -Radiators<br />
Air - heating energy<br />
36<br />
2<br />
7<br />
10<br />
7<br />
11<br />
Earthduct system Earthduct system & HR Natural Ventilation Typical AC (Fan-Coils)<br />
65<br />
128<br />
97<br />
© atelier ten 2005
OFFICE DEVELOPMENT, Leeds, Carey Jones Architects<br />
© atelier ten 2005
GROUND COUPLED COOLING<br />
© atelier ten 2005
GROUND SOURCE HEATING<br />
AND COOLING<br />
© atelier ten 2005
KEBLE COLLEGE, Oxford – Rick Mather Architects<br />
© atelier ten 2005
KEBLE COLLEGE, Oxford – Rick Mather Architects<br />
© atelier ten 2005
HEAT PUMP CIRCUIT<br />
GROUND SOURCE HEAT PUMPS<br />
© atelier ten 2005
HEAT PUMP CIRCUIT<br />
GROUND SOURCE HEAT PUMPS<br />
© atelier ten 2005
HEAT PUMP PRINCIPLE<br />
GROUND SOURCE HEAT PUMPS<br />
© atelier ten 2005
KEBLE COLLEGE, Oxford – Rick Mather Architects<br />
© atelier ten 2005
KEBLE COLLEGE, Oxford – Rick Mather Architects<br />
© atelier ten 2005
GEOTHERMAL ENERGY PROPOSAL<br />
Imperial House, Bristol<br />
GROUND SOURCE HEAT PUMPS<br />
© atelier ten 2005
GEOTHERMAL ENERGY PROPOSAL<br />
Imperial House, Bristol<br />
GROUND SOURCE HEAT PUMPS<br />
© atelier ten 2005
GEOTHERMAL ENERGY PROPOSAL<br />
Imperial House, Bristol for URBAN SPLASH<br />
GROUND SOURCE HEAT PUMPS<br />
© atelier ten 2005
GEOTHERMAL ENERGY PROPOSAL<br />
Imperial House, Bristol for URBAN SPLASH<br />
GROUND SOURCE HEAT PUMPS<br />
© atelier ten 2005
GEOTHERMAL ENERGY<br />
© atelier ten 2005
CONSULTING ENVIRONMENTAL ENGINEERS<br />
London + New York<br />
www.atelierten.com