New approaches to sustainable cooling for non domestic buildings<br />

<strong>Patrick</strong> <strong>Bellew</strong><br />

FREng CEng HonFRIBA FRSA FCIBSE FEI<br />

Consulting environmental engineers and designers<br />

London and New York<br />

www.atelierten.com


KIMBERLIN LIBRARY, Leicester - Eva Jiricna Architects<br />

© atelier ten 2005


KIMBERLIN LIBRARY, Leicester - Eva Jiricna Architects<br />

© atelier ten 2005


BRE Building – Feilden Clegg Bradley Architects<br />

© atelier ten 2005


PORTCULLIS HOUSE – Michael Hopkins Architects<br />

© atelier ten 2005


THE BAROSSA TERMITE<br />

© atelier ten 2005


THE BAROSSA TERMITE<br />

© atelier ten 2005


THE BAROSSA TERMITE<br />

© atelier ten 2005


THE BAROSSA TERMITE<br />

© atelier ten 2005


De-Coupled Thermal Storage<br />

© atelier ten 2005


THE EARTH CENTRE<br />

© atelier ten 2005


THE EARTH CENTRE, Doncaster – Feilden Clegg Bradley Architects<br />

© atelier ten 2005


THE EARTH CENTRE – Feilden Clegg Bradley Architects<br />

AIR RUNS THROUGH LABYRINTH AND THROUGH<br />

BY-PASS DUCT TO AVOID OVER-COOLING THE<br />

GALLERY SPACE<br />

AIR IS INPUT TO GALLERY UNTIL DESIGN<br />

TEMPERATURE IS REACHED - THEN DOORS MOVE<br />

TO BY-PASS<br />

© atelier ten 2005


THE EARTH CENTRE – Feilden Clegg Bradley Architects<br />

AIR IS INTRODUCED TO GALLERY THROUGH FLOOR<br />

DISPLACEMENT TERMINALS AT LOW VELOCITY, HEAT<br />

GAINS ARE DISPLACED UPWARDS<br />

AIR RUNS THROUGH THE LABYRINTH AND IS<br />

COOLED BY THE LARGE SURFACE AREA OF<br />

COOLED WALL BEFORE BEING INTRODUCED TO<br />

THE SPACE<br />

© atelier ten 2005


THE EARTH CENTRE – Feilden Clegg Bradley Architects<br />

LABYRINTH, construction 1998<br />

© atelier ten 2005


THE EARTH CENTRE – Feilden Clegg Bradley Architects<br />

LABYRINTH, construction 1998<br />

© atelier ten 2005


THE EARTH CENTRE – Feilden Clegg Bradley Architects<br />

© atelier ten 2005


FEDERATION SQUARE - Lab Architecture Studio<br />

© atelier ten 2005


FEDERATION SQUARE - Lab Architecture Studio<br />

© atelier ten 2005


FEDERATION SQUARE - Lab Architecture Studio<br />

PLAN AT SUB - PLAZA LEVEL<br />

LABYRINTH<br />

© atelier ten 2005


FEDERATION SQUARE - Lab Architecture Studio<br />

© atelier ten 2005


FEDERATION SQUARE - Lab Architecture Studio<br />

• External Air is pushed through the<br />

Labyrinth in Plant 1.<br />

• The BMS controls dampers in the<br />

Labyrinth to either store or discharge<br />

coolth.<br />

• Air is drawn from a common Plenum<br />

into plants 2,3 or 4 from where it is<br />

supplied to the Atria or Cinemedia<br />

Gallery.<br />

SYSTEM FLOW DIAGRAM<br />

FRESH AIR INTO<br />

PLANT<br />

AIR SUPPLY TO<br />

ATRIUM<br />

AIR SUPPLY<br />

TO ATRIUM 2<br />

AND<br />

CINEMEDIA<br />

GALLERY<br />

© atelier ten 2005


FEDERATION SQUARE - Lab Architecture Studio<br />

© atelier ten 2005


FEDERATION SQUARE - Lab Architecture Studio<br />

© atelier ten 2005


FEDERATION SQUARE - Lab Architecture Studio<br />

© atelier ten 2005


FEDERATION SQUARE - Lab Architecture Studio<br />

SUMMER PERFORMANCE – Dynamic Simulation<br />

© atelier ten 2005


FEDERATION SQUARE - Lab Architecture Studio<br />

© atelier ten 2005


FEDERATION SQUARE - Lab Architecture Studio<br />

ENERGY CONSUMPTION<br />

ENERGY CONSUMPTION<br />

© atelier ten 2005


Alpine House,<br />

Royal Botanic Gardens, Kew<br />

Wilkinson Eyre Architects, 2005<br />

© atelier ten 2005


ALPINE HOUSE, KEW GARDENS – Wilkinson Eyre Architects<br />

© atelier ten 2005


ALPINE HOUSE, KEW GARDENS – Wilkinson Eyre Architects<br />

© atelier ten 2005


ALPINE HOUSE, KEW GARDENS – Wilkinson Eyre Architects<br />

© atelier ten 2005


ALPINE HOUSE, KEW GARDENS – Wilkinson Eyre Architects<br />

© atelier ten 2005


ALPINE HOUSE, KEW GARDENS – Wilkinson Eyre Architects<br />

© atelier ten 2005


ALPINE HOUSE, KEW GARDENS – Wilkinson Eyre Architects<br />

© atelier ten 2005


ALPINE HOUSE, KEW GARDENS – Wilkinson Eyre Architects<br />

© atelier ten 2005


EARTH COUPLED COOLING<br />

Butterfield, Luton UK<br />

Hamilton Associates<br />

© atelier ten 2005


BUTTERFIELD, Hamilton Associates<br />

© atelier ten 2005


BUTTERFIELD, Hamilton Associates<br />

© atelier ten 2005


© atelier ten 2005


BUTTERFIELD, Hamilton Associates<br />

Development Center<br />

AUDI<br />

by Transsolar Energietechnik<br />

GmbH<br />

Earth duct<br />

© atelier ten 2005


BUTTERFIELD, Hamilton Associates<br />

Mercedes Forum, Stuttgart<br />

by Transsolar Energietechnik<br />

GmbH<br />

Earth duct<br />

© atelier ten 2005


BUTTERFIELD, Hamilton Associates<br />

© atelier ten 2005


BUTTERFIELD, Hamilton Associates<br />

Thermal Simulation using Trnsys<br />

Temperature (ºC)<br />

30<br />

28<br />

26<br />

24<br />

22<br />

20<br />

18<br />

16<br />

14<br />

12<br />

10<br />

24.Jun 14:00<br />

24.Jun 18:00<br />

24.Jun 22:00<br />

25.Jun 02:00<br />

25.Jun 06:00<br />

25.Jun 10:00<br />

25.Jun 14:00<br />

25.Jun 18:00<br />

Simulated Temperatures in Building 420<br />

Enhanced Ventilation & Heavyweight Roof<br />

External Air Temperature Operative Temperature West Zone Operative Temperature East Zone Ceiling Surface Temp. Supply Air Temperature -Earth Duct<br />

25.Jun 22:00<br />

26.Jun 02:00<br />

26.Jun 06:00<br />

26.Jun 10:00<br />

26.Jun 14:00<br />

26.Jun 18:00<br />

26.Jun 22:00<br />

27.Jun 02:00<br />

27.Jun 06:00<br />

27.Jun 10:00<br />

27.Jun 14:00<br />

27.Jun 18:00<br />

27.Jun 22:00<br />

28.Jun 02:00<br />

© atelier ten 2004<br />

28.Jun 06:00<br />

© atelier ten 2005


BUTTERFIELD, Hamilton Associates<br />

Thermal Simulation using Trnsys<br />

Annual Temperature Distribution<br />

Comfort Temperatures in Building 420 - Heavyweight Roof<br />

Temperature [°C]<br />

28-29<br />

27-28<br />

26-27<br />

25-26<br />

24-25<br />

23-24<br />

22-23<br />

21-22<br />

20-21<br />

18-20<br />

4 hrs<br />

25 hrs<br />

43 hrs<br />

78 hrs<br />

152 hrs<br />

166 hrs<br />

198 hrs<br />

191 hrs<br />

248 hrs<br />

180 hrs<br />

180 hrs<br />

490 hrs<br />

460 hrs<br />

East Zone Operative Temperature<br />

Percentage of occupied hours above 25°C: 1.74%<br />

West Zone Operative<br />

Temperature<br />

Percentage of occupied hours above 25°C: 3.83%<br />

776 hrs<br />

765 hrs<br />

953 hrs<br />

1,000 hrs<br />

0 200 400 600 800 1000 1200<br />

© atelier ten 2005


BUTTERFIELD, Hamilton Associates<br />

Thermal Simulation using Trnsys<br />

Annual Energy Comsumption (Heating and Ventilation)<br />

(excluding lighting and small power)<br />

[kWh/m 2 ]<br />

250<br />

200<br />

150<br />

100<br />

50<br />

0<br />

Fan energy<br />

Gas total<br />

Space heating -Radiators<br />

Air - heating energy<br />

36<br />

2<br />

7<br />

10<br />

7<br />

11<br />

Earthduct system Earthduct system & HR Natural Ventilation Typical AC (Fan-Coils)<br />

65<br />

128<br />

97<br />

© atelier ten 2005


OFFICE DEVELOPMENT, Leeds, Carey Jones Architects<br />

© atelier ten 2005


GROUND COUPLED COOLING<br />

© atelier ten 2005


GROUND SOURCE HEATING<br />

AND COOLING<br />

© atelier ten 2005


KEBLE COLLEGE, Oxford – Rick Mather Architects<br />

© atelier ten 2005


KEBLE COLLEGE, Oxford – Rick Mather Architects<br />

© atelier ten 2005


HEAT PUMP CIRCUIT<br />

GROUND SOURCE HEAT PUMPS<br />

© atelier ten 2005


HEAT PUMP CIRCUIT<br />

GROUND SOURCE HEAT PUMPS<br />

© atelier ten 2005


HEAT PUMP PRINCIPLE<br />

GROUND SOURCE HEAT PUMPS<br />

© atelier ten 2005


KEBLE COLLEGE, Oxford – Rick Mather Architects<br />

© atelier ten 2005


KEBLE COLLEGE, Oxford – Rick Mather Architects<br />

© atelier ten 2005


GEOTHERMAL ENERGY PROPOSAL<br />

Imperial House, Bristol<br />

GROUND SOURCE HEAT PUMPS<br />

© atelier ten 2005


GEOTHERMAL ENERGY PROPOSAL<br />

Imperial House, Bristol<br />

GROUND SOURCE HEAT PUMPS<br />

© atelier ten 2005


GEOTHERMAL ENERGY PROPOSAL<br />

Imperial House, Bristol for URBAN SPLASH<br />

GROUND SOURCE HEAT PUMPS<br />

© atelier ten 2005


GEOTHERMAL ENERGY PROPOSAL<br />

Imperial House, Bristol for URBAN SPLASH<br />

GROUND SOURCE HEAT PUMPS<br />

© atelier ten 2005


GEOTHERMAL ENERGY<br />

© atelier ten 2005


CONSULTING ENVIRONMENTAL ENGINEERS<br />

London + New York<br />

www.atelierten.com