Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>EPRI</strong>/NAGF/NATF NERC Standards Working Groups &<br />
PPPD User Group meeting<br />
July 10 – 12, 2012<br />
Palo Alto, California<br />
3:30 p.m. Report out all groups (Starr Auditorium)<br />
CIP group issues to be discussed (Demo room) – Leader: J. Sandler, Duke Energy<br />
1:00 p.m. Roundtable discussion of Key Issues All Participants<br />
2:00 p.m. <strong>EPRI</strong> activities related to cyber security G. Rasche. <strong>EPRI</strong><br />
2:30 p.m. Break<br />
3:00 p.m. NATF Security Practices Group K. Perman, NATF<br />
3:30 p.m. Report out all groups (Starr Auditorium)<br />
3:45 p.m. Generator Technical Compliance Experiences in the Australian<br />
National Electricity Market<br />
Adjourn at 4:30 p.m.<br />
P. Lyons, Eraring Energy<br />
Wednesday; July 11, 2012<br />
Time Topic Presenter<br />
7:30 a.m. Breakfast and Registration<br />
8 – 9 a.m. Combined MOD/VAR/FAC and PRC group issue<br />
8:00 a.m. PRC-019-1 Coordination of Generator Voltage Regulator<br />
Controls with Unit Capabilities and Protection<br />
W. Shultz<br />
8:30 a.m. Project 2010-07 Generator Requirements at the Transmission<br />
Interface<br />
9:00 – 3:00 p.m. MOD, VAR, FAC group issues (Starr Auditorium)<br />
T. Crawley<br />
9:00 a.m. Results of May 2 & 3 NERC Meeting on Generator Models R. Cummings, NERC<br />
9:30 a.m. What works, What Doesn’t, What To Do – Session I K. Thomas, PJM,<br />
P. Roman<br />
10:00 a.m. Break<br />
10:30 a.m. What works, What Doesn’t, What To Do – Session II K. Thomas, PJM<br />
P. Roman<br />
11:00 a.m. • Introduction to Energy Production & Infrastructure<br />
Center (EPIC) in UNC Charlotte<br />
Z. Salami, UNCC<br />
• Nuclear Power Plant Electrical Distribution System<br />
One line, Model and Grid Related Issues (Offsite<br />
Power)<br />
11:30 a.m. ARPA-E Project Proposal “Develop Optimized Platform for<br />
System Analyses, Model Configuration Control and Validations<br />
to Efficiently Support Bulk Electric System (BES) Reliability”<br />
Z. Salami, UNCC<br />
12:00 p.m. Lunch<br />
1:00 p.m. Generator VAR Reserves: Experience Using GenVARR<br />
Software<br />
1:30 p.m. Fundamentals of Electrical Equipment Ratings and Failures.<br />
• What signs of failure are detectible?<br />
• Calculation of Transformers Normal and Emergency<br />
Ratings<br />
2:00 p.m. Improving Plant & BES System Reliability and Reducing<br />
Maintenance Costs through Real Time Condition Monitoring<br />
T. Crawley<br />
T. Pink, Dynamic Ratings<br />
T. Pink<br />
Page 2