General Overview & Constra<strong>in</strong>ts<br />

� Brownfield <strong>Project</strong>s to be liquidated over 6 years:<br />

- Cost = A$1.6 Billion<br />

- Human Resource = 1.2 million offshore Man-hours<br />

= 1.0 million onshore Man-hours<br />

� Limited beds offshore<br />

� Limited eng<strong>in</strong>eer<strong>in</strong>g and design resources <strong>in</strong> Perth<br />

� Loss of experienced Operations personnel<br />

� High level of concurrent activities on board NRA<br />

� Unplanned events occur daily on this age<strong>in</strong>g facility<br />

� Reliability of Supply is paramount as gas from these projects already committed<br />

� Delivery of projects over a different timeframe is not an option!<br />

© <strong>Transfield</strong> <strong>Worley</strong> Services 2008<br />

Brownfield <strong>Project</strong>s